GREEN CITY COLONY is a plotted development and residential layout in Jadcherla, Jadcherla Mandal, Mahabubnagar District. The registered promoter is MOHAMMED KHALEEL AND OTHER. The registered site extent is 5040.17 sq.m, and the layout has 16 residential plots; drawing-derived plot sizes range from 135.85 sq.m to 263.78 sq.m. The project’s TG-RERA registration number is P01400011257, and its stated completion deadline is 12/05/2024.

01What we found

RegisteredTG-RERA
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameGREEN CITY COLONY
Project typePlotted development; residential layout RERA record
Phase / registered portionA separate phase designation is not disclosed. Registration is for the named project.
TG-RERA registration numberP01400011257
Registration validityCertificate states 2 years, from 12/05/2022 to 12/05/2024. Registration validity is distinct from the completion deadline.
Registered promoterMOHAMMED KHALEEL AND OTHER
RERA statusListed as “On-Going Project” in the project record; the certificate’s stated validity ended 12/05/2024 RERA record.

Land and geographic identity

ItemRecord
LocalityJadcherla Promoter website
Revenue villageBureddipalle (also written “Bureddypally” / “Bureddy Pally” in filed documents) RERA record
MandalJadcherla RERA record
DistrictMahabubnagar RERA record
PIN509001 RERA record
Project survey identitySurvey No. 56/2/2; approval/layout records also refer to 56/P and 56. These identifiers are retained as recorded; the project filing identifies 56/2/2 RERA record
Registered site extent5040.17 sq.m RERA filing
Net / total area in layout recordThe filed layout sheet states “Total Layout Area 5039.90,” “Net Layout Area 4947.66,” and “Total net layout 4947.70” (sq.m); these are the labels and figures shown in that record.
Boundaries (RERA filing)East: LAND OF CDF AND IN SY NO 56; West: MALLEBOINPALLY SIVAR AND SY NO 35; North: LAND IN SY NO 56; South: EXISTING 15M WIDE ROAD RERA filing

Development identity

ItemRecord
Sanctioning authorityBADEPALLY (JADCHERLA) Municipality/Municipal Corporation; approval record identifies DTCP in the project filing Approvals record
Principal layout approvalTentative Layout Plan No. 0003/LO/3068/2022, dated 12 May 2022
Other approval identifierTS/018461/2022, shown on the draft technical layout pattern
Development form16 residential plots in a plotted layout
Approved built-up area / building configurationNo built-up area or building floor configuration is supplied for this plotted layout. The draft layout sheet records “NET BUA BUILT UP AREA 0.00” RERA filing.
ParkingThe draft layout sheet states “PROPOSED NUMBER OF PARKINGS 0”; no separately documented resident or visitor parking allocation is provided.

Offering and status

ItemRecord
Offering16 plots; plot schedule count is from the layout drawing Layout record
Plot sizesSoftware-read from the layout drawing: 16 plots with sizes available for all 16; smallest 135.85 sq.m, median 161.0 sq.m, largest 263.78 sq.m. These are drawing-derived measurements, not RERA-filed unit-area figures Layout record.
Booked / availableNot disclosed in the supplied project record RERA filing
Construction / development statusA municipal Work Completed Certificate dated 01/04/2024 reports completion of specified layout development works; this is not an occupancy certificate.
Completion deadlineRERA filing and promoter declaration state 12/05/2024 RERA record
Occupancy / completion certificate statusNo occupancy certificate is supplied. The available completion document is a Work Completed Certificate for layout works, not an OC.

2. The project story

GREEN CITY COLONY is a residential plotted layout in Bureddipalle village, Jadcherla Mandal, Mahabubnagar District. The RERA registration identifies the project as plotted development, and the layout approval record describes 16 plots rather than apartment buildings or villas RERA record.

The layout records residential plots, internal roads, park/open space, social infrastructure and utility land. Its land-use table assigns 3026.71 sq.m (61.17%) to plotted area, 1281.83 sq.m (25.91%) to roads, 447.29 sq.m (9.04%) to organized open space/park, 141.67 sq.m (2.86%) to social infrastructure and 50.20 sq.m (1.01%) to utilities. The municipal approval is described as tentative and includes conditions for infrastructure work and transfer of specified areas to the municipality.

The promoter’s stated completion date was 12/05/2024. A Work Completed Certificate dated 01/04/2024 reports layout works—including roads, drainage, open-space fencing, lighting, electricity, sewerage and protected water supply—as completed. This is a document-based certification of layout development works, not independent site verification of current condition or an occupancy certificate.

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey building scheme. The layout sheet depicts 16 plots and records the land-use allocation below; plot count and sizes are read from the drawing, with the supplied data cautioning that drawing-derived measurements should be checked against the original sheet Layout record.

Layout useAreaShare shown
Plotted area3026.71 sq.m61.17%
Road area1281.83 sq.m25.91%
Organized open space / park447.29 sq.m9.04%
Social infrastructure141.67 sq.m2.86%
Utility area50.20 sq.m1.01%
Amenity area0.000.00%
Common parking area0.000.00%

The draft technical layout pattern labels internal roads as 10.0 m and also shows road references of 15.00 m existing and 18.00 m proposed, among other road labels. The tentative approval requires roads to be opened for neighbouring-site access and states that the developer is responsible for the layout’s infrastructure and amenities. It also specifies transfer of the approved open-space, utility and road areas to the municipality by registered gift deed before release of the tentative layout.

No building footprint, floor configuration, tower arrangement, apartment common-area plan or building height is provided for this plotted development. The layout sheet records zero net built-up area and zero proposed parking.

4. Homes, configurations & floor plans

The project offers plots, not apartment configurations. The RERA certificate identifies the project as GREEN CITY COLONY and the approval record states 16 plots; booked and available counts are not supplied.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots16Not disclosedNot disclosedNot disclosedNot applicableNot disclosed

Drawing-derived plot sizes are software-read from the layout drawing, not RERA-filed unit-area disclosures: 16 plots have sizes recorded, with a smallest of 135.85 sq.m, median of 161.0 sq.m and largest of 263.78 sq.m Layout record. The supplied floor-plan record contains one layout sheet and no building floor plans or apartment units Floor plans.

5. Parking & vehicle circulation

The draft layout sheet records “PROPOSED NUMBER OF PARKINGS 0” and “Common Parking Area 0.00”. No resident, visitor or accessible parking spaces, parking allocations to individual plots, or EV charging provision are documented in the supplied evidence. The layout drawing identifies internal roads, including 10.0 m internal-road labels; the tentative approval requires roads to remain open for access to neighbouring sites.

6. Amenities, recreation & open spaces

The layout approval and its completion certificate describe shared open space and infrastructure. The completion document reports certain works completed as of its stated date; no independent current-condition inspection is supplied.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space447.29 sq.m; 9.04% in the layout land-use tableApproval reserves the area; Work Completed Certificate reports open-space fencing completed. Current site condition not independently verified.
Social infrastructure site141.67 sq.m; 2.86%Reserved in the layout; no facility, building or delivery status is specified.
Utility plot / utility land50.20 sq.m; 1.01%Reserved for utilities; no independent site verification supplied.
Internal roads1281.83 sq.m; 25.91%; layout labels include 10.0 m internal roadsWork Completed Certificate reports roads completed; current condition not independently verified.

No clubhouse, indoor recreation facility or separately identified sports facility is documented. The layout’s amenity-area entry is 0.00.

7. Utilities, building services & safety

The tentative layout approval lists water reservoir, overhead tank, internal water-supply pipelines, septic tank/common septic tank or STP, underground drainage, street lights, electric transformer, solid-waste management, avenue plantation and rainwater-harvesting pits as infrastructure or amenities to be carried out. The Work Completed Certificate reports street lighting, electricity facilities, sewerage disposal, protected water supply and rainwater-harvesting pits as completed for the layout as of 01/04/2024. The documents do not provide capacities, equipment specifications, operating records or independent verification of present functionality.

No building fire systems, lifts, backup-power arrangements, CCTV/security system or accessibility design are identified in the supplied evidence. The project is a plotted layout and the available records do not establish building-level statutory compliance.

8. Location, access & connectivity

The registered project location is Bureddipalle, Jadcherla Mandal, Mahabubnagar District, PIN 509001. The RERA filing gives the southern boundary as an existing 15 m-wide road. The layout drawing also labels internal roads and references a 60.0 m-wide National Highway No. 44, but the supplied information does not establish the project’s exact access point to that highway RERA record RERA filing.

The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 60.9 km; it is a measured distance entry, not a travel-time estimate Location record.

No other public-transport links or landmark distances are provided.

9. Developer & development status

The registered promoter is MOHAMMED KHALEEL AND OTHER. The RERA filing describes the organization type as “Others” and its description as “Partners”; a more specific legal-entity type and complete corporate registration identifiers are not supplied. The registration certificate gives the promoter office as Village: Ganesh Nagar, Mandal: Mahabubnagar Urban, District: Mahabubnagar, PIN 509001. A project contact number, email address and official website are not supplied RERA record RERA filing Corporate record.

The promoter’s Form B declaration states a completion undertaking of 12th May, 2024. Separately, the Work Completed Certificate dated 01/04/2024 reports completion of specified layout works; it does not establish current site condition or OC status. No phase-wise construction schedule or plot-wise booking/sales status is provided.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01400011257; issued 29/09/2026 in the supplied extraction; validity stated as 12/05/2022–12/05/2024
What the supplied record establishesForm C registration for GREEN CITY COLONY and stated registration conditions.
Tentative layout approval
Identifier / date0003/LO/3068/2022; 12 May 2022; BADEPALLY (JADCHERLA) Municipality/Municipal Corporation
What the supplied record establishesTentative residential layout approval for 16 plots, with development and transfer conditions.
Draft technical layout pattern
Identifier / dateTS/018461/2022
What the supplied record establishesDrawing records plot and land-use schedule and labels itself a draft technical layout pattern.
Mortgage record cited in approval
Identifier / dateMortgage Deed No. 8030/2022, 07 May 2022
What the supplied record establishesApproval records mortgage of Plot Nos. 13, 14 and 15 to the municipality pending layout-development and release conditions.
Work Completed Certificate
Identifier / dateDCP TLP No. 0003/LO/3068/2022; dated 01/04/2024
What the supplied record establishesReports completion of specified layout development works.
Promoter declaration (Form B)
Identifier / dateDeclaration dated 18 October 2025
What the supplied record establishesNames GREEN CITY COLONY, gives the promoter’s completion undertaking and other declarations.

No occupancy certificate is included in the supplied documents. The available completion certificate is for layout development works, not building occupancy.

Frequently asked questions

Is GREEN CITY COLONY registered with Telangana RERA?

Yes. GREEN CITY COLONY is registered with the Telangana Real Estate Regulatory Authority as P01400011257; the registration status is On-Going Project.

Who is the developer of GREEN CITY COLONY?

The promoter named in the RERA registration is MOHAMMED KHALEEL AND OTHER.

Where is GREEN CITY COLONY located?

GREEN CITY COLONY is in Jadcherla, Bureddipalle, Mahabubnagar, Telangana (509001).

When will GREEN CITY COLONY be completed?

The promoter's proposed date of completion filed with RERA is 12/05/2024. This is the promoter's declaration, not a guarantee.