Kishan Enclave
AJMEERA KISHAN AND OTHERS · Mahabubabad · RERA P00700011268
KISHAN ENCLAVE is a plotted development in Dornakal Revenue Village, Dornakal Mandal, Mahabubabad District, developed by the registered promoter AJMEERA KISHAN AND OTHERS. The tentative layout approval states a land extent of 3 Acer 20.95 Gts 17056 Sq. Yds and provides for 52 residential plots; no tower, floor or home configuration is stated. The project is registered under TG-RERA number P00700011268, and the promoter’s Form B undertaking states a completion date of 18/06/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | KISHAN ENCLAVE RERA record |
| Project type | Plotted development; residential open layout RERA record |
| Phase / registered portion | Phase not separately identified; TG-RERA certificate identifies the project land as Sy. No. 60 PART |
| TG-RERA registration | P00700011268; valid 19/06/2025–18/06/2027. Registration validity is not the same as the completion deadline. Approvals record |
| Registered promoter | AJMEERA KISHAN AND OTHERS RERA record |
| RERA status in supplied record | Registered under section 5; certificate says registration has not been extended. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Dornakal; Dornakal Revenue Village RERA record Land records |
| Mandal / district / PIN | Dornakal Mandal; Mahabubabad District; 506381 RERA record |
| Project survey identity | TG-RERA certificate and tentative layout approval identify Sy. No. 60 PART. The filed layout sheet also names 60/1/1/1, 60/1/2, 60/1/1/2, 60/1/1/1/1, and 60/Part; its text describes the land as 60/1/1/1, 60/1/2 and 60/1/1/1/2, with the parenthetical NALA references 60/1/1/1/2, 60/1/1/1/1 and 60/1/2. |
| Extent | Tentative layout approval states 3 Acer 20.95 Gts 17056 Sq. Yds. The RERA land record gives 13,837.22 sq. m net area. The layout sheet states 14,260.32 sq. mt. total layout area and 13,837.22 sq. mt. net layout area. Land records |
| Boundaries | North: 12 19 MT WIDE EXISTING 18 28 MT WIDE PROPOSED ROAD; east: BUFFER IN SY NO 60 PART; west and south: OTHERS LAND IN SY NO 60 PART. Land records |
| PIN | 506381 RERA record |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Tentative layout approval issued by DORNAKAL Municipality/Municipal Corporation. The RERA filing also names DTCP for the layout plan. Approvals record |
| Principal approval | Tentative Layout Plan 0002/LO/3090/2025, approved 19 June, 2025; application 009662/LO/DTCP/3090/0003/2023. Approvals record |
| Layout area / approved built-up area | RERA land record reports total area 13,837.22 sq. m and approved built-up area 7,817.01 sq. m. For this plotted project, the supplied records do not define that built-up-area figure as a building program. Land records RERA filing |
| Plots | 52 plots in the tentative layout approval. |
| Buildings / floors / parking levels | No building, floor-configuration or parking-level schedule is supplied; this is a plotted layout. |
Offering and status
| Field | Record |
|---|---|
| Offering | Residential plots; the tentative layout provides 52 plots. Plot-by-plot dimensions and RERA unit inventory are not available in the supplied data. Layout record |
| Booked / available | Not disclosed in the supplied record. Document index |
| Construction / development stage | TG-RERA-filed amenity progress entries report progress for several infrastructure items; they are promoter-reported figures, not independent site verification. See Amenities, recreation & open spaces and Utilities, building services & safety. RERA amenities |
| Completion deadline | Promoter’s Form B undertaking states 18/06/2027. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied records. The principal approval is a tentative layout approval, not an OC. Document index |
2. The project story
KISHAN ENCLAVE is registered as a residential plotted development in Dornakal Revenue Village, Dornakal Mandal, Mahabubabad District. The supplied TG-RERA certificate registers land identified as Sy. No. 60 PART; the tentative layout approval also names Sy. No. 60 PART. The filed layout sheet includes the listed subdivisions and NALA references shown in the identity table.
The tentative layout plan provides for 52 plots, with internal roads and areas reserved for open space, social infrastructure and utilities. Its approval requires the applicant to complete infrastructure and amenities within two years of approval—stated as 19 June, 2027—and provides for eventual final layout release following the prescribed works and handover of reserved areas. This approval describes a tentative layout; it does not itself establish that development is complete or that a final layout has been released.
The RERA filing reports progress percentages for selected layout infrastructure, but these are filed progress figures rather than independent confirmation of site conditions. The supplied records do not include a verified construction-status inspection, plot-by-plot sales inventory, or a completion/occupancy certificate. RERA amenities Document index
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project in the supplied drawings. The layout sheet states total layout area of 14,260.32 sq. mt. and net layout area of 13,837.22 sq. mt. Its land-use schedule records:
| Layout use | Area (sq. m) | Share shown on layout sheet |
|---|---|---|
| Plotted area | 7,817.01 | 56.49% |
| Road area | 4,193.51 | 30.31% |
| Organized open space / park | 1,246.54 | 9.01% |
| Social infrastructure | 391.25 | 2.83% |
| Utility area | 138.89 | 1.00% |
| Buffer zone | 49.92 | 0.36% |
| Amenity area | 0.00 | 0.00% |
| Total net layout | 13,837.12 | 100.00% |
The layout sheet also labels Tot-lot, social-infrastructure/utility space and utility land. The tentative approval describes 52 plots and roads, and lists road widths including 18 mts and above; the layout sheet includes 12.19 MT, 18.29 MT, 9.14 mt., 9.14MT(30'-0") and 33 FEET 10.05MT.
No building footprints, floor plans, tower heights, or residential/commercial building distribution are supplied. The layout sheet’s land-use figures are drawing-derived and should be read as stated on that record; no plot-size schedule is available. Floor plans
4. Homes, configurations & floor plans
The offered product is plotted land, not apartments. The tentative layout approval records 52 plots; plot numbers printed on the drawing run from 1 to 52. The supplied record does not provide plot dimensions or size bands, nor booked and available counts. Layout record Document index
The layout drawing’s measured-plot data is incomplete: the supplied layout record says plot sizes were not measured and the plot schedule is not complete. A floor-plan record likewise reports one layout sheet and no measured homes; apartment carpet-area measurements are not applicable on the evidence supplied. Layout record Floor plans
5. Parking & vehicle circulation
The layout sheet reports 0.00 sq. m for common parking area. The supplied records do not establish a parking-space count, visitor or accessible parking provision, or parking allocation to individual plots. The tentative approval requires roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site; these are approval conditions, not confirmation of completed circulation works.
The approval also records a municipal mortgage over plots 17, 18, 19, 20, 38, 39, 40, 41, 42 and 43. This is a documentary status of those plots, not evidence of purchaser-specific parking rights.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,246.54 sq. m; approval states 9.01% | Layout sheet and tentative layout approval | RERA-filed progress for “Green Strip/TOT LOT/Park”: 40%; not independently verified RERA amenities |
| Tot-lot | Named on the layout sheet; no size stated | No separate progress figure supplied | |
| Social infrastructure area | 391.25 sq. m; approval states 2.83% | No facility-level completion evidence supplied | |
| Utility area | 138.89 sq. m; approval states 1% | No facility-level completion evidence supplied | |
| Community buildings | No building or size identified | RERA-filed amenity schedule RERA amenities | 0% reported |
| Amenity area | 0.00 sq. m on layout schedule | No separate facility completion evidence supplied |
The tentative approval requires handover by registered gift deed of the open-space, utility and road areas to the Municipality before release of the final layout, and lists park development and avenue plantation among the required works. The supplied material does not independently verify delivery or handover of these facilities.
7. Utilities, building services & safety
The tentative layout approval lists the following required or proposed infrastructure: water reservoir, overhead tank, internal water-supply pipelines and an assured water-supply source; septic tank / common septic tank or STP, underground drainage lines and storm-water drains; electric transformer and street lights; solid-waste management; rainwater-harvesting pits; and avenue plantation. The approval states that utility land is to include facilities such as water reservoir, septic tank/STP, electric transformer and solid-waste management. These are approval-listed works, not confirmation that each facility is complete or operating.
The RERA-filed amenity schedule reports progress of 55% for water supply, 80% for sewerage (chamber, lines, septic tank, STP), 50% for storm-water drains, 45% for street lighting, 30% for water conservation/rainwater harvesting, and 40% for electrical meter room/sub-station/receiving station. It reports 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection and fire-safety requirements. These figures are filed progress entries, not independent verification; the supplied records give no capacities, completion certificates or operating status. RERA amenities
8. Location, access & connectivity
The registered location is Dornakal Revenue Village, Dornakal Mandal, Mahabubabad District, Telangana, PIN 506381. The supplied geocode identifies Dornakal at 17.4419208, 80.1516156. RERA record Location record
The tentative layout approval identifies existing and proposed roads along the north boundary and requires roads to remain open for access to neighbouring sites. A supplied connectivity record gives the nearest sampled Outer Ring Road interchange as approximately 156.1 km; no other measured distances, public-transport details or landmark distances are supplied. Land records Location record
9. Developer & development status
The registered promoter is AJMEERA KISHAN AND OTHERS, whose entity type is recorded as “Others.” The supplied records do not identify a corporate registration number, registered office for the promoter, or official contact details sufficient to further identify a legal entity. The RERA certificate separately gives the promoter office as Village: Papatapalle, Mandal: Raghunadhapalem, District: Khammam, PIN 507003. RERA record Corporate record
A May 2026 MOU among Ajmeera Kishan, Sharadha Bhukya and Bhukya Harya concerns joint development of Sy. No. 60 Part as KISHAN ENCLAVE and allocates plot shares among the parties. It is an MOU and is not itself a registered conveyance of title.
The promoter’s Form B declares completion by 18/06/2027. Separately, the tentative layout approval sets infrastructure and amenity completion within two years of approval, stating 19 June, 2027. The supplied record contains no verified site inspection or occupancy/completion certificate. Document index
10. Approvals, official records & documents
| Identifier / date | P00700011268; valid 19/06/2025–18/06/2027 |
|---|---|
| What the supplied record establishes | Registration for KISHAN ENCLAVE, identifying Sy. No. 60 PART and promoter AJMEERA KISHAN AND OTHERS. |
| Identifier / date | 0002/LO/3090/2025, 19 June, 2025; application 009662/LO/DTCP/3090/0003/2023 |
|---|---|
| What the supplied record establishes | Municipality/Municipal Corporation approval for a tentative 52-plot layout in Sy. No. 60 PART, with infrastructure and land-handover conditions. |
| Identifier / date | File TS/026446/2024, 23-05-2024; LTP licence CA/2017/87850 |
|---|---|
| What the supplied record establishes | Layout drawing and land-use schedule; its extracted text describes the proposed layout and subdivision references. |
| Identifier / date | 2676/2025, 04 March, 2025 |
|---|---|
| What the supplied record establishes | Approval record identifies plots 17, 18, 19, 20, 38, 39, 40, 41, 42 and 43 as mortgaged to the Municipality/Municipal Corporation. |
| Identifier / date | Completion undertaking 18/06/2027 |
|---|---|
| What the supplied record establishes | Promoter’s declaration concerning completion and project obligations. |
| Identifier / date | Made May 2026 |
|---|---|
| What the supplied record establishes | Joint-development and plot-share arrangements described by the parties. |
The supplied records do not include an occupancy or completion certificate, a final layout release, or a complete plot-dimension and sales-inventory schedule. Document index
1. Project at a glance
Project identity
Registered project name: KISHAN ENCLAVE
Project type: Plotted development; residential open layout
Phase / registered portion: Phase not separately identified; TG-RERA certificate identifies the project land as Sy. No. 60 PART
TG-RERA registration: P00700011268; valid 19/06/2025–18/06/2027. Registration validity is not the same as the completion deadline.
Registered promoter: AJMEERA KISHAN AND OTHERS
RERA status in supplied record: Registered under section 5; certificate says registration has not been extended.
Land and geographic identity
Locality / revenue village: Dornakal; Dornakal Revenue Village
Mandal / district / PIN: Dornakal Mandal; Mahabubabad District; 506381
Project survey identity: TG-RERA certificate and tentative layout approval identify Sy. No. 60 PART. The filed layout sheet also names 60/1/1/1, 60/1/2, 60/1/1/2, 60/1/1/1/1, and 60/Part; its text describes the land as 60/1/1/1, 60/1/2 and 60/1/1/1/2, with the parenthetical NALA references 60/1/1/1/2, 60/1/1/1/1 and 60/1/2.
Extent: Tentative layout approval states 3 Acer 20.95 Gts 17056 Sq. Yds. The RERA land record gives 13,837.22 sq. m net area. The layout sheet states 14,260.32 sq. mt. total layout area and 13,837.22 sq. mt. net layout area.
Boundaries: North: 12 19 MT WIDE EXISTING 18 28 MT WIDE PROPOSED ROAD; east: BUFFER IN SY NO 60 PART; west and south: OTHERS LAND IN SY NO 60 PART.
PIN: 506381
Development identity
Sanctioning authority: Tentative layout approval issued by DORNAKAL Municipality/Municipal Corporation. The RERA filing also names DTCP for the layout plan.
Principal approval: Tentative Layout Plan 0002/LO/3090/2025, approved 19 June, 2025; application 009662/LO/DTCP/3090/0003/2023.
Layout area / approved built-up area: RERA land record reports total area 13,837.22 sq. m and approved built-up area 7,817.01 sq. m. For this plotted project, the supplied records do not define that built-up-area figure as a building program.
Plots: 52 plots in the tentative layout approval.
Buildings / floors / parking levels: No building, floor-configuration or parking-level schedule is supplied; this is a plotted layout.
Offering and status
Offering: Residential plots; the tentative layout provides 52 plots. Plot-by-plot dimensions and RERA unit inventory are not available in the supplied data.
Booked / available: Not disclosed in the supplied record.
Construction / development stage: TG-RERA-filed amenity progress entries report progress for several infrastructure items; they are promoter-reported figures, not independent site verification. See Amenities, recreation & open spaces and Utilities, building services & safety.
Completion deadline: Promoter’s Form B undertaking states 18/06/2027.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied records. The principal approval is a tentative layout approval, not an OC.
2. The project story
KISHAN ENCLAVE is registered as a residential plotted development in Dornakal Revenue Village, Dornakal Mandal, Mahabubabad District. The supplied TG-RERA certificate registers land identified as Sy. No. 60 PART; the tentative layout approval also names Sy. No. 60 PART. The filed layout sheet includes the listed subdivisions and NALA references shown in the identity table.
The tentative layout plan provides for 52 plots, with internal roads and areas reserved for open space, social infrastructure and utilities. Its approval requires the applicant to complete infrastructure and amenities within two years of approval—stated as 19 June, 2027—and provides for eventual final layout release following the prescribed works and handover of reserved areas. This approval describes a tentative layout; it does not itself establish that development is complete or that a final layout has been released.
The RERA filing reports progress percentages for selected layout infrastructure, but these are filed progress figures rather than independent confirmation of site conditions. The supplied records do not include a verified construction-status inspection, plot-by-plot sales inventory, or a completion/occupancy certificate.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project in the supplied drawings. The layout sheet states total layout area of 14,260.32 sq. mt. and net layout area of 13,837.22 sq. mt. Its land-use schedule records:
| Layout use | Area (sq. m) | Share shown on layout sheet |
|---|---|---|
| Plotted area | 7,817.01 | 56.49% |
| Road area | 4,193.51 | 30.31% |
| Organized open space / park | 1,246.54 | 9.01% |
| Social infrastructure | 391.25 | 2.83% |
| Utility area | 138.89 | 1.00% |
| Buffer zone | 49.92 | 0.36% |
| Amenity area | 0.00 | 0.00% |
| Total net layout | 13,837.12 | 100.00% |
The layout sheet also labels Tot-lot, social-infrastructure/utility space and utility land. The tentative approval describes 52 plots and roads, and lists road widths including 18 mts and above; the layout sheet includes 12.19 MT, 18.29 MT, 9.14 mt., 9.14MT(30'-0") and 33 FEET 10.05MT.
No building footprints, floor plans, tower heights, or residential/commercial building distribution are supplied. The layout sheet’s land-use figures are drawing-derived and should be read as stated on that record; no plot-size schedule is available.
4. Homes, configurations & floor plans
The offered product is plotted land, not apartments. The tentative layout approval records 52 plots; plot numbers printed on the drawing run from 1 to 52. The supplied record does not provide plot dimensions or size bands, nor booked and available counts.
The layout drawing’s measured-plot data is incomplete: the supplied layout record says plot sizes were not measured and the plot schedule is not complete. A floor-plan record likewise reports one layout sheet and no measured homes; apartment carpet-area measurements are not applicable on the evidence supplied.
5. Parking & vehicle circulation
The layout sheet reports 0.00 sq. m for common parking area. The supplied records do not establish a parking-space count, visitor or accessible parking provision, or parking allocation to individual plots. The tentative approval requires roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site; these are approval conditions, not confirmation of completed circulation works.
The approval also records a municipal mortgage over plots 17, 18, 19, 20, 38, 39, 40, 41, 42 and 43. This is a documentary status of those plots, not evidence of purchaser-specific parking rights.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,246.54 sq. m; approval states 9.01% | Layout sheet and tentative layout approval | RERA-filed progress for “Green Strip/TOT LOT/Park”: 40%; not independently verified |
| Tot-lot | Named on the layout sheet; no size stated | No separate progress figure supplied | |
| Social infrastructure area | 391.25 sq. m; approval states 2.83% | No facility-level completion evidence supplied | |
| Utility area | 138.89 sq. m; approval states 1% | No facility-level completion evidence supplied | |
| Community buildings | No building or size identified | RERA-filed amenity schedule | 0% reported |
| Amenity area | 0.00 sq. m on layout schedule | No separate facility completion evidence supplied |
The tentative approval requires handover by registered gift deed of the open-space, utility and road areas to the Municipality before release of the final layout, and lists park development and avenue plantation among the required works. The supplied material does not independently verify delivery or handover of these facilities.
7. Utilities, building services & safety
The tentative layout approval lists the following required or proposed infrastructure: water reservoir, overhead tank, internal water-supply pipelines and an assured water-supply source; septic tank / common septic tank or STP, underground drainage lines and storm-water drains; electric transformer and street lights; solid-waste management; rainwater-harvesting pits; and avenue plantation. The approval states that utility land is to include facilities such as water reservoir, septic tank/STP, electric transformer and solid-waste management. These are approval-listed works, not confirmation that each facility is complete or operating.
The RERA-filed amenity schedule reports progress of 55% for water supply, 80% for sewerage (chamber, lines, septic tank, STP), 50% for storm-water drains, 45% for street lighting, 30% for water conservation/rainwater harvesting, and 40% for electrical meter room/sub-station/receiving station. It reports 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection and fire-safety requirements. These figures are filed progress entries, not independent verification; the supplied records give no capacities, completion certificates or operating status.
8. Location, access & connectivity
The registered location is Dornakal Revenue Village, Dornakal Mandal, Mahabubabad District, Telangana, PIN 506381. The supplied geocode identifies Dornakal at 17.4419208, 80.1516156.
The tentative layout approval identifies existing and proposed roads along the north boundary and requires roads to remain open for access to neighbouring sites. A supplied connectivity record gives the nearest sampled Outer Ring Road interchange as approximately 156.1 km; no other measured distances, public-transport details or landmark distances are supplied.
9. Developer & development status
The registered promoter is AJMEERA KISHAN AND OTHERS, whose entity type is recorded as “Others.” The supplied records do not identify a corporate registration number, registered office for the promoter, or official contact details sufficient to further identify a legal entity. The RERA certificate separately gives the promoter office as Village: Papatapalle, Mandal: Raghunadhapalem, District: Khammam, PIN 507003.
A May 2026 MOU among Ajmeera Kishan, Sharadha Bhukya and Bhukya Harya concerns joint development of Sy. No. 60 Part as KISHAN ENCLAVE and allocates plot shares among the parties. It is an MOU and is not itself a registered conveyance of title.
The promoter’s Form B declares completion by 18/06/2027. Separately, the tentative layout approval sets infrastructure and amenity completion within two years of approval, stating 19 June, 2027. The supplied record contains no verified site inspection or occupancy/completion certificate.
10. Approvals, official records & documents
| Identifier / date | P00700011268; valid 19/06/2025–18/06/2027 |
|---|---|
| What the supplied record establishes | Registration for KISHAN ENCLAVE, identifying Sy. No. 60 PART and promoter AJMEERA KISHAN AND OTHERS. |
| Identifier / date | 0002/LO/3090/2025, 19 June, 2025; application 009662/LO/DTCP/3090/0003/2023 |
|---|---|
| What the supplied record establishes | Municipality/Municipal Corporation approval for a tentative 52-plot layout in Sy. No. 60 PART, with infrastructure and land-handover conditions. |
| Identifier / date | File TS/026446/2024, 23-05-2024; LTP licence CA/2017/87850 |
|---|---|
| What the supplied record establishes | Layout drawing and land-use schedule; its extracted text describes the proposed layout and subdivision references. |
| Identifier / date | 2676/2025, 04 March, 2025 |
|---|---|
| What the supplied record establishes | Approval record identifies plots 17, 18, 19, 20, 38, 39, 40, 41, 42 and 43 as mortgaged to the Municipality/Municipal Corporation. |
| Identifier / date | Completion undertaking 18/06/2027 |
|---|---|
| What the supplied record establishes | Promoter’s declaration concerning completion and project obligations. |
| Identifier / date | Made May 2026 |
|---|---|
| What the supplied record establishes | Joint-development and plot-share arrangements described by the parties. |
The supplied records do not include an occupancy or completion certificate, a final layout release, or a complete plot-dimension and sales-inventory schedule.
Frequently asked questions
Is KISHAN ENCLAVE registered with Telangana RERA?
Yes. KISHAN ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00700011268; the registration status is New Project.
Who is the developer of KISHAN ENCLAVE?
The promoter named in the RERA registration is AJMEERA KISHAN AND OTHERS.
Where is KISHAN ENCLAVE located?
KISHAN ENCLAVE is in DORNAKAL MANDAL, Dornakal, Mahabubabad, Telangana (506381).
When will KISHAN ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 18/06/2027. This is the promoter's declaration, not a guarantee.