Green City Colony
MOHAMMED KHALEEL AND OTHER · Mahabubnagar · RERA P01400011257
GREEN CITY COLONY is a plotted development and residential layout in Jadcherla, Jadcherla Mandal, Mahabubnagar District. The registered promoter is MOHAMMED KHALEEL AND OTHER. The registered site extent is 5040.17 sq.m, and the layout has 16 residential plots; drawing-derived plot sizes range from 135.85 sq.m to 263.78 sq.m. The project’s TG-RERA registration number is P01400011257, and its stated completion deadline is 12/05/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | GREEN CITY COLONY |
| Project type | Plotted development; residential layout RERA record |
| Phase / registered portion | A separate phase designation is not disclosed. Registration is for the named project. |
| TG-RERA registration number | P01400011257 |
| Registration validity | Certificate states 2 years, from 12/05/2022 to 12/05/2024. Registration validity is distinct from the completion deadline. |
| Registered promoter | MOHAMMED KHALEEL AND OTHER |
| RERA status | Listed as “On-Going Project” in the project record; the certificate’s stated validity ended 12/05/2024 RERA record. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Jadcherla Promoter website |
| Revenue village | Bureddipalle (also written “Bureddypally” / “Bureddy Pally” in filed documents) RERA record |
| Mandal | Jadcherla RERA record |
| District | Mahabubnagar RERA record |
| PIN | 509001 RERA record |
| Project survey identity | Survey No. 56/2/2; approval/layout records also refer to 56/P and 56. These identifiers are retained as recorded; the project filing identifies 56/2/2 RERA record |
| Registered site extent | 5040.17 sq.m RERA filing |
| Net / total area in layout record | The filed layout sheet states “Total Layout Area 5039.90,” “Net Layout Area 4947.66,” and “Total net layout 4947.70” (sq.m); these are the labels and figures shown in that record. |
| Boundaries (RERA filing) | East: LAND OF CDF AND IN SY NO 56; West: MALLEBOINPALLY SIVAR AND SY NO 35; North: LAND IN SY NO 56; South: EXISTING 15M WIDE ROAD RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | BADEPALLY (JADCHERLA) Municipality/Municipal Corporation; approval record identifies DTCP in the project filing Approvals record |
| Principal layout approval | Tentative Layout Plan No. 0003/LO/3068/2022, dated 12 May 2022 |
| Other approval identifier | TS/018461/2022, shown on the draft technical layout pattern |
| Development form | 16 residential plots in a plotted layout |
| Approved built-up area / building configuration | No built-up area or building floor configuration is supplied for this plotted layout. The draft layout sheet records “NET BUA BUILT UP AREA 0.00” RERA filing. |
| Parking | The draft layout sheet states “PROPOSED NUMBER OF PARKINGS 0”; no separately documented resident or visitor parking allocation is provided. |
Offering and status
| Item | Record |
|---|---|
| Offering | 16 plots; plot schedule count is from the layout drawing Layout record |
| Plot sizes | Software-read from the layout drawing: 16 plots with sizes available for all 16; smallest 135.85 sq.m, median 161.0 sq.m, largest 263.78 sq.m. These are drawing-derived measurements, not RERA-filed unit-area figures Layout record. |
| Booked / available | Not disclosed in the supplied project record RERA filing |
| Construction / development status | A municipal Work Completed Certificate dated 01/04/2024 reports completion of specified layout development works; this is not an occupancy certificate. |
| Completion deadline | RERA filing and promoter declaration state 12/05/2024 RERA record |
| Occupancy / completion certificate status | No occupancy certificate is supplied. The available completion document is a Work Completed Certificate for layout works, not an OC. |
2. The project story
GREEN CITY COLONY is a residential plotted layout in Bureddipalle village, Jadcherla Mandal, Mahabubnagar District. The RERA registration identifies the project as plotted development, and the layout approval record describes 16 plots rather than apartment buildings or villas RERA record.
The layout records residential plots, internal roads, park/open space, social infrastructure and utility land. Its land-use table assigns 3026.71 sq.m (61.17%) to plotted area, 1281.83 sq.m (25.91%) to roads, 447.29 sq.m (9.04%) to organized open space/park, 141.67 sq.m (2.86%) to social infrastructure and 50.20 sq.m (1.01%) to utilities. The municipal approval is described as tentative and includes conditions for infrastructure work and transfer of specified areas to the municipality.
The promoter’s stated completion date was 12/05/2024. A Work Completed Certificate dated 01/04/2024 reports layout works—including roads, drainage, open-space fencing, lighting, electricity, sewerage and protected water supply—as completed. This is a document-based certification of layout development works, not independent site verification of current condition or an occupancy certificate.
3. Master plan, architecture & building design
This is a plotted layout, not a multi-storey building scheme. The layout sheet depicts 16 plots and records the land-use allocation below; plot count and sizes are read from the drawing, with the supplied data cautioning that drawing-derived measurements should be checked against the original sheet Layout record.
| Layout use | Area | Share shown |
|---|---|---|
| Plotted area | 3026.71 sq.m | 61.17% |
| Road area | 1281.83 sq.m | 25.91% |
| Organized open space / park | 447.29 sq.m | 9.04% |
| Social infrastructure | 141.67 sq.m | 2.86% |
| Utility area | 50.20 sq.m | 1.01% |
| Amenity area | 0.00 | 0.00% |
| Common parking area | 0.00 | 0.00% |
The draft technical layout pattern labels internal roads as 10.0 m and also shows road references of 15.00 m existing and 18.00 m proposed, among other road labels. The tentative approval requires roads to be opened for neighbouring-site access and states that the developer is responsible for the layout’s infrastructure and amenities. It also specifies transfer of the approved open-space, utility and road areas to the municipality by registered gift deed before release of the tentative layout.
No building footprint, floor configuration, tower arrangement, apartment common-area plan or building height is provided for this plotted development. The layout sheet records zero net built-up area and zero proposed parking.
4. Homes, configurations & floor plans
The project offers plots, not apartment configurations. The RERA certificate identifies the project as GREEN CITY COLONY and the approval record states 16 plots; booked and available counts are not supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 16 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Drawing-derived plot sizes are software-read from the layout drawing, not RERA-filed unit-area disclosures: 16 plots have sizes recorded, with a smallest of 135.85 sq.m, median of 161.0 sq.m and largest of 263.78 sq.m Layout record. The supplied floor-plan record contains one layout sheet and no building floor plans or apartment units Floor plans.
5. Parking & vehicle circulation
The draft layout sheet records “PROPOSED NUMBER OF PARKINGS 0” and “Common Parking Area 0.00”. No resident, visitor or accessible parking spaces, parking allocations to individual plots, or EV charging provision are documented in the supplied evidence. The layout drawing identifies internal roads, including 10.0 m internal-road labels; the tentative approval requires roads to remain open for access to neighbouring sites.
6. Amenities, recreation & open spaces
The layout approval and its completion certificate describe shared open space and infrastructure. The completion document reports certain works completed as of its stated date; no independent current-condition inspection is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 447.29 sq.m; 9.04% in the layout land-use table | Approval reserves the area; Work Completed Certificate reports open-space fencing completed. Current site condition not independently verified. | |
| Social infrastructure site | 141.67 sq.m; 2.86% | Reserved in the layout; no facility, building or delivery status is specified. | |
| Utility plot / utility land | 50.20 sq.m; 1.01% | Reserved for utilities; no independent site verification supplied. | |
| Internal roads | 1281.83 sq.m; 25.91%; layout labels include 10.0 m internal roads | Work Completed Certificate reports roads completed; current condition not independently verified. |
No clubhouse, indoor recreation facility or separately identified sports facility is documented. The layout’s amenity-area entry is 0.00.
7. Utilities, building services & safety
The tentative layout approval lists water reservoir, overhead tank, internal water-supply pipelines, septic tank/common septic tank or STP, underground drainage, street lights, electric transformer, solid-waste management, avenue plantation and rainwater-harvesting pits as infrastructure or amenities to be carried out. The Work Completed Certificate reports street lighting, electricity facilities, sewerage disposal, protected water supply and rainwater-harvesting pits as completed for the layout as of 01/04/2024. The documents do not provide capacities, equipment specifications, operating records or independent verification of present functionality.
No building fire systems, lifts, backup-power arrangements, CCTV/security system or accessibility design are identified in the supplied evidence. The project is a plotted layout and the available records do not establish building-level statutory compliance.
8. Location, access & connectivity
The registered project location is Bureddipalle, Jadcherla Mandal, Mahabubnagar District, PIN 509001. The RERA filing gives the southern boundary as an existing 15 m-wide road. The layout drawing also labels internal roads and references a 60.0 m-wide National Highway No. 44, but the supplied information does not establish the project’s exact access point to that highway RERA record RERA filing.
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 60.9 km; it is a measured distance entry, not a travel-time estimate Location record.
No other public-transport links or landmark distances are provided.
9. Developer & development status
The registered promoter is MOHAMMED KHALEEL AND OTHER. The RERA filing describes the organization type as “Others” and its description as “Partners”; a more specific legal-entity type and complete corporate registration identifiers are not supplied. The registration certificate gives the promoter office as Village: Ganesh Nagar, Mandal: Mahabubnagar Urban, District: Mahabubnagar, PIN 509001. A project contact number, email address and official website are not supplied RERA record RERA filing Corporate record.
The promoter’s Form B declaration states a completion undertaking of 12th May, 2024. Separately, the Work Completed Certificate dated 01/04/2024 reports completion of specified layout works; it does not establish current site condition or OC status. No phase-wise construction schedule or plot-wise booking/sales status is provided.
10. Approvals, official records & documents
| Identifier / date | P01400011257; issued 29/09/2026 in the supplied extraction; validity stated as 12/05/2022–12/05/2024 |
|---|---|
| What the supplied record establishes | Form C registration for GREEN CITY COLONY and stated registration conditions. |
| Identifier / date | 0003/LO/3068/2022; 12 May 2022; BADEPALLY (JADCHERLA) Municipality/Municipal Corporation |
|---|---|
| What the supplied record establishes | Tentative residential layout approval for 16 plots, with development and transfer conditions. |
| Identifier / date | TS/018461/2022 |
|---|---|
| What the supplied record establishes | Drawing records plot and land-use schedule and labels itself a draft technical layout pattern. |
| Identifier / date | Mortgage Deed No. 8030/2022, 07 May 2022 |
|---|---|
| What the supplied record establishes | Approval records mortgage of Plot Nos. 13, 14 and 15 to the municipality pending layout-development and release conditions. |
| Identifier / date | DCP TLP No. 0003/LO/3068/2022; dated 01/04/2024 |
|---|---|
| What the supplied record establishes | Reports completion of specified layout development works. |
| Identifier / date | Declaration dated 18 October 2025 |
|---|---|
| What the supplied record establishes | Names GREEN CITY COLONY, gives the promoter’s completion undertaking and other declarations. |
No occupancy certificate is included in the supplied documents. The available completion certificate is for layout development works, not building occupancy.
1. Project at a glance
Project identity
Registered project name: GREEN CITY COLONY
Project type: Plotted development; residential layout
Phase / registered portion: A separate phase designation is not disclosed. Registration is for the named project.
TG-RERA registration number: P01400011257
Registration validity: Certificate states 2 years, from 12/05/2022 to 12/05/2024. Registration validity is distinct from the completion deadline.
Registered promoter: MOHAMMED KHALEEL AND OTHER
RERA status: Listed as “On-Going Project” in the project record; the certificate’s stated validity ended 12/05/2024.
Land and geographic identity
Locality: Jadcherla
Revenue village: Bureddipalle (also written “Bureddypally” / “Bureddy Pally” in filed documents)
Mandal: Jadcherla
District: Mahabubnagar
PIN: 509001
Project survey identity: Survey No. 56/2/2; approval/layout records also refer to 56/P and 56. These identifiers are retained as recorded; the project filing identifies 56/2/2
Registered site extent: 5040.17 sq.m
Net / total area in layout record: The filed layout sheet states “Total Layout Area 5039.90,” “Net Layout Area 4947.66,” and “Total net layout 4947.70” (sq.m); these are the labels and figures shown in that record.
Boundaries (RERA filing): East: LAND OF CDF AND IN SY NO 56; West: MALLEBOINPALLY SIVAR AND SY NO 35; North: LAND IN SY NO 56; South: EXISTING 15M WIDE ROAD
Development identity
Sanctioning authority: BADEPALLY (JADCHERLA) Municipality/Municipal Corporation; approval record identifies DTCP in the project filing
Principal layout approval: Tentative Layout Plan No. 0003/LO/3068/2022, dated 12 May 2022
Other approval identifier: TS/018461/2022, shown on the draft technical layout pattern
Development form: 16 residential plots in a plotted layout
Approved built-up area / building configuration: No built-up area or building floor configuration is supplied for this plotted layout. The draft layout sheet records “NET BUA BUILT UP AREA 0.00”.
Parking: The draft layout sheet states “PROPOSED NUMBER OF PARKINGS 0”; no separately documented resident or visitor parking allocation is provided.
Offering and status
Offering: 16 plots; plot schedule count is from the layout drawing
Plot sizes: Software-read from the layout drawing: 16 plots with sizes available for all 16; smallest 135.85 sq.m, median 161.0 sq.m, largest 263.78 sq.m. These are drawing-derived measurements, not RERA-filed unit-area figures.
Booked / available: Not disclosed in the supplied project record
Construction / development status: A municipal Work Completed Certificate dated 01/04/2024 reports completion of specified layout development works; this is not an occupancy certificate.
Completion deadline: RERA filing and promoter declaration state 12/05/2024
Occupancy / completion certificate status: No occupancy certificate is supplied. The available completion document is a Work Completed Certificate for layout works, not an OC.
2. The project story
GREEN CITY COLONY is a residential plotted layout in Bureddipalle village, Jadcherla Mandal, Mahabubnagar District. The RERA registration identifies the project as plotted development, and the layout approval record describes 16 plots rather than apartment buildings or villas.
The layout records residential plots, internal roads, park/open space, social infrastructure and utility land. Its land-use table assigns 3026.71 sq.m (61.17%) to plotted area, 1281.83 sq.m (25.91%) to roads, 447.29 sq.m (9.04%) to organized open space/park, 141.67 sq.m (2.86%) to social infrastructure and 50.20 sq.m (1.01%) to utilities. The municipal approval is described as tentative and includes conditions for infrastructure work and transfer of specified areas to the municipality.
The promoter’s stated completion date was 12/05/2024. A Work Completed Certificate dated 01/04/2024 reports layout works—including roads, drainage, open-space fencing, lighting, electricity, sewerage and protected water supply—as completed. This is a document-based certification of layout development works, not independent site verification of current condition or an occupancy certificate.
3. Master plan, architecture & building design
This is a plotted layout, not a multi-storey building scheme. The layout sheet depicts 16 plots and records the land-use allocation below; plot count and sizes are read from the drawing, with the supplied data cautioning that drawing-derived measurements should be checked against the original sheet.
| Layout use | Area | Share shown |
|---|---|---|
| Plotted area | 3026.71 sq.m | 61.17% |
| Road area | 1281.83 sq.m | 25.91% |
| Organized open space / park | 447.29 sq.m | 9.04% |
| Social infrastructure | 141.67 sq.m | 2.86% |
| Utility area | 50.20 sq.m | 1.01% |
| Amenity area | 0.00 | 0.00% |
| Common parking area | 0.00 | 0.00% |
The draft technical layout pattern labels internal roads as 10.0 m and also shows road references of 15.00 m existing and 18.00 m proposed, among other road labels. The tentative approval requires roads to be opened for neighbouring-site access and states that the developer is responsible for the layout’s infrastructure and amenities. It also specifies transfer of the approved open-space, utility and road areas to the municipality by registered gift deed before release of the tentative layout.
No building footprint, floor configuration, tower arrangement, apartment common-area plan or building height is provided for this plotted development. The layout sheet records zero net built-up area and zero proposed parking.
4. Homes, configurations & floor plans
The project offers plots, not apartment configurations. The RERA certificate identifies the project as GREEN CITY COLONY and the approval record states 16 plots; booked and available counts are not supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 16 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Drawing-derived plot sizes are software-read from the layout drawing, not RERA-filed unit-area disclosures: 16 plots have sizes recorded, with a smallest of 135.85 sq.m, median of 161.0 sq.m and largest of 263.78 sq.m. The supplied floor-plan record contains one layout sheet and no building floor plans or apartment units.
5. Parking & vehicle circulation
The draft layout sheet records “PROPOSED NUMBER OF PARKINGS 0” and “Common Parking Area 0.00”. No resident, visitor or accessible parking spaces, parking allocations to individual plots, or EV charging provision are documented in the supplied evidence. The layout drawing identifies internal roads, including 10.0 m internal-road labels; the tentative approval requires roads to remain open for access to neighbouring sites.
6. Amenities, recreation & open spaces
The layout approval and its completion certificate describe shared open space and infrastructure. The completion document reports certain works completed as of its stated date; no independent current-condition inspection is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 447.29 sq.m; 9.04% in the layout land-use table | Approval reserves the area; Work Completed Certificate reports open-space fencing completed. Current site condition not independently verified. | |
| Social infrastructure site | 141.67 sq.m; 2.86% | Reserved in the layout; no facility, building or delivery status is specified. | |
| Utility plot / utility land | 50.20 sq.m; 1.01% | Reserved for utilities; no independent site verification supplied. | |
| Internal roads | 1281.83 sq.m; 25.91%; layout labels include 10.0 m internal roads | Work Completed Certificate reports roads completed; current condition not independently verified. |
No clubhouse, indoor recreation facility or separately identified sports facility is documented. The layout’s amenity-area entry is 0.00.
7. Utilities, building services & safety
The tentative layout approval lists water reservoir, overhead tank, internal water-supply pipelines, septic tank/common septic tank or STP, underground drainage, street lights, electric transformer, solid-waste management, avenue plantation and rainwater-harvesting pits as infrastructure or amenities to be carried out. The Work Completed Certificate reports street lighting, electricity facilities, sewerage disposal, protected water supply and rainwater-harvesting pits as completed for the layout as of 01/04/2024. The documents do not provide capacities, equipment specifications, operating records or independent verification of present functionality.
No building fire systems, lifts, backup-power arrangements, CCTV/security system or accessibility design are identified in the supplied evidence. The project is a plotted layout and the available records do not establish building-level statutory compliance.
8. Location, access & connectivity
The registered project location is Bureddipalle, Jadcherla Mandal, Mahabubnagar District, PIN 509001. The RERA filing gives the southern boundary as an existing 15 m-wide road. The layout drawing also labels internal roads and references a 60.0 m-wide National Highway No. 44, but the supplied information does not establish the project’s exact access point to that highway.
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 60.9 km; it is a measured distance entry, not a travel-time estimate.
No other public-transport links or landmark distances are provided.
9. Developer & development status
The registered promoter is MOHAMMED KHALEEL AND OTHER. The RERA filing describes the organization type as “Others” and its description as “Partners”; a more specific legal-entity type and complete corporate registration identifiers are not supplied. The registration certificate gives the promoter office as Village: Ganesh Nagar, Mandal: Mahabubnagar Urban, District: Mahabubnagar, PIN 509001. A project contact number, email address and official website are not supplied.
The promoter’s Form B declaration states a completion undertaking of 12th May, 2024. Separately, the Work Completed Certificate dated 01/04/2024 reports completion of specified layout works; it does not establish current site condition or OC status. No phase-wise construction schedule or plot-wise booking/sales status is provided.
10. Approvals, official records & documents
| Identifier / date | P01400011257; issued 29/09/2026 in the supplied extraction; validity stated as 12/05/2022–12/05/2024 |
|---|---|
| What the supplied record establishes | Form C registration for GREEN CITY COLONY and stated registration conditions. |
| Identifier / date | 0003/LO/3068/2022; 12 May 2022; BADEPALLY (JADCHERLA) Municipality/Municipal Corporation |
|---|---|
| What the supplied record establishes | Tentative residential layout approval for 16 plots, with development and transfer conditions. |
| Identifier / date | TS/018461/2022 |
|---|---|
| What the supplied record establishes | Drawing records plot and land-use schedule and labels itself a draft technical layout pattern. |
| Identifier / date | Mortgage Deed No. 8030/2022, 07 May 2022 |
|---|---|
| What the supplied record establishes | Approval records mortgage of Plot Nos. 13, 14 and 15 to the municipality pending layout-development and release conditions. |
| Identifier / date | DCP TLP No. 0003/LO/3068/2022; dated 01/04/2024 |
|---|---|
| What the supplied record establishes | Reports completion of specified layout development works. |
| Identifier / date | Declaration dated 18 October 2025 |
|---|---|
| What the supplied record establishes | Names GREEN CITY COLONY, gives the promoter’s completion undertaking and other declarations. |
No occupancy certificate is included in the supplied documents. The available completion certificate is for layout development works, not building occupancy.
Frequently asked questions
Is GREEN CITY COLONY registered with Telangana RERA?
Yes. GREEN CITY COLONY is registered with the Telangana Real Estate Regulatory Authority as P01400011257; the registration status is On-Going Project.
Who is the developer of GREEN CITY COLONY?
The promoter named in the RERA registration is MOHAMMED KHALEEL AND OTHER.
Where is GREEN CITY COLONY located?
GREEN CITY COLONY is in Jadcherla, Bureddipalle, Mahabubnagar, Telangana (509001).
When will GREEN CITY COLONY be completed?
The promoter's proposed date of completion filed with RERA is 12/05/2024. This is the promoter's declaration, not a guarantee.