Highland
BOTCHA SANDEEP AND OTHERS · Rangareddy · RERA P02400010142
Highland is a plotted development in Maheshwaram Revenue Village, Maheshwaram Mandal, Ranga Reddy District. The registered promoter is BOTCHA SANDEEP AND OTHERS. The layout has a total site area of 35,754.95 sq.m and a plotted area of 20,123.54 sq.m; it is an open residential layout, with no building count, floor configuration or plot count disclosed. The project is registered with TG-RERA under P02400010142, and the promoter’s Form B undertakes completion by 03-Jul-2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Highland RERA record |
| Project type / status | Plotted development; filed as a new project RERA record RERA filing |
| Registered portion / phase | One registered project; no separate phase name disclosed RERA record |
| TG-RERA registration | P02400010142 RERA record |
| Registration validity | 04/07/2025 to 04/07/2028, unless extended by the Authority |
| Registered promoter | BOTCHA SANDEEP AND OTHERS RERA record |
| RERA status | Registered; the certificate states a three-year validity period |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Maheshwaram / Maheshwaram Revenue Village RERA record |
| Mandal / district / PIN | Maheshwaram / Ranga Reddy / 501359 RERA record |
| Project survey numbers and subdivisions | 470/1/1/3, 471/1/1/3, 472/2, 472/1, 473/1/2, 479, 473/1/1, 480-/2 (rendered “480/?/2” in one supplied approval extraction and “480/2” in the local-body release), 473, 471/1/1/2, 470/1/1/2, 471/2, 470/2, 470/1/2, 471/1/2 |
| Total site area | 35,754.95 sq.m |
| Road-affected area | 668.87 sq.m |
| Net site area | 32,224.93 sq.m |
| Boundaries | East: check dam; West and North: others’ land; South: road RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal layout approval | HMDA draft layout, 000047/LO/Plg/HMDA/2025, dated 04 July 2025 |
| Local-body record | Gram Panchayath Maheshwaram releasing order, GPM/LAYOUT/2025, dated 25/08/2025 |
| Approved built-up area | 20,123.54 sq.m is stated in the RERA filing as “Approved Built up Area”; in the layout area statement, 20,123.54 sq.m is identified as plotted area RERA filing Layout record |
| Buildings / floors | Not applicable as a plotted-layout offering; no building count or floor configuration disclosed |
| Layout land-use areas | Plotted area 20,123.54 sq.m; layout roads 8,453.15 sq.m; park 2,829.18 sq.m; social infrastructure 819.18 sq.m; HMDA approval records amenities area as 0 |
| Mortgage areas recorded in the HMDA approval | 6,074.22 sq.m (plots 43–45, 65–67, 73–78, 97–100 and 101–102) and 1,173.92 sq.m (plots 40–42 and 68–71) |
Offering and status
| Field | Record |
|---|---|
| Offering | Residential plots; plot count and plot-size schedule are not established by the supplied RERA records RERA record Layout record |
| Booked / available counts | Not disclosed in the supplied project evidence RERA filing |
| Construction stage | The project is a plotted layout. RERA-filed progress is 70%; this is a declared figure, not an independent site verification RERA record |
| Completion dates | Promoter Form B undertakes completion by 03-Jul-2028; the RERA registration is valid to 04/07/2028 |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied records Document index |
2. The project story
Highland is registered with TG-RERA as a residential plotted development in Maheshwaram Revenue Village, Maheshwaram Mandal, Ranga Reddy District. Its registered land is identified by the survey numbers and subdivisions listed above. The RERA certificate records the project registration; the filed layout documents describe the layout and its land allocations rather than apartment or building construction. RERA record
The HMDA document is a draft layout letter dated 04 July 2025. A Gram Panchayath Maheshwaram releasing order dated 25/08/2025 is also filed and directs compliance with HMDA’s draft proceedings and conditions. The promoter’s Form B declares completion by 03-Jul-2028. The project filing reports 70% completeness, but the supplied evidence does not independently verify site progress or establish that the layout works are complete. RERA record
3. Master plan, architecture & building design
The approved-layout drawing is for an open residential layout, not a building plan. HMDA’s layout area statement records a total site area of 35,754.95 sq.m, a road-affected area of 668.87 sq.m and a net site area of 32,224.93 sq.m. Its stated component areas are 20,123.54 sq.m plotted area, 8,453.15 sq.m layout roads, 2,829.18 sq.m park and 819.18 sq.m social infrastructure; the same approval records amenities area as 0. The 591289 drawing extraction separately lists “Organized open space/park Area/Utility Area” as 2,829.18 sq.m and “Amenity Area Total” as 3,530.02 sq.m; these are retained as drawing-extracted labels, not treated as additional independently verified allocations.
The approval drawing identifies a residential plot use and records a 12.00 m abutting road width; the drawing extraction also lists road widths of 12.00 m and 7.62 m. The approved layout includes road, park/open-space, social-infrastructure and utility allocations. No plot count or complete plot-size schedule is available in the supplied drawing-derived records.
4. Homes, configurations & floor plans
This is a plotted development, so apartment configurations and apartment carpet-area measurements do not apply. The supplied RERA evidence does not establish the total plot count, plot-size bands, or booked and available plot counts. The approved layout drawing identifies a plotted area of 20,123.54 sq.m, but this is an area figure, not a count of saleable plots. Layout record
The floor-plan evidence reports one layout sheet and no measured flats. No plot-level dimensions or floor plans suitable for reporting individual plot sizes are supplied. Floor plans
5. Parking & vehicle circulation
The layout approval provides road areas and records road widths, but the supplied evidence does not establish parking-space counts, visitor parking, accessible parking, EV charging, or a plot-specific parking allocation. No exclusive parking ownership or allotment arrangement is documented in the supplied project records.
6. Amenities, recreation & open spaces
| Description / size | HMDA area statement: 2,829.18 sq.m; the drawing extraction labels this as “Organized open space/park Area/Utility Area” |
|---|---|
| Declared progress / verified status | Included in layout records; completion not independently verified |
| Description / size | 819.18 sq.m in the HMDA layout area statement |
|---|---|
| Declared progress / verified status | Included in layout records; facility use and completion status not specified |
| Description / size | Listed among the drawing’s amenity/utility labels; the local-body release records 403 sq.m as utility area |
|---|---|
| Declared progress / verified status | Recorded in filed documents; completion not independently verified |
| Description / size | Shown among the layout drawing’s amenity/utility labels |
|---|---|
| Declared progress / verified status | Drawing label only; completion not established |
| Description / size | Shown among the layout drawing’s amenity/utility labels; HMDA conditions also require an overhead tank |
|---|---|
| Declared progress / verified status | Required/proposed in the layout record; completion not independently verified |
| Description / size | HMDA conditions list park development and avenue plantation among layout works |
|---|---|
| Declared progress / verified status | Approval condition; no completed status established |
The vendor-provided amenity list includes clubhouse, swimming pool, gym, indoor games and other facilities, but those claims are not adopted as TG-RERA-filed or sanctioned project facilities in this overview. Promoter website
7. Utilities, building services & safety
HMDA’s layout conditions describe required development works including road formation with blacktop, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines and street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval conditions or planned works; the supplied records do not establish their completion, capacities, or independent inspection.
The layout drawing also labels a garbage pit, overhead water tank, septic tank and distribution transformer. The project-level amenities record marks water supply, sewerage, internal roads and footpaths, street lighting, green strip/park, electrical meter room/sub-station/receiving station, and recreational open space as available in the filed record, while showing 0% progress for the listed items. This is a filing status, not verification that the facilities are operational. RERA amenities
No project-specific evidence supplied here establishes water-storage capacity, treatment capacity, power-backup arrangements, fire-safety systems, CCTV/security provisions, accessibility features or EV charging. Document index RERA amenities
8. Location, access & connectivity
The registered location is Maheshwaram, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 501359. The supplied geocode identifies the site area as SubCentre Maheswaram, Maheshwaram, at latitude 17.1327003 and longitude 78.4368306. The location record lists the nearest sampled Outer Ring Road interchange at approximately 10.8 km. Location record
The supplied evidence does not establish project-specific public-transport routes or verified travel times. Nearby school, hospital, bus-depot and other distance claims appearing in vendor data are not TG-RERA-filed location evidence and are not relied on here. Promoter website
9. Developer & development status
TG-RERA registers BOTCHA SANDEEP AND OTHERS as the promoter. The supplied records identify the organization type as “Others”; no corporate registration number or verified registered-office details are established here. A Form B affidavit dated 25-August-2025 is signed by Botcha Sandeep as authorized signatory for Botcha Sandeep & Others and declares the project’s title, funding arrangements and completion undertaking. RERA record RERA filing
The RERA filing reports 70% project completeness. That is a promoter-filed progress figure; the supplied evidence does not independently verify construction or layout-work progress. The promoter’s Form B states a completion target of 03-Jul-2028, while the registration certificate records validity through 04/07/2028. These dates describe different things: the declared completion target and the registration-validity period. RERA record
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02400010142 | Registers Highland under BOTCHA SANDEEP AND OTHERS; identifies the registered location and survey numbers and states validity from 04/07/2025 to 04/07/2028. |
| HMDA draft layout letter, 000047/LO/Plg/HMDA/2025, dated 04 July 2025 | Records the proposed residential open-plot layout, land-area statement, mortgage plots, gift-deed requirement and development conditions. |
| Gram Panchayath Maheshwaram releasing order, GPM/LAYOUT/2025, dated 25/08/2025 | Records release of the layout subject to HMDA’s draft proceedings and conditions. |
| Form B affidavit, dated 25-August-2025 | Promoter declaration that the land is free from encumbrances and undertaking to complete the project by 03-Jul-2028, among other declarations. |
| Layout drawing / plan sheet | Drawing-derived layout and land-use information filed for the project. |
| Commencement / occupancy or completion certificates | No project-specific occupancy or completion certificate is identified in the supplied evidence; the record instead includes the layout approval and local-body release documents. Document index |
1. Project at a glance
Project identity
Registered project name: Highland
Project type / status: Plotted development; filed as a new project
Registered portion / phase: One registered project; no separate phase name disclosed
TG-RERA registration: P02400010142
Registration validity: 04/07/2025 to 04/07/2028, unless extended by the Authority
Registered promoter: BOTCHA SANDEEP AND OTHERS
RERA status: Registered; the certificate states a three-year validity period
Land and geographic identity
Locality / revenue village: Maheshwaram / Maheshwaram Revenue Village
Mandal / district / PIN: Maheshwaram / Ranga Reddy / 501359
Project survey numbers and subdivisions: 470/1/1/3, 471/1/1/3, 472/2, 472/1, 473/1/2, 479, 473/1/1, 480-/2 (rendered “480/?/2” in one supplied approval extraction and “480/2” in the local-body release), 473, 471/1/1/2, 470/1/1/2, 471/2, 470/2, 470/1/2, 471/1/2
Total site area: 35,754.95 sq.m
Road-affected area: 668.87 sq.m
Net site area: 32,224.93 sq.m
Boundaries: East: check dam; West and North: others’ land; South: road
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: HMDA draft layout, 000047/LO/Plg/HMDA/2025, dated 04 July 2025
Local-body record: Gram Panchayath Maheshwaram releasing order, GPM/LAYOUT/2025, dated 25/08/2025
Approved built-up area: 20,123.54 sq.m is stated in the RERA filing as “Approved Built up Area”; in the layout area statement, 20,123.54 sq.m is identified as plotted area
Buildings / floors: Not applicable as a plotted-layout offering; no building count or floor configuration disclosed
Layout land-use areas: Plotted area 20,123.54 sq.m; layout roads 8,453.15 sq.m; park 2,829.18 sq.m; social infrastructure 819.18 sq.m; HMDA approval records amenities area as 0
Mortgage areas recorded in the HMDA approval: 6,074.22 sq.m (plots 43–45, 65–67, 73–78, 97–100 and 101–102) and 1,173.92 sq.m (plots 40–42 and 68–71)
Offering and status
Offering: Residential plots; plot count and plot-size schedule are not established by the supplied RERA records
Booked / available counts: Not disclosed in the supplied project evidence
Construction stage: The project is a plotted layout. RERA-filed progress is 70%; this is a declared figure, not an independent site verification
Completion dates: Promoter Form B undertakes completion by 03-Jul-2028; the RERA registration is valid to 04/07/2028
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied records
2. The project story
Highland is registered with TG-RERA as a residential plotted development in Maheshwaram Revenue Village, Maheshwaram Mandal, Ranga Reddy District. Its registered land is identified by the survey numbers and subdivisions listed above. The RERA certificate records the project registration; the filed layout documents describe the layout and its land allocations rather than apartment or building construction.
The HMDA document is a draft layout letter dated 04 July 2025. A Gram Panchayath Maheshwaram releasing order dated 25/08/2025 is also filed and directs compliance with HMDA’s draft proceedings and conditions. The promoter’s Form B declares completion by 03-Jul-2028. The project filing reports 70% completeness, but the supplied evidence does not independently verify site progress or establish that the layout works are complete.
3. Master plan, architecture & building design
The approved-layout drawing is for an open residential layout, not a building plan. HMDA’s layout area statement records a total site area of 35,754.95 sq.m, a road-affected area of 668.87 sq.m and a net site area of 32,224.93 sq.m. Its stated component areas are 20,123.54 sq.m plotted area, 8,453.15 sq.m layout roads, 2,829.18 sq.m park and 819.18 sq.m social infrastructure; the same approval records amenities area as 0. The 591289 drawing extraction separately lists “Organized open space/park Area/Utility Area” as 2,829.18 sq.m and “Amenity Area Total” as 3,530.02 sq.m; these are retained as drawing-extracted labels, not treated as additional independently verified allocations.
The approval drawing identifies a residential plot use and records a 12.00 m abutting road width; the drawing extraction also lists road widths of 12.00 m and 7.62 m. The approved layout includes road, park/open-space, social-infrastructure and utility allocations. No plot count or complete plot-size schedule is available in the supplied drawing-derived records.
4. Homes, configurations & floor plans
This is a plotted development, so apartment configurations and apartment carpet-area measurements do not apply. The supplied RERA evidence does not establish the total plot count, plot-size bands, or booked and available plot counts. The approved layout drawing identifies a plotted area of 20,123.54 sq.m, but this is an area figure, not a count of saleable plots.
The floor-plan evidence reports one layout sheet and no measured flats. No plot-level dimensions or floor plans suitable for reporting individual plot sizes are supplied.
5. Parking & vehicle circulation
The layout approval provides road areas and records road widths, but the supplied evidence does not establish parking-space counts, visitor parking, accessible parking, EV charging, or a plot-specific parking allocation. No exclusive parking ownership or allotment arrangement is documented in the supplied project records.
6. Amenities, recreation & open spaces
| Description / size | HMDA area statement: 2,829.18 sq.m; the drawing extraction labels this as “Organized open space/park Area/Utility Area” |
|---|---|
| Declared progress / verified status | Included in layout records; completion not independently verified |
| Description / size | 819.18 sq.m in the HMDA layout area statement |
|---|---|
| Declared progress / verified status | Included in layout records; facility use and completion status not specified |
| Description / size | Listed among the drawing’s amenity/utility labels; the local-body release records 403 sq.m as utility area |
|---|---|
| Declared progress / verified status | Recorded in filed documents; completion not independently verified |
| Description / size | Shown among the layout drawing’s amenity/utility labels |
|---|---|
| Declared progress / verified status | Drawing label only; completion not established |
| Description / size | Shown among the layout drawing’s amenity/utility labels; HMDA conditions also require an overhead tank |
|---|---|
| Declared progress / verified status | Required/proposed in the layout record; completion not independently verified |
| Description / size | HMDA conditions list park development and avenue plantation among layout works |
|---|---|
| Declared progress / verified status | Approval condition; no completed status established |
The vendor-provided amenity list includes clubhouse, swimming pool, gym, indoor games and other facilities, but those claims are not adopted as TG-RERA-filed or sanctioned project facilities in this overview.
7. Utilities, building services & safety
HMDA’s layout conditions describe required development works including road formation with blacktop, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines and street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval conditions or planned works; the supplied records do not establish their completion, capacities, or independent inspection.
The layout drawing also labels a garbage pit, overhead water tank, septic tank and distribution transformer. The project-level amenities record marks water supply, sewerage, internal roads and footpaths, street lighting, green strip/park, electrical meter room/sub-station/receiving station, and recreational open space as available in the filed record, while showing 0% progress for the listed items. This is a filing status, not verification that the facilities are operational.
No project-specific evidence supplied here establishes water-storage capacity, treatment capacity, power-backup arrangements, fire-safety systems, CCTV/security provisions, accessibility features or EV charging.
8. Location, access & connectivity
The registered location is Maheshwaram, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 501359. The supplied geocode identifies the site area as SubCentre Maheswaram, Maheshwaram, at latitude 17.1327003 and longitude 78.4368306. The location record lists the nearest sampled Outer Ring Road interchange at approximately 10.8 km.
The supplied evidence does not establish project-specific public-transport routes or verified travel times. Nearby school, hospital, bus-depot and other distance claims appearing in vendor data are not TG-RERA-filed location evidence and are not relied on here.
9. Developer & development status
TG-RERA registers BOTCHA SANDEEP AND OTHERS as the promoter. The supplied records identify the organization type as “Others”; no corporate registration number or verified registered-office details are established here. A Form B affidavit dated 25-August-2025 is signed by Botcha Sandeep as authorized signatory for Botcha Sandeep & Others and declares the project’s title, funding arrangements and completion undertaking.
The RERA filing reports 70% project completeness. That is a promoter-filed progress figure; the supplied evidence does not independently verify construction or layout-work progress. The promoter’s Form B states a completion target of 03-Jul-2028, while the registration certificate records validity through 04/07/2028. These dates describe different things: the declared completion target and the registration-validity period.
10. Approvals, official records & documents
TG-RERA registration certificate, P02400010142: Registers Highland under BOTCHA SANDEEP AND OTHERS; identifies the registered location and survey numbers and states validity from 04/07/2025 to 04/07/2028.
HMDA draft layout letter, 000047/LO/Plg/HMDA/2025, dated 04 July 2025: Records the proposed residential open-plot layout, land-area statement, mortgage plots, gift-deed requirement and development conditions.
Gram Panchayath Maheshwaram releasing order, GPM/LAYOUT/2025, dated 25/08/2025: Records release of the layout subject to HMDA’s draft proceedings and conditions.
Form B affidavit, dated 25-August-2025: Promoter declaration that the land is free from encumbrances and undertaking to complete the project by 03-Jul-2028, among other declarations.
Layout drawing / plan sheet: Drawing-derived layout and land-use information filed for the project.
Commencement / occupancy or completion certificates: No project-specific occupancy or completion certificate is identified in the supplied evidence; the record instead includes the layout approval and local-body release documents.
Frequently asked questions
Is Highland registered with Telangana RERA?
Yes. Highland is registered with the Telangana Real Estate Regulatory Authority as P02400010142; the registration status is New Project.
Who is the developer of Highland?
The promoter named in the RERA registration is BOTCHA SANDEEP AND OTHERS.
Where is Highland located?
Highland is in MAHESWARAM, Maheshwaram, Rangareddy, Telangana (501359).
When will Highland be completed?
The promoter's proposed date of completion filed with RERA is 04/11/2028. This is the promoter's declaration, not a guarantee.
More projects in Maheshwaram



