Sign in

Sunshine Apartments

SKY INFRAA SUNSHINE · Rangareddy · RERA P02400011254

SUNSHINE APARTMENTS is a residential apartment project in Shankarpally Village, Shankarpalle Mandal, Ranga Reddy District. The registered promoter is SKY INFRAA SUNSHINE, represented by SRIVATSA REDDY KAIRUPPALLA AND OTHERS. The project covers 1,618.77 sq. m and comprises one residential building with a stilt floor and 5 upper floors, with 35 homes: 22 2BHK units of 105.49 sq. m each and 13 3BHK units of 129.52 sq. m each. It is registered with TG-RERA under P02400011254, with proposed completion by 15 June 2029.

01What we found

RegisteredTG-RERA - valid till 15 Jun 2029
27documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSUNSHINE APARTMENTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied registration record; the project is registered as SUNSHINE APARTMENTS. RERA record
TG-RERA registrationP02400011254 RERA record
Registration validity15/06/2026 to 15/06/2029; the certificate was issued 29/09/2026. This is the registration-validity period, not a separate statement of completion or occupancy. RERA record
Registered promoterSKY INFRAA SUNSHINE, represented in the certificate by SRIVATSA REDDY KAIRUPPALLA AND OTHERS RERA record Corporate record
RERA statusA TG-RERA Form C registration certificate is supplied.

Land and geographic identity

FieldRecord
Locality / revenue villageShankerpally / Shankarpally; the supplied registration and approval records identify Shankarpally Village. RERA record
MandalShankarpalle RERA record
DistrictRanga Reddy RERA record
PIN501202 RERA record
Project survey numbers and recorded old-survey references214/A4AA/1/2 (Old Sy No 214/A4); 214/A4E/2 (Old Sy No 214/1); 214/A2/2/1/2 (Old Sy No 214/A4); 214/A2/2/1/2 (Old Sy No 214/A/2). The registration certificate lists 214/A4AA/1/2, 214/A4E/2 and 214/A2/2/1/2; the municipality proceedings also give the old-survey references. RERA record RERA filing
Registered site extent1,618.77 sq. m in the RERA land details and approval proceedings. RERA filing
Total / net areaTotal area: 1,618.77 sq. m; net area: 1,618.77 sq. m; affected area: 0 sq. m, as recorded in the RERA land details. RERA filing
Boundaries in RERA land detailsEast: Neighbours Land; West: Road; North: Neighbours Land; South: Neighbours Land. RERA filing

Development identity

FieldRecord
Technical sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the HMDA technical approval was addressed to Shankerpally Municipality. Approvals record
Local-body proceedingsProc. No. G1/BP/480/2026, Shankarpally Municipality, dated 22/07/2026. Approvals record
Principal approval number / date000440/BP/HMDA/0119/SKP/2025, HMDA technical approval dated 15-06-2026. Approvals record
Building / configurationOne residential building, Stilt + 5 Upper floors, in the technical approval and municipal proceedings. RERA filing
Approved built-up area3828.17 sq. m in the RERA project information. The approval materials supplied also contain drawing-extracted area figures; those OCR figures are not used here as a substitute for the RERA-filed figure. RERA filing
Parking / mortgageThe approval records a 10% built-up-area mortgage in favour of the Metropolitan Commissioner, HMDA. The supplied record does not establish a complete parking-space count or unit-by-unit parking allocation.
Units35 units in the RERA filing: 22 two-bedroom and 13 three-bedroom units. RERA unit table

Offering and status

FieldRecord
RERA-filed configurations and saleable areas2BHK: 22 units, 105.49 sq. m each; 3BHK: 13 units, 129.52 sq. m each. RERA unit table RERA unit details
Booked / availableThe portal record shows 0 booked and 35 available (22 2BHK and 13 3BHK). The supplied booking record has no as-of date, so counts are indicative rather than a dated snapshot. RERA unit table
Construction stageNo independently verified site-progress record is supplied. The RERA amenity schedule shows 0% for the listed progress fields; this is not a verified site inspection. RERA amenities
Completion dateThe Form B declaration states completion within three years from permission, by 15 June 2029.
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied documents. The project is presented as a registered project with a proposed completion date; no completed or occupancy-certified portion is established by this evidence. Document index

2. The project story

SUNSHINE APARTMENTS is registered with TG-RERA as a residential apartment project in Shankarpally Village, Shankarpalle Mandal, Ranga Reddy District. The RERA land schedule identifies the project parcel by survey references 214/A4AA/1/2, 214/A4E/2 and 214/A2/2/1/2, with old-survey references also recorded in the approval proceedings. RERA record

The approved development is described as a single residential building comprising a stilt floor and five upper floors. The RERA filing lists 35 homes—22 2BHK and 13 3BHK—and gives saleable areas for both configurations. The RERA portal’s booking figures show all 35 as available and none booked, but the record does not state when those figures were captured. RERA unit table

The promoter’s Form B declares completion by 15 June 2029. No construction-progress evidence independently verifies how much work has been completed, and no occupancy or completion certificate is supplied. The approval conditions contemplate occupation only after construction in accordance with the technically approved plans and the applicable fit-for-occupancy process.

3. Master plan, architecture & building design

The approved building form recorded in the HMDA technical approval and Shankarpally Municipality proceedings is one residential building, Stilt + 5 Upper floors, on a site extent of 1,618.77 sq. m. The RERA filing records an approved built-up area of 3828.17 sq. m. These are distinct filed measures; the supplied data does not establish an FSI-counted area or a verified building-footprint figure. RERA filing

The drawing extracts describe the proposal as a residential apartment and show stilt parking, a tot lot and a 2.0M wide corridor. They also contain OCR-extracted floor-area and site-area strings that are not reliably legible; those figures are not treated here as verified measurements.

The approval conditions require the approved circulation pattern and earmarked open space to be retained; they state that the open space is to remain open and be developed with greenery. The material supplied does not establish the number of flats per floor, lifts, stairs, building footprint, landscaping extent or phase-wise organization.

4. Homes, configurations & floor plans

The following unit counts and saleable areas are RERA-filed. The supplied floor-plan review records two drawings, both pending scan review, with no software-measured carpet areas available. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK22022105.49 sq. mNot measured; drawing scans pending reviewNot supplied
3BHK13013129.52 sq. mNot measured; drawing scans pending reviewNot supplied

The filing’s saleable-area figures are not carpet-area measurements. No drawing-derived room dimensions, orientation, balcony or utility measurements are available in the supplied material. The portal booking counts have no stated as-of date. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

The building approval identifies a stilt floor for parking, and the plan extract labels parking. No reliable count of car or two-wheeler spaces, visitor or accessible spaces, mechanical parking, EV charging, or parking allocation by unit is supplied. A drawn parking area does not establish an exclusive parking right for a particular home.

The approval conditions state that the approved internal circulation pattern is to be retained and that the earmarked parking area and circulation are not to be altered. The supplied records do not establish ramp details, separate pedestrian circulation, or a complete entry/exit arrangement.

6. Amenities, recreation & open spaces

The RERA amenity schedule lists facilities and records 0% for its progress fields; the available evidence does not verify completion on site. The approval and plan documents identify certain proposed or required items, which are distinguished below from verified delivery. RERA amenities

Tot lot / green strip
Description / sizeSize not established in legible supplied evidence
Evidence sourceRERA amenity schedule; plan extract RERA amenities
Declared progress / verified statusRERA schedule says “YES” for Green Strip/TOT LOT/Park; progress shown as 0%. Completion not independently verified.
Community buildings
Description / sizeNo size or quantity supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusProgress shown as 0%; no completion evidence supplied.
Aggregate recreational open space
Description / sizeArea not reliably established
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusProgress shown as 0%; completion not independently verified.

No clubhouse or indoor facility, sports facility, or further recreation feature is established in the supplied project evidence.

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterThe RERA amenity schedule marks water supply “YES”; it gives no confirmed source, storage capacity or treatment capacity. Approval conditions address water-source location, bore depth and disinfection of sump/overhead-tank water, and require the developer to approach HMWS&SB for bulk supply or provide a water-treatment plant. These are approval requirements, not proof of completed service. RERA amenities
Sewerage and drainageThe RERA schedule marks sewerage “YES” and lists storm-water drains and treatment/disposal of sewage and sullage water, with progress shown as 0%. The approval conditions refer to a septic tank and set out requirements for connection of treated sewage to a municipal drain where available, or to a natural drain/nala in the stated circumstances. Completed operation or treatment capacity is not evidenced. RERA amenities
Rainwater harvestingMarked “YES” in the RERA amenity schedule; HMDA approval conditions require rainwater-harvesting structures. Completion is not verified. RERA amenities
ElectricalThe RERA schedule lists an electrical meter room/sub-station/receiving station, with progress shown as 0%. Approval proceedings require provision for a transformer; completed installation or capacity is not supplied. RERA amenities
Fire and life safetyFire protection and fire-safety requirements appear in the RERA schedule with 0% progress. The approvals require fire-safety requirements to be complied with and refer to fire-service norms. No separate fire clearance or completed-system evidence is supplied. RERA amenities
WasteThe RERA schedule lists solid-waste management and disposal with progress shown as 0%; the approval proceedings require a garbage house. Completion and operating arrangements are not verified. RERA amenities
Lifts, backup power, security and accessibilityNo lift count or capacity, backup-power provision, CCTV/access-control system, accessible circulation or ramp details are established in the supplied material. Document index RERA amenities

8. Location, access & connectivity

The registered project location is Shankarpally Village, Shankarpalle Mandal, Ranga Reddy District, Telangana, PIN 501202. The RERA land details describe the west boundary as a road and the other three boundaries as neighbouring land. RERA record RERA filing

The supplied location record gives a cadastral parcel-centroid coordinate of 17.450710092109897, 78.14196531736305 and lists the nearest sampled Outer Ring Road interchange at approximately 15.3 km. No travel time, named approach road, public-transport detail or other landmark distance is supplied. Location record

9. Developer & development status

The registered promoter is SKY INFRAA SUNSHINE, recorded as a partnership in the project filing, with GSTIN 36AFEFS6235G1ZW. The certificate names the promoter as represented by SRIVATSA REDDY KAIRUPPALLA AND OTHERS. The certificate’s promoter-office address is Village: Mallampet, Mandal: Bachupally, District: Medchal-Malkajgiri, Pin: 500090; the filing also gives an address at AISHWARYA HEIGHTS, KVR VALLY, Shankerpally, Shankarpally, Shankarpalle, Ranga Reddy, 501202. Corporate record RERA filing

The project record identifies VENKATA MURALI KRISHNA POTTIGARI as a partner and SRIVATSA REDDY KAIRUPPALLA as an authorized signatory. The promoter’s Form B affidavit declares a completion target of 15 June 2029 and makes the associated project-fund and approval undertakings; these are promoter declarations, not independent progress verification. Parties record

No official project website or contact details are established in the supplied evidence. The registration certificate and Form B identify the project completion timeline, but the supplied record does not establish a verified construction stage or an issued occupancy certificate. Document index

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400011254; issued 29/09/2026; validity 15/06/2026–15/06/2029
What it establishesRegistration of SUNSHINE APARTMENTS under section 5 and the certificate’s stated promoter obligations.
HMDA technical building approval
Identifier / date000440/BP/HMDA/0119/SKP/2025; 15-06-2026
What it establishesTechnical approval for a residential building of Stilt + 5 Upper floors on the stated Shankarpally land, subject to conditions.
Shankarpally Municipality proceedings
Identifier / dateProc. No. G1/BP/480/2026; 22/07/2026
What it establishesMunicipal proceedings releasing the HMDA technical building permission, subject to conditions.
Building-plan drawings filed with RERA
Identifier / dateDocuments 717686 and 751058
What it establishesDrawing extracts for the proposed residential apartment; some OCR-extracted identifiers and area strings are illegible or truncated.
Form B declaration
Identifier / dateDated 25 July 2026
What it establishesPromoter’s declarations, including the completion undertaking and project-fund commitments.
Mortgage deed
Identifier / dateDocument 717715, dated 17-03-2026
What it establishesRecords an HMDA mortgage of 10.78% of proposed built-up area, with identified flats, as security connected with the permission conditions.
Occupancy / completion certificate
Identifier / dateNot supplied
What it establishesNo issued certificate is established by the documents reviewed. Document index

The available approvals include technical approval and municipal proceedings for the building. The supplied evidence does not include a separate approved-layout certificate or an occupancy/completion certificate. Some plan drawing text is OCR-degraded; where figures or identifiers could not be read reliably, they have not been treated as verified values.

Frequently asked questions

Is SUNSHINE APARTMENTS registered with Telangana RERA?

Yes. SUNSHINE APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P02400011254; the registration status is New Project.

Who is the developer of SUNSHINE APARTMENTS?

The promoter named in the RERA registration is SKY INFRAA SUNSHINE.

Where is SUNSHINE APARTMENTS located?

SUNSHINE APARTMENTS is in Shankerpally, Shankarpally, Shankarpalle, Rangareddy, Telangana (501202).

When will SUNSHINE APARTMENTS be completed?

The promoter's proposed date of completion filed with RERA is 15/06/2029. This is the promoter's declaration, not a guarantee.

More projects in Shankarpally