Ayyappa Brindavan
HARINDA CONSTRUCTIONS · Nizamabad · RERA P03100011317
AYYAPPA BRINDAVAN is a residential apartment project near Rythu Bazar in Kanteshwar, Nizamabad East (New), Nizamabad. It is being developed by the registered promoter HARINDA CONSTRUCTIONS. The project has a site area of 2744.93 sq. m and one apartment building with 1 Stilt + 5 Floors and 50 homes: 35 2BHK units of 144.89 sq. m saleable area each and 15 3BHK units of 161.37 sq. m saleable area each. Its TG-RERA registration number is P03100011317, and its proposed completion date is 17/01/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | AYYAPPA BRINDAVAN RERA record |
| Project type / phase | Residential apartment project; phase or separately identified registered portion is not disclosed. The sanctioned proposal is for one apartment building. RERA record RERA filing |
| TG-RERA registration | P03100011317 |
| Registration validity | 17/01/2026–17/01/2029; registration certificate issued 16/10/2026. This is registration validity, not evidence of completion or occupancy. |
| Registered promoter | HARINDA CONSTRUCTIONS; entity type filed as Proprietorship. RERA record RERA filing |
| RERA status | Registered under section 5; the certificate records a three-year validity period. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / site description | NEAR RYTHU BAZAR; the building permit describes the site as JANMABHOOMI ROAD, NIZAMABAD. RERA record Promoter website |
| Revenue village | KANTESHWAR. The building permit extraction also describes its location as Nizamabad; the RERA certificate identifies Kanteshwar, Nizamabad East (New). RERA record |
| Mandal / district / PIN | NIZAMABAD EAST (NEW) / Nizamabad / 503002. RERA record |
| Project survey number(s) | Survey No. 77; no project subdivision is stated in the supplied project identity and approval records. RERA record Land records |
| Site area | RERA/building-permit record: 2744.93 sq. m total and net plot area; road-affected and nala-affected areas are each recorded as 0 sq. m. The cadastral record separately reports 11,305.21 sq. m for the whole Survey No. 77, not the project site extent. Cadastral map |
| Boundaries | North: Neighbours Plot; South: 80 feet Wide Road; East: Neighbours Plot; West: Land of Satyanarayana Dhanraj Bajaj. RERA filing |
| Plot / house reference | 6-22-851. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Nizamabad Municipal Corporation. The RERA filing lists DTCP as Authority Name; the building-permit document identifies Nizamabad Municipal Corporation as the issuing authority. Approvals record RERA filing |
| Principal building approval | Building Permit Order 0037/NIZA/SWBP/2026, approved 17/01/2026; file no. 011293/NIZA/00083/SWBP/2025. Approvals record |
| Approved built-up area | 6294.7 Sq. Mtrs. RERA filing |
| Building count / configuration | 1 building, named APARTMENT; sanctioned as 1 Stilt + 5 Floors, with stated building height 14.7 m. Basement, podium and separate parking-level details are not stated in the supplied extraction. RERA filing |
| Parking | Sanctioned Total Parking Area 1294.07 Sq. Mtrs; the permit says cellar and stilt areas approved for parking are to be used exclusively for parking. A space count is not supplied. |
| Unit count | 50 units in the sanctioned plan and 50 RERA-filed units. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK: 35 units, saleable area 144.89 sq. m each; 3BHK: 15 units, saleable area 161.37 sq. m each. RERA unit table RERA unit details |
| Booked / available | Portal-derived counts show 0 booked / 50 available (35 2BHK and 15 3BHK). The portal record has no as-of date, so these counts are indicative, not a current reservation confirmation. RERA unit table |
| Completion deadline | 17/01/2029, stated in the RERA filing and building permit. No original/revised date history is supplied. RERA record |
| Construction stage | No independently verified site-progress report or construction-stage percentage is supplied. The amenity record shows 0% progress for listed items; this does not establish the overall construction percentage. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records. The permit requires an occupancy certificate before occupation. Document index |
2. The project story
AYYAPPA BRINDAVAN is registered as a residential apartment project in Kanteshwar, Nizamabad, on Survey No. 77. The registered site is recorded as 2744.93 sq. m and is described in the land schedule as adjoining an 80 feet Wide Road on the south. RERA record Land records RERA filing
The approved proposal is a single apartment building, 1 Stilt + 5 Floors, for 50 dwelling units. The RERA filing lists 35 two-bedroom and 15 three-bedroom homes. The supplied records establish the approved proposal and RERA registration, but do not provide independently verified construction progress, a site-completion status, or an occupancy certificate. RERA unit table Document index
3. Master plan, architecture & building design
The building permit records a 2744.93 Sq. Mtrs plot area and net plot area, 6294.7 Sq. Mtrs of residential upper-floor built-up area, one building, a height of 14.7 m, and 1 Stilt + 5 Floors. It also records Total Parking Area 1294.07 Sq. Mtrs. These are approval-record figures; no separate FSI-counted area, gross built-up area, building footprint, floor-by-floor unit arrangement, or tower-height breakdown is supplied.
The permit lists setbacks of Front 5.08 m, Rear 6.0 m, Side I 6.0 m and Side II 6.0 m. It records a Tot Lot of 145.78 Sq. Mtrs, 1 rainwater-harvesting pit and 130 trees. The supplied material does not provide enough drawing-derived detail to describe lifts, stairs, flat distribution by floor, internal circulation, or other open-space layout.
4. Homes, configurations & floor plans
The RERA filing lists 50 homes in two configurations. Saleable areas below are RERA-filed figures. No measured carpet-area values are available: the supplied drawing review reports one drawing, but it failed measurement. RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 35 | 0 | 35 | 144.89 sq. m | Not measured | Not supplied |
| 3BHK | 15 | 0 | 15 | 161.37 sq. m | Not measured | Not supplied |
The filing labels the areas as saleable area; it does not provide carpet-area measurements or a loading figure. Drawing-based carpet area is a software measurement rather than a RERA disclosure, and no successful measurement is available for this project. Booked/available counts are portal-derived and undated, so they should be confirmed against current inventory before purchase. RERA unit details RERA unit table
5. Parking & vehicle circulation
The building permit records Total Parking Area 1294.07 Sq. Mtrs and requires approved cellar and stilt parking areas to be used exclusively for vehicle parking, without partitions or conversion to another use. The permit’s extracted floor description identifies 1 Stilt + 5 Floors, but the supplied record does not give a car or two-wheeler space count, visitor or accessible-space allocation, ramp arrangement, or unit-specific parking allocation.
No exclusive parking ownership or allocation to an individual apartment is established by the supplied overview records. The sanctioned parking area should not be read as a count of spaces or as proof of a particular unit’s parking rights.
6. Amenities, recreation & open spaces
The following facilities appear in the RERA amenity record. Its entries marked “YES” are recorded as provisions; the progress field is 0% for each listed item. The permit separately specifies certain site provisions. Neither record establishes that a facility has been completed or independently inspected. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or detail supplied | RERA amenity record | 0%; completion not verified |
| Internal roads and footpaths | No dimensions supplied | RERA amenity record | 0%; completion not verified |
| Street lighting | No detail supplied | RERA amenity record | 0%; completion not verified |
| Water supply | Listed as “YES”; system details not supplied | RERA amenity record | 0%; completion not verified |
| Sewerage | Listed as “YES” for chamber, lines, septic tank/STP; facility-specific details not supplied | RERA amenity record | 0%; completion not verified |
| Treatment and disposal of sewage and sullage water | Listed as “YES”; no treatment capacity supplied | RERA amenity record | 0%; completion not verified |
| Storm-water drains | Listed as “YES”; no dimensions supplied | RERA amenity record | 0%; completion not verified |
| Green strip / Tot Lot / Park | Listed as “YES”; permit records a Tot Lot of 145.78 Sq. Mtrs | RERA amenity record; building permit | RERA progress 0%; completion not verified |
| Aggregate recreational open space | No area supplied | RERA amenity record | 0%; completion not verified |
| Solid-waste management and disposal | Listed as “YES”; no system details supplied | RERA amenity record | 0%; completion not verified |
| Water conservation / rainwater harvesting | Listed as “YES”; permit records 1 rainwater-harvesting pit | RERA amenity record; building permit | RERA progress 0%; completion not verified |
| Energy management | No detail supplied | RERA amenity record | 0%; completion not verified |
| Fire protection and fire-safety requirements | Listed as “YES”; permit specifies fire-safety conditions | RERA amenity record; building permit | RERA progress 0%; completion not verified |
| Electrical meter room / sub-station / receiving station | Listed as “YES”; equipment details not supplied | RERA amenity record | 0%; completion not verified |
| Trees | Permit records 130 trees and requires planting/greenery provisions | Building permit | Completion not verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, sewage and sullage treatment/disposal, storm-water drains, solid-waste management, rainwater harvesting, fire protection and an electrical meter room/sub-station/receiving station. It does not provide system capacities, design specifications, or independent completion evidence. RERA amenities
The building permit requires a rainwater-harvesting structure, a transformer space, a garbage house, a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, fire extinguishers, manually operated alarm systems, hose reels and down corners. It specifies separate underground and terrace water-storage tanks of 25,000 L each for residential buildings, and requires an automatic sprinkler system if basement area exceeds 200 Sq. Mtrs. These are permit conditions, not confirmation that the systems have been installed or commissioned.
The permit also requires one entry and one exit, each with minimum width 4.5 mts and height clearance 5 mts, and fire-resistant swing doors for collapsible lifts on all floors. It assigns responsibility for fire and structural safety and requires an occupancy certificate before occupation. The supplied records do not state lift number or capacity, accessibility provisions, or completed fire-safety inspection status.
8. Location, access & connectivity
The registered location is NEAR RYTHU BAZAR, Kanteshwar, Nizamabad East (New), Nizamabad, Telangana, 503002. The project’s southern boundary is recorded as an 80 feet Wide Road; the building-permit description places the site at Janmabhoomi Road, Nizamabad. RERA record RERA filing
The supplied connectivity record lists the nearest sampled Outer Ring Road interchange at approximately 124.5 km. No other measured distances, public-transport information, or project-specific approach-route details are supplied. Location record
9. Developer & development status
The RERA-registered promoter is HARINDA CONSTRUCTIONS, filed as a Proprietorship. The named authorized signatory is KATIKANENI RAHUL KUMAR. The supplied records do not disclose a verified corporate registration identifier, official project website, or project contact details. RERA filing Parties record
The promoter’s Form B declaration, dated August 2026, states a completion undertaking of 17th January 2029, refers to Development Agreement-cum-General Power of Attorney No. 6475/2025, and declares the land free from encumbrances. These are promoter declarations in the filed affidavit. The project is registered through 17/01/2029; that registration-validity period is distinct from the stated completion deadline. No verified construction-progress percentage or occupancy certificate is supplied.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Certificate FORM ‘C’, project no. P03100011317, issued 16/10/2026; validity 17/01/2026–17/01/2029. |
| Building permit | Nizamabad Municipal Corporation Building Permit Order 0037/NIZA/SWBP/2026, approved 17/01/2026; file no. 011293/NIZA/00083/SWBP/2025. Sanctions one apartment building, 1 Stilt + 5 Floors, and 50 units. |
| RERA authority field | TG-RERA filing lists DTCP as Authority Name and plan approval no. 0037/NIZA/SWBP/2026. RERA filing Approvals record |
| Commencement / occupancy status | The supplied approval document is a building permit order. No separate occupancy/completion certificate is included; the permit requires an occupancy certificate before occupation. Document index |
| Municipal mortgage deed | Mortgage Deed 204-2026, dated 09/01/2026, records 634.71 Sq. Mtrs of first-floor built-up area in favour of the Commissioner, Nizamabad Municipal Corporation. |
| Development agreement | Registered Development Agreement-cum-GPA 6475/2025, dated 30 July 2025, is identified in the project records as the promoter’s development-rights instrument. |
| RERA filing declaration | Form B affidavit by authorized signatory KATIKANENI RAHUL KUMAR, dated August 2026. |
The supplied index does not include a separate approved-layout document, a complete set of building drawings, or an occupancy/completion certificate. The building-permit order contains additional construction, service and safety conditions; this overview summarizes relevant recorded provisions rather than reproducing the full conditions. Document index
1. Project at a glance
Project identity
Registered project name: AYYAPPA BRINDAVAN
Project type / phase: Residential apartment project; phase or separately identified registered portion is not disclosed. The sanctioned proposal is for one apartment building.
TG-RERA registration: P03100011317
Registration validity: 17/01/2026–17/01/2029; registration certificate issued 16/10/2026. This is registration validity, not evidence of completion or occupancy.
Registered promoter: HARINDA CONSTRUCTIONS; entity type filed as Proprietorship.
RERA status: Registered under section 5; the certificate records a three-year validity period.
Land and geographic identity
Locality / site description: NEAR RYTHU BAZAR; the building permit describes the site as JANMABHOOMI ROAD, NIZAMABAD.
Revenue village: KANTESHWAR. The building permit extraction also describes its location as Nizamabad; the RERA certificate identifies Kanteshwar, Nizamabad East (New).
Mandal / district / PIN: NIZAMABAD EAST (NEW) / Nizamabad / 503002.
Project survey number(s): Survey No. 77; no project subdivision is stated in the supplied project identity and approval records.
Site area: RERA/building-permit record: 2744.93 sq. m total and net plot area; road-affected and nala-affected areas are each recorded as 0 sq. m. The cadastral record separately reports 11,305.21 sq. m for the whole Survey No. 77, not the project site extent.
Boundaries: North: Neighbours Plot; South: 80 feet Wide Road; East: Neighbours Plot; West: Land of Satyanarayana Dhanraj Bajaj.
Plot / house reference: 6-22-851.
Development identity
Sanctioning authority: Nizamabad Municipal Corporation. The RERA filing lists DTCP as Authority Name; the building-permit document identifies Nizamabad Municipal Corporation as the issuing authority.
Principal building approval: Building Permit Order 0037/NIZA/SWBP/2026, approved 17/01/2026; file no. 011293/NIZA/00083/SWBP/2025.
Approved built-up area: 6294.7 Sq. Mtrs.
Building count / configuration: 1 building, named APARTMENT; sanctioned as 1 Stilt + 5 Floors, with stated building height 14.7 m. Basement, podium and separate parking-level details are not stated in the supplied extraction.
Parking: Sanctioned Total Parking Area 1294.07 Sq. Mtrs; the permit says cellar and stilt areas approved for parking are to be used exclusively for parking. A space count is not supplied.
Unit count: 50 units in the sanctioned plan and 50 RERA-filed units.
Offering and status
RERA-filed configurations: 2BHK: 35 units, saleable area 144.89 sq. m each; 3BHK: 15 units, saleable area 161.37 sq. m each.
Booked / available: Portal-derived counts show 0 booked / 50 available (35 2BHK and 15 3BHK). The portal record has no as-of date, so these counts are indicative, not a current reservation confirmation.
Completion deadline: 17/01/2029, stated in the RERA filing and building permit. No original/revised date history is supplied.
Construction stage: No independently verified site-progress report or construction-stage percentage is supplied. The amenity record shows 0% progress for listed items; this does not establish the overall construction percentage.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records. The permit requires an occupancy certificate before occupation.
2. The project story
AYYAPPA BRINDAVAN is registered as a residential apartment project in Kanteshwar, Nizamabad, on Survey No. 77. The registered site is recorded as 2744.93 sq. m and is described in the land schedule as adjoining an 80 feet Wide Road on the south.
The approved proposal is a single apartment building, 1 Stilt + 5 Floors, for 50 dwelling units. The RERA filing lists 35 two-bedroom and 15 three-bedroom homes. The supplied records establish the approved proposal and RERA registration, but do not provide independently verified construction progress, a site-completion status, or an occupancy certificate.
3. Master plan, architecture & building design
The building permit records a 2744.93 Sq. Mtrs plot area and net plot area, 6294.7 Sq. Mtrs of residential upper-floor built-up area, one building, a height of 14.7 m, and 1 Stilt + 5 Floors. It also records Total Parking Area 1294.07 Sq. Mtrs. These are approval-record figures; no separate FSI-counted area, gross built-up area, building footprint, floor-by-floor unit arrangement, or tower-height breakdown is supplied.
The permit lists setbacks of Front 5.08 m, Rear 6.0 m, Side I 6.0 m and Side II 6.0 m. It records a Tot Lot of 145.78 Sq. Mtrs, 1 rainwater-harvesting pit and 130 trees. The supplied material does not provide enough drawing-derived detail to describe lifts, stairs, flat distribution by floor, internal circulation, or other open-space layout.
4. Homes, configurations & floor plans
The RERA filing lists 50 homes in two configurations. Saleable areas below are RERA-filed figures. No measured carpet-area values are available: the supplied drawing review reports one drawing, but it failed measurement.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 35 | 0 | 35 | 144.89 sq. m | Not measured | Not supplied |
| 3BHK | 15 | 0 | 15 | 161.37 sq. m | Not measured | Not supplied |
The filing labels the areas as saleable area; it does not provide carpet-area measurements or a loading figure. Drawing-based carpet area is a software measurement rather than a RERA disclosure, and no successful measurement is available for this project. Booked/available counts are portal-derived and undated, so they should be confirmed against current inventory before purchase.
5. Parking & vehicle circulation
The building permit records Total Parking Area 1294.07 Sq. Mtrs and requires approved cellar and stilt parking areas to be used exclusively for vehicle parking, without partitions or conversion to another use. The permit’s extracted floor description identifies 1 Stilt + 5 Floors, but the supplied record does not give a car or two-wheeler space count, visitor or accessible-space allocation, ramp arrangement, or unit-specific parking allocation.
No exclusive parking ownership or allocation to an individual apartment is established by the supplied overview records. The sanctioned parking area should not be read as a count of spaces or as proof of a particular unit’s parking rights.
6. Amenities, recreation & open spaces
The following facilities appear in the RERA amenity record. Its entries marked “YES” are recorded as provisions; the progress field is 0% for each listed item. The permit separately specifies certain site provisions. Neither record establishes that a facility has been completed or independently inspected.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or detail supplied | RERA amenity record | 0%; completion not verified |
| Internal roads and footpaths | No dimensions supplied | RERA amenity record | 0%; completion not verified |
| Street lighting | No detail supplied | RERA amenity record | 0%; completion not verified |
| Water supply | Listed as “YES”; system details not supplied | RERA amenity record | 0%; completion not verified |
| Sewerage | Listed as “YES” for chamber, lines, septic tank/STP; facility-specific details not supplied | RERA amenity record | 0%; completion not verified |
| Treatment and disposal of sewage and sullage water | Listed as “YES”; no treatment capacity supplied | RERA amenity record | 0%; completion not verified |
| Storm-water drains | Listed as “YES”; no dimensions supplied | RERA amenity record | 0%; completion not verified |
| Green strip / Tot Lot / Park | Listed as “YES”; permit records a Tot Lot of 145.78 Sq. Mtrs | RERA amenity record; building permit | RERA progress 0%; completion not verified |
| Aggregate recreational open space | No area supplied | RERA amenity record | 0%; completion not verified |
| Solid-waste management and disposal | Listed as “YES”; no system details supplied | RERA amenity record | 0%; completion not verified |
| Water conservation / rainwater harvesting | Listed as “YES”; permit records 1 rainwater-harvesting pit | RERA amenity record; building permit | RERA progress 0%; completion not verified |
| Energy management | No detail supplied | RERA amenity record | 0%; completion not verified |
| Fire protection and fire-safety requirements | Listed as “YES”; permit specifies fire-safety conditions | RERA amenity record; building permit | RERA progress 0%; completion not verified |
| Electrical meter room / sub-station / receiving station | Listed as “YES”; equipment details not supplied | RERA amenity record | 0%; completion not verified |
| Trees | Permit records 130 trees and requires planting/greenery provisions | Building permit | Completion not verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, sewage and sullage treatment/disposal, storm-water drains, solid-waste management, rainwater harvesting, fire protection and an electrical meter room/sub-station/receiving station. It does not provide system capacities, design specifications, or independent completion evidence.
The building permit requires a rainwater-harvesting structure, a transformer space, a garbage house, a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, fire extinguishers, manually operated alarm systems, hose reels and down corners. It specifies separate underground and terrace water-storage tanks of 25,000 L each for residential buildings, and requires an automatic sprinkler system if basement area exceeds 200 Sq. Mtrs. These are permit conditions, not confirmation that the systems have been installed or commissioned.
The permit also requires one entry and one exit, each with minimum width 4.5 mts and height clearance 5 mts, and fire-resistant swing doors for collapsible lifts on all floors. It assigns responsibility for fire and structural safety and requires an occupancy certificate before occupation. The supplied records do not state lift number or capacity, accessibility provisions, or completed fire-safety inspection status.
8. Location, access & connectivity
The registered location is NEAR RYTHU BAZAR, Kanteshwar, Nizamabad East (New), Nizamabad, Telangana, 503002. The project’s southern boundary is recorded as an 80 feet Wide Road; the building-permit description places the site at Janmabhoomi Road, Nizamabad.
The supplied connectivity record lists the nearest sampled Outer Ring Road interchange at approximately 124.5 km. No other measured distances, public-transport information, or project-specific approach-route details are supplied.
9. Developer & development status
The RERA-registered promoter is HARINDA CONSTRUCTIONS, filed as a Proprietorship. The named authorized signatory is KATIKANENI RAHUL KUMAR. The supplied records do not disclose a verified corporate registration identifier, official project website, or project contact details.
The promoter’s Form B declaration, dated August 2026, states a completion undertaking of 17th January 2029, refers to Development Agreement-cum-General Power of Attorney No. 6475/2025, and declares the land free from encumbrances. These are promoter declarations in the filed affidavit. The project is registered through 17/01/2029; that registration-validity period is distinct from the stated completion deadline. No verified construction-progress percentage or occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Certificate FORM ‘C’, project no. P03100011317, issued 16/10/2026; validity 17/01/2026–17/01/2029.
Building permit: Nizamabad Municipal Corporation Building Permit Order 0037/NIZA/SWBP/2026, approved 17/01/2026; file no. 011293/NIZA/00083/SWBP/2025. Sanctions one apartment building, 1 Stilt + 5 Floors, and 50 units.
RERA authority field: TG-RERA filing lists DTCP as Authority Name and plan approval no. 0037/NIZA/SWBP/2026.
Commencement / occupancy status: The supplied approval document is a building permit order. No separate occupancy/completion certificate is included; the permit requires an occupancy certificate before occupation.
Municipal mortgage deed: Mortgage Deed 204-2026, dated 09/01/2026, records 634.71 Sq. Mtrs of first-floor built-up area in favour of the Commissioner, Nizamabad Municipal Corporation.
Development agreement: Registered Development Agreement-cum-GPA 6475/2025, dated 30 July 2025, is identified in the project records as the promoter’s development-rights instrument.
RERA filing declaration: Form B affidavit by authorized signatory KATIKANENI RAHUL KUMAR, dated August 2026.
The supplied index does not include a separate approved-layout document, a complete set of building drawings, or an occupancy/completion certificate. The building-permit order contains additional construction, service and safety conditions; this overview summarizes relevant recorded provisions rather than reproducing the full conditions.
Frequently asked questions
Is AYYAPPA BRINDAVAN registered with Telangana RERA?
Yes. AYYAPPA BRINDAVAN is registered with the Telangana Real Estate Regulatory Authority as P03100011317; the registration status is New Project.
Who is the developer of AYYAPPA BRINDAVAN?
The promoter named in the RERA registration is HARINDA CONSTRUCTIONS.
Where is AYYAPPA BRINDAVAN located?
AYYAPPA BRINDAVAN is in NEAR RYTHU BAZAR, KANTESHWAR, NIZAMABAD EAST (NEW), Nizamabad, Telangana (503002).
When will AYYAPPA BRINDAVAN be completed?
The promoter's proposed date of completion filed with RERA is 17/01/2029. This is the promoter's declaration, not a guarantee.