Seshadri Nilayam
SANSKRUTI VENTURES · Rangareddy · RERA P02400011385
SESHADRI NILAYAM is a residential apartment project at Lingogiguda, Saroornagar Mandal, Ranga Reddy District, developed by registered promoter SANSKRUTI VENTURES. The project covers 548.5 sq. m. and comprises one residential building, BUILDING-1, approved as 1 Stilt + 5 Floors, with 15 2BHK units. It is registered with TG-RERA under P02400011385, and the promoter’s stated completion date is 14/11/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SESHADRI NILAYAM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase is not separately identified in the supplied record; the registration is for this project. RERA record |
| TG-RERA registration | P02400011385 RERA record |
| Registration validity | 15/11/2025–14/11/2028; the certificate records a period of 2 Years, 11 Months, 30 Day. This is registration validity, not evidence that construction is complete. RERA record |
| Registered promoter | SANSKRUTI VENTURES, a partnership RERA record RERA filing |
| RERA status | Registered; certificate issued 06/11/2026. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Lingogiguda / Lingojiguda; the RERA filing also identifies the locality as SAROORNAGAR MANDAL. RERA filing |
| Revenue village | Lingogiguda (also rendered Lingojiguda in filed records) RERA record |
| Mandal / district / PIN | Saroornagar / Ranga Reddy / 500035 RERA record |
| Project survey number(s) | Survey No. 67; no project subdivision is specified in the supplied project identity. RERA record |
| Site extent | 548.5 sq. m.; filed as both plot area and net plot area, with road-affected area and NALA-affected area recorded as 0. RERA filing |
| Boundaries | East: 9 M WIDE MAIN ROAD; North: 9M WIDE MAIN ROAD; West: PLOT NO 7; South: PLOT NO 13. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Building permit / principal approval | 1810/GHMC/SWBP/LBN2/2025, dated 15/11/2025 |
| Related file number | 008616/GHMC/04005/SWBP/LBN2/2025 |
| Approved built-up area | 1375.35 sq. m., recorded under Residential. |
| Building count and configuration | One residential building, BUILDING-1, approved as 1 Stilt + 5 Floors; sanctioned height 14.75 m. |
| Approved versus RERA-declared homes | GHMC permit: 5 dwelling units; TG-RERA filing: 15 units. RERA unit table |
| Parking provision in permit | Total Parking Area: 275.07 sq. m.; the supplied permit extract does not state a parking-space count. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 15 units; filed saleable area 115.94 sq. m. per unit. RERA unit table |
| Booked / available | 0 booked / 15 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table |
| Construction stage | A registration completion undertaking is recorded, but no construction-progress figure or independent site-progress verification is supplied. RERA amenities |
| Completion deadline | Promoter’s Form B states 14/11/2028; the building permit requires completion before 15/11/2028. |
| Original / revised deadline | No separate original-versus-revised completion history is supplied. |
| Occupancy / completion certificate | No OC or completion certificate is recorded in the supplied documents. The building permit says an OC is compulsory before occupation. |
2. The project story
SESHADRI NILAYAM is registered with TG-RERA as a residential apartment project at Lingogiguda/Lingojiguda, Saroornagar Mandal, Ranga Reddy District, on Survey No. 67. The RERA-filed site extent is 548.5 sq. m.; the GHMC permit describes the same plot area and permits a single residential building. RERA record
The GHMC permit describes BUILDING-1 as 1 Stilt + 5 Floors and sanctions five dwelling units. TG-RERA’s filed offering lists fifteen 2BHK units, with 0 booked and 15 available in the portal data supplied; those booking counts lack an as-of date. The evidence does not establish the current construction stage or independently verified completion. RERA unit table
The promoter’s Form B gives a completion undertaking of 14/11/2028. The permit separately requires completion before 15/11/2028. No occupancy certificate is included, and the permit states that an OC is required before occupation.
3. Master plan, architecture & building design
The GHMC building permit records a 548.5 sq. m. plot area and net plot area, 0 road-affected area, 0 NALA-affected area, and 1375.35 sq. m. of residential built-up area. It also records total parking area of 275.07 sq. m. and a total-lot area of 0 sq. m.
The permit sanctions one building, BUILDING-1, with 1 Stilt + 5 Floors and a height of 14.75 m. The supplied evidence does not provide a verified building-footprint measurement, floor-by-floor flat arrangement, lift or stair details, or an internal circulation plan.
The permit records front, rear and side setbacks of 3.0 m, 3.5 m, 3.5 m and 3.5 m respectively. It identifies the site as residential, with commercial and “Others” areas recorded as 0.0. No separate layout or phase-organization details are supplied.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 115.94 sq. m. | 85.0–94.7 sq. m.; median 89.9 sq. m. | 22% |
RERA-filed figures identify 15 2BHK units and a saleable area of 115.94 sq. m. per unit. Booked and available counts are portal figures without a supplied as-of date. RERA unit table
The carpet-area range and 22% loading are software measurements from approved floor-plan drawing geometry, not RERA disclosures; two flat designs were measured, and the results are marked as needing review. The drawing extract identifies a 2nd Floor Plan flat (203) and labels bedrooms, kitchen/hall, toilets and a puja area; complete room dimensions are not supplied. Verify measured areas against the drawing. Carpet area, saleable area and the common-area component should not be treated as interchangeable. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records 275.07 sq. m. as total parking area and identifies the building as having one stilt level. It does not give a count of parking spaces or establish resident, visitor, accessible or two-wheeler allocations.
The permit’s mortgage schedule records 141.11 sq. m. of mortgaged built-up area, described as the 2nd floor; the permit states that the mortgaged built-up area may be registered only after an occupancy certificate is produced. The supplied documents do not establish individual parking allotments, ramps, vehicle entry/exit arrangements, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The GHMC permit lists site requirements or provisions including a rainwater-harvesting pit, 20 trees, transformer space and a garbage house. These are permit-recorded provisions, not evidence that they have been completed. The TG-RERA amenities data records the listed items below at 0% progress where a percentage is shown; no independent completion verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Rainwater harvesting | 1 rainwater-harvesting pit; permit also requires a percolation pit. | Permit-recorded; completion not verified. | |
| Trees | 20 trees | Permit-recorded; completion not verified. | |
| Green strip / TOT LOT / park | No size supplied. | RERA amenities | RERA amenities record: 0%; completion not verified. |
| Community buildings | No description or size supplied. | RERA amenities | RERA amenities record: 0%; completion not verified. |
| Internal roads and footpaths | No dimensions supplied. | RERA amenities | RERA amenities record: 0%; completion not verified. |
No clubhouse, indoor recreation, sports facility or other convenience/community facility is detailed in the supplied evidence.
7. Utilities, building services & safety
| Evidence in the project record | Water Supply is marked “YES” in the RERA amenities record. |
|---|---|
| Status / limitation | No source, storage, treatment capacity or completion evidence supplied. RERA amenities |
| Evidence in the project record | Sewerage (chamber, lines, septic tank, STP) and storm-water drains are marked “YES”; treatment and disposal of sewage and sullage water is listed separately. |
|---|---|
| Status / limitation | No system design, capacity or completion evidence supplied. RERA amenities |
| Evidence in the project record | Permit provides for one rainwater-harvesting pit and requires a percolation pit. |
|---|---|
| Status / limitation | Permit requirement; completion not verified. |
| Evidence in the project record | Electrical meter room/sub-station/receiving station is marked “YES”; the permit requires transformer space. |
|---|---|
| Status / limitation | No capacity or installed/completed status supplied. RERA amenities |
| Evidence in the project record | Fire protection and fire-safety requirements are listed in the RERA amenities record. The permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the OC. |
|---|---|
| Status / limitation | No Fire NOC or completed fire-system evidence supplied. RERA amenities |
| Evidence in the project record | Solid-waste management and disposal are listed; the permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | No operational details or completion evidence supplied. RERA amenities |
| Evidence in the project record | Not detailed in the supplied project data. |
|---|---|
| Status / limitation | Unverified / not disclosed. |
8. Location, access & connectivity
The registered location is Lingogiguda/Lingojiguda, Saroornagar Mandal, Ranga Reddy District, Telangana, PIN 500035. The project boundaries identify 9 M WIDE MAIN ROAD to the east and 9M WIDE MAIN ROAD to the north. The permit separately records road width(s) of 18 mt. RERA record RERA filing
The supplied location record gives an approximate distance of 11.2 km to the nearest sampled Outer Ring Road interchange. No public-transport details or other measured landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is SANSKRUTI VENTURES, recorded as a partnership, with GSTIN 36AFOFS0398Q1ZX. The RERA certificate lists the promoter office as Village: Peerjadiguda, Mandal: Medipally, District: Medchal-Malkajgiri, PIN: 500098. No official website or contact details are supplied here. RERA record RERA filing Corporate record
In Form B, the promoter declares a completion date of 14/11/2028 and undertakes to deposit 70% of amounts realised from allottees in a separate account, subject to the stated withdrawal and audit conditions. The RERA registration certificate records the registration period through 14/11/2028. Neither the declaration nor registration validity establishes actual construction progress; no progress percentage or independent site verification is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400011385; valid 15/11/2025–14/11/2028; certificate issued 06/11/2026 |
|---|---|
| What it establishes | Registration of SESHADRI NILAYAM with stated registration conditions. |
| Identifier / date | 1810/GHMC/SWBP/LBN2/2025; 15/11/2025 |
|---|---|
| What it establishes | Permit for BUILDING-1, 1 Stilt + 5 Floors, on Survey No. 67. |
| Identifier / date | 008616/GHMC/04005/SWBP/LBN2/2025 |
|---|---|
| What it establishes | File number shown in the permit. |
| Identifier / date | Dated 9 MAR 2026 |
|---|---|
| What it establishes | Promoter’s declaration, including the completion undertaking and separate-account commitments. |
| Identifier / date | Document 692521 |
|---|---|
| What it establishes | Drawing source used for software-measured unit-area information; measurements need review. |
| Identifier / date | Not present in supplied documents |
|---|---|
| What it establishes | OC status is not established by the available record. Document index |
1. Project at a glance
Project identity
Registered project name: SESHADRI NILAYAM
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified in the supplied record; the registration is for this project.
TG-RERA registration: P02400011385
Registration validity: 15/11/2025–14/11/2028; the certificate records a period of 2 Years, 11 Months, 30 Day. This is registration validity, not evidence that construction is complete.
Registered promoter: SANSKRUTI VENTURES, a partnership
RERA status: Registered; certificate issued 06/11/2026.
Land and geographic identity
Locality: Lingogiguda / Lingojiguda; the RERA filing also identifies the locality as SAROORNAGAR MANDAL.
Revenue village: Lingogiguda (also rendered Lingojiguda in filed records)
Mandal / district / PIN: Saroornagar / Ranga Reddy / 500035
Project survey number(s): Survey No. 67; no project subdivision is specified in the supplied project identity.
Site extent: 548.5 sq. m.; filed as both plot area and net plot area, with road-affected area and NALA-affected area recorded as 0.
Boundaries: East: 9 M WIDE MAIN ROAD; North: 9M WIDE MAIN ROAD; West: PLOT NO 7; South: PLOT NO 13.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Building permit / principal approval: 1810/GHMC/SWBP/LBN2/2025, dated 15/11/2025
Related file number: 008616/GHMC/04005/SWBP/LBN2/2025
Approved built-up area: 1375.35 sq. m., recorded under Residential.
Building count and configuration: One residential building, BUILDING-1, approved as 1 Stilt + 5 Floors; sanctioned height 14.75 m.
Approved versus RERA-declared homes: GHMC permit: 5 dwelling units; TG-RERA filing: 15 units.
Parking provision in permit: Total Parking Area: 275.07 sq. m.; the supplied permit extract does not state a parking-space count.
Offering and status
RERA-filed configuration: 2BHK, 15 units; filed saleable area 115.94 sq. m. per unit.
Booked / available: 0 booked / 15 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative.
Construction stage: A registration completion undertaking is recorded, but no construction-progress figure or independent site-progress verification is supplied.
Completion deadline: Promoter’s Form B states 14/11/2028; the building permit requires completion before 15/11/2028.
Original / revised deadline: No separate original-versus-revised completion history is supplied.
Occupancy / completion certificate: No OC or completion certificate is recorded in the supplied documents. The building permit says an OC is compulsory before occupation.
2. The project story
SESHADRI NILAYAM is registered with TG-RERA as a residential apartment project at Lingogiguda/Lingojiguda, Saroornagar Mandal, Ranga Reddy District, on Survey No. 67. The RERA-filed site extent is 548.5 sq. m.; the GHMC permit describes the same plot area and permits a single residential building.
The GHMC permit describes BUILDING-1 as 1 Stilt + 5 Floors and sanctions five dwelling units. TG-RERA’s filed offering lists fifteen 2BHK units, with 0 booked and 15 available in the portal data supplied; those booking counts lack an as-of date. The evidence does not establish the current construction stage or independently verified completion.
The promoter’s Form B gives a completion undertaking of 14/11/2028. The permit separately requires completion before 15/11/2028. No occupancy certificate is included, and the permit states that an OC is required before occupation.
3. Master plan, architecture & building design
The GHMC building permit records a 548.5 sq. m. plot area and net plot area, 0 road-affected area, 0 NALA-affected area, and 1375.35 sq. m. of residential built-up area. It also records total parking area of 275.07 sq. m. and a total-lot area of 0 sq. m.
The permit sanctions one building, BUILDING-1, with 1 Stilt + 5 Floors and a height of 14.75 m. The supplied evidence does not provide a verified building-footprint measurement, floor-by-floor flat arrangement, lift or stair details, or an internal circulation plan.
The permit records front, rear and side setbacks of 3.0 m, 3.5 m, 3.5 m and 3.5 m respectively. It identifies the site as residential, with commercial and “Others” areas recorded as 0.0. No separate layout or phase-organization details are supplied.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 115.94 sq. m. | 85.0–94.7 sq. m.; median 89.9 sq. m. | 22% |
RERA-filed figures identify 15 2BHK units and a saleable area of 115.94 sq. m. per unit. Booked and available counts are portal figures without a supplied as-of date.
The carpet-area range and 22% loading are software measurements from approved floor-plan drawing geometry, not RERA disclosures; two flat designs were measured, and the results are marked as needing review. The drawing extract identifies a 2nd Floor Plan flat (203) and labels bedrooms, kitchen/hall, toilets and a puja area; complete room dimensions are not supplied. Verify measured areas against the drawing. Carpet area, saleable area and the common-area component should not be treated as interchangeable.
5. Parking & vehicle circulation
The GHMC permit records 275.07 sq. m. as total parking area and identifies the building as having one stilt level. It does not give a count of parking spaces or establish resident, visitor, accessible or two-wheeler allocations.
The permit’s mortgage schedule records 141.11 sq. m. of mortgaged built-up area, described as the 2nd floor; the permit states that the mortgaged built-up area may be registered only after an occupancy certificate is produced. The supplied documents do not establish individual parking allotments, ramps, vehicle entry/exit arrangements, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The GHMC permit lists site requirements or provisions including a rainwater-harvesting pit, 20 trees, transformer space and a garbage house. These are permit-recorded provisions, not evidence that they have been completed. The TG-RERA amenities data records the listed items below at 0% progress where a percentage is shown; no independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Rainwater harvesting | 1 rainwater-harvesting pit; permit also requires a percolation pit. | Permit-recorded; completion not verified. | |
| Trees | 20 trees | Permit-recorded; completion not verified. | |
| Green strip / TOT LOT / park | No size supplied. | RERA amenities record: 0%; completion not verified. | |
| Community buildings | No description or size supplied. | RERA amenities record: 0%; completion not verified. | |
| Internal roads and footpaths | No dimensions supplied. | RERA amenities record: 0%; completion not verified. |
No clubhouse, indoor recreation, sports facility or other convenience/community facility is detailed in the supplied evidence.
7. Utilities, building services & safety
| Evidence in the project record | Water Supply is marked “YES” in the RERA amenities record. |
|---|---|
| Status / limitation | No source, storage, treatment capacity or completion evidence supplied. |
| Evidence in the project record | Sewerage (chamber, lines, septic tank, STP) and storm-water drains are marked “YES”; treatment and disposal of sewage and sullage water is listed separately. |
|---|---|
| Status / limitation | No system design, capacity or completion evidence supplied. |
| Evidence in the project record | Permit provides for one rainwater-harvesting pit and requires a percolation pit. |
|---|---|
| Status / limitation | Permit requirement; completion not verified. |
| Evidence in the project record | Electrical meter room/sub-station/receiving station is marked “YES”; the permit requires transformer space. |
|---|---|
| Status / limitation | No capacity or installed/completed status supplied. |
| Evidence in the project record | Fire protection and fire-safety requirements are listed in the RERA amenities record. The permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the OC. |
|---|---|
| Status / limitation | No Fire NOC or completed fire-system evidence supplied. |
| Evidence in the project record | Solid-waste management and disposal are listed; the permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | No operational details or completion evidence supplied. |
| Evidence in the project record | Not detailed in the supplied project data. |
|---|---|
| Status / limitation | Unverified / not disclosed. |
8. Location, access & connectivity
The registered location is Lingogiguda/Lingojiguda, Saroornagar Mandal, Ranga Reddy District, Telangana, PIN 500035. The project boundaries identify 9 M WIDE MAIN ROAD to the east and 9M WIDE MAIN ROAD to the north. The permit separately records road width(s) of 18 mt.
The supplied location record gives an approximate distance of 11.2 km to the nearest sampled Outer Ring Road interchange. No public-transport details or other measured landmark distances are supplied.
9. Developer & development status
The registered promoter is SANSKRUTI VENTURES, recorded as a partnership, with GSTIN 36AFOFS0398Q1ZX. The RERA certificate lists the promoter office as Village: Peerjadiguda, Mandal: Medipally, District: Medchal-Malkajgiri, PIN: 500098. No official website or contact details are supplied here.
In Form B, the promoter declares a completion date of 14/11/2028 and undertakes to deposit 70% of amounts realised from allottees in a separate account, subject to the stated withdrawal and audit conditions. The RERA registration certificate records the registration period through 14/11/2028. Neither the declaration nor registration validity establishes actual construction progress; no progress percentage or independent site verification is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400011385; valid 15/11/2025–14/11/2028; certificate issued 06/11/2026 |
|---|---|
| What it establishes | Registration of SESHADRI NILAYAM with stated registration conditions. |
| Identifier / date | 1810/GHMC/SWBP/LBN2/2025; 15/11/2025 |
|---|---|
| What it establishes | Permit for BUILDING-1, 1 Stilt + 5 Floors, on Survey No. 67. |
| Identifier / date | 008616/GHMC/04005/SWBP/LBN2/2025 |
|---|---|
| What it establishes | File number shown in the permit. |
| Identifier / date | Dated 9 MAR 2026 |
|---|---|
| What it establishes | Promoter’s declaration, including the completion undertaking and separate-account commitments. |
| Identifier / date | Document 692521 |
|---|---|
| What it establishes | Drawing source used for software-measured unit-area information; measurements need review. |
| Identifier / date | Not present in supplied documents |
|---|---|
| What it establishes | OC status is not established by the available record. |
Frequently asked questions
Is SESHADRI NILAYAM registered with Telangana RERA?
Yes. SESHADRI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02400011385; the registration status is New Project.
Who is the developer of SESHADRI NILAYAM?
The promoter named in the RERA registration is SANSKRUTI VENTURES.
Where is SESHADRI NILAYAM located?
SESHADRI NILAYAM is in SAROORNAGAR MANDAL, Lingogiguda, Saroornagar, Rangareddy, Telangana (500035).
When will SESHADRI NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 14/11/2028. This is the promoter's declaration, not a guarantee.