Skyverse Zenith
Radhey Constructions India Private Limited and others · Sangareddy · RERA P01100011166
Skyverse Zenith is a residential apartment project in Osman Nagar, RC PURAM, Sangareddy district, developed by RADHEY CONSTRUCTIONS INDIA PRIVATE LIMITED AND OTHERS. The project is on 26 Part and has a recorded total land area of 32055.49 sq.m. Its approved arrangement comprises three residential towers and one clubhouse: Tower 1 has 5 Common Basements, 1 Stilt and 47 Floors, while Towers 2 and 3 each have 4 Common Basements, 1 Stilt and 47 Floors; the RERA-filed inventory lists 470 3BHK units. The project is registered with TG-RERA under P01100011166, with proposed completion by 05.06.2031.
More from Radhey Constructions India Pvt Ltd and others · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | Skyverse Zenith RERA record |
| Project type and registered portion | Residential apartment project; the registration is for the project identified as 26 Part. No separate phase name or phase-wise registration scope is disclosed. RERA record |
| TG-RERA registration | P01100011166; Form C registration granted under section 5. |
| Registration validity | 06/06/2026 to 05/06/2031; stated duration: 4 Years, 11 Months, 30 Day. This is the registration period, not a statement that construction is complete. |
| Registered promoter | RADHEY CONSTRUCTIONS INDIA PRIVATE LIMITED AND OTHERS RERA record |
| RERA status | Registered. The certificate is dated 31/08/2026 and says the registration has not been extended. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Osman Nagar / OSMANNAGAR RERA record RERA filing |
| Revenue village | OSMANNAGAR (also rendered “Osman Nagar” in filed approval documents). RERA record |
| Mandal | RC PURAM in the RERA identity record; Ramachandrapuram in the filed approval documents. RERA record |
| District | Sangareddy RERA record |
| PIN | 502032 in the project header and RERA certificate. RERA record |
| Project survey number(s) | 26 Part; the building-permission materials also state 26PART and SY.NOS. 26 (P). No more specific project subdivision is identified in the registered project identity. RERA record |
| Site area | Approval documents state plot area 32055.49 sq.m, road-affected area 2363.13 sq.m, and net plot area 29616.49 sq.m. The RERA land record separately reports total area 32055.49 sq.m, affected area 4207.9 sq.m, and net area 27847.59 sq.m. These are reproduced as recorded; no reconciliation is made here. Land records |
| Boundaries in RERA filing | East: 40 feet WIde Road; West: Nebula; North: Survey 26 Part; South: 100 Feet Wide Road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / approval | HMDA building permission, approval number 2197/HMDA/SWBP/2026, dated 06/06/2026; the building permit order is issued by Cyberabad Municipal Corporation on the basis of HMDA technical approval. |
| Filed plan/file number | 009683/HMDA/02850/SWBP/SKP2/2025 |
| Approved built-up area | The plan records Total Proposed BUA excluding Parking (sq.m) 294682.72 and Total Proposed BUA including Parking (sq.m) 399623.24. These are distinct approved-plan figures. |
| Buildings and sanctioned configuration | Three residential towers and one clubhouse. Tower 1: 5 Common Basements + 1 Stilt + 47 Floors; Towers 2 and 3: 4 Common Basements + 1 Stilt + 47 Floors; clubhouse: Ground Floor + 5 Floors. |
| Heights stated in the plan | Residential tower height from ground level: 150.35 m; clubhouse height: 23.4 m. |
| Parking | Building-permission documents state Car Parking Spaces 2073.00 and Total Parking Area (Sq. Mtrs) 104940.53. The plan also records visitor parking area of 6020.69 sq.m (10.13%). |
| Unit count | RERA-filed inventory: 470 3BHK units. The approved-plan extraction states 467 proposed dwelling units for Tower 3; a project-wide sanctioned unit total is not confirmed in the extracted approval text. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 470 units. RERA unit table |
| RERA-filed saleable area | 214.89 sq.m for the 3BHK configuration. RERA unit table |
| Booked / available | 0 booked / 470 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No independently verified construction-progress or site-inspection record is supplied. The registration and approval documents describe a proposed project; the approval extraction says completion is not certified. |
| Completion timeline | Promoter’s Form B undertaking states completion by 05.06.2031; the building-permit order states construction to be completed before 06/06/2031. |
| Occupancy / completion certificate | No completion certificate or occupancy certificate is supplied; the approval extraction records completion_certified: false. This statement applies to the project record supplied, not a separately assessed tower or phase. |
2. The project story
Skyverse Zenith is registered as a residential apartment development at Osman Nagar, in the revenue village of OSMANNAGAR, Sangareddy district. Its filed identity describes the project land as Survey No. 26 Part. The building-permission materials describe three high-rise residential towers and a separate clubhouse building, with residential towers configured up to 47 upper floors over basement and stilt levels. RERA record
The RERA inventory lists 470 3BHK homes. The supplied approval extraction, however, identifies 467 proposed dwelling units for Tower 3 and does not confirm a project-wide approved unit count in the extracted text. The available record therefore establishes the RERA-filed inventory, but not a reconciled approved total. RERA unit table
The promoter undertook to complete the project by 05.06.2031. The permit gives a construction-completion date before 06/06/2031. No independently verified construction-stage report or occupancy/completion certificate is provided, so progress and delivery should not be inferred from registration, approval, or inventory data.
3. Master plan, architecture & building design
The extracted building-permission plan describes a gross plot area of 32055.49 sq.m, road-affected area of 2363.13 sq.m, water-bodies area of 75.87 sq.m, total plot deductions of 2439.0 sq.m, and net plot area of 29616.49 sq.m. It records proposed coverage of 7928.13 sq.m (27%), vacant plot area of 21648.24 sq.m, total proposed BUA excluding parking of 294682.72 sq.m, and total proposed BUA including parking of 399623.24 sq.m. These are plan-recorded measures; no FSI or carpet-area calculation is derived here.
The approved building arrangement comprises three residential towers and one clubhouse. Tower 1 has 5 common basement levels, a stilt and 47 floors; Towers 2 and 3 each have 4 common basement levels, a stilt and 47 floors. The clubhouse is described as ground floor plus five floors. The tower height is recorded as 150.35 m from ground level, and the clubhouse height as 23.4 m. The drawing extraction also gives tower areas of 2254.93 sq.m (Tower 1), 2478.26 sq.m (Tower 2) and 2360.46 sq.m (Tower 3); the available extraction does not label these figures as total building BUA.
The approval records a clubhouse area of 834.48 sq.m in the plan extraction. The building-permission letter separately lists clubhouse areas of 821.36 sq.m on the ground floor and 4111.55 sq.m on upper floors.
The plan and permit also identify tot-lots, green strips, open-space/buffer areas, internal access and parking. The extracted plan lists tot-lots of 495.94 sq.m, 415.71 sq.m, 336.24 sq.m, 50.4 sq.m and 1720.49 sq.m, and green strips of 105.14 sq.m and 96.38 sq.m. The permit requires the designated open space, greenery and tot-lot to be maintained for those purposes. The supplied material does not provide enough drawing detail to describe flat-per-floor counts, lift quantities or the full internal circulation layout.
4. Homes, configurations & floor plans
The TG-RERA inventory records one sale configuration: 3BHK, with 470 units and a filed saleable area of 214.89 sq.m. Booked and available counts below are the portal values in the supplied record, which carries no as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 470 | 0 | 470 | 214.89 sq.m | 102.0–189.5 sq.m; median 117.5 sq.m (software-measured from drawings; needs review) | 45% (drawing-derived record) |
Software measurement from the approved floor-plan drawing set identified 130 3BHK flat designs. The measured carpet-area range is 102.0–189.5 sq.m (median 117.5 sq.m); the drawing-derived record marks all 130 designs as needing review. These are software-measured drawing figures, not RERA-filed carpet areas. Carpet area is distinct from the RERA-filed saleable area, which is not to be treated as carpet area; the supplied drawing record notes that saleable area includes a share of common areas. Confirm any unit-specific area against the relevant approved drawing and sale documents. Floor plans RERA unit details
The RERA unit table also contains floor-label rows from “GROUND FLOOR” through “FIFTH FLOOR,” each with zero units; these are not additional homes for sale. RERA unit table
5. Parking & vehicle circulation
The building-permission extraction records 2073.00 car parking spaces and a total parking area of 104940.53 sq.m. It also records visitor parking area of 6020.69 sq.m (10.13%). The sanctioned configuration includes basement parking levels: five common basements for Tower 1 and four common basements for Towers 2 and 3, plus stilt levels.
The permission conditions state that approved cellar and stilt areas are to be used exclusively for vehicle parking and that visitor parking is to remain designated for visitors, not sold or misused. The permit also requires EV charging infrastructure in parking areas. The supplied records do not establish an individual buyer’s parking allotment, identify accessible or two-wheeler space counts, or provide a unit-specific exclusive parking right.
6. Amenities, recreation & open spaces
The following items appear in the supplied RERA and approval records. Their listing or approval does not establish that they have been built or are operational; the amenity progress fields supplied show 0%. RERA amenities
| Description / size | Clubhouse building; plan extraction states 834.48 sq.m. Permit lists 821.36 sq.m ground-floor and 4111.55 sq.m upper-floor areas. |
|---|---|
| Declared progress / verified status | Approved-plan record; progress not established |
| Description / size | Five listed areas: 495.94 sq.m, 415.71 sq.m, 336.24 sq.m, 50.4 sq.m, 1720.49 sq.m; permit also records total tot-lot area 3018.79 sq.m. |
|---|---|
| Declared progress / verified status | Approved-plan record; RERA amenity progress 0% |
| Description / size | Green strips 105.14 sq.m and 96.38 sq.m; plan also identifies vacant plot area 21648.24 sq.m. |
|---|---|
| Declared progress / verified status | Plan-recorded; completion not verified |
| Description / size | Listed in the plan-derived amenities/utility extraction; no size or capacity supplied. |
|---|---|
| Declared progress / verified status | Proposed/listed; completion not verified |
| Description / size | Listed in the RERA amenities schedule; no further description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0% |
| Description / size | Listed as available in the RERA amenities schedule; plan conditions also refer to driveways and service/access arrangements. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0%; completion not verified |
| Description / size | Listed in the RERA amenities schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0%; completion not verified |
7. Utilities, building services & safety
The RERA amenities schedule lists water supply, sewerage and treatment/disposal, storm-water drains, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities. The building-permission record specifies one rainwater-harvesting pit, a sewage treatment plant, a transformer space and a garbage house; it also requires dual piping for potable and non-potable water. These are recorded requirements or listed provisions, not evidence of completed or commissioned services. RERA amenities
For safety and building services, the permit requires fire-safety and means-of-escape provisions and an occupancy Fire NOC before issue of an occupancy certificate. It lists lifts, fire-escape stairs, refuge areas, a fire-control room, fire-water tank and related equipment in the plan-derived record. The supplied materials do not give lift counts or capacities, water-storage capacities, STP capacity, backup-power capacity, or a completed fire-safety inspection.
The permit also records provision for solar water heating and solar lighting, EV charging infrastructure, broadband/digital-connectivity infrastructure and a CTI/common-duct arrangement. The approval document states these as requirements/provisions; it does not establish installation or operating status.
8. Location, access & connectivity
The registered project location is OSMANNAGAR, RC PURAM, Sangareddy district, Telangana, PIN 502032. The building-permission record describes the site as Survey No. 26PART and notes a 30mts approach road; the RERA filing gives the site boundaries as 40 feet WIde Road to the east, Nebula to the west, Survey 26 Part to the north and 100 Feet Wide Road to the south. RERA record RERA filing
The supplied location dataset lists the nearest sampled Outer Ring Road interchange at approximately 7.0 km, Little Bridge School at 0.3 km, an unnamed park at 0.6 km, and Centeral Grass Court at 2.6 km. These are dataset-reported distances; no travel times or public-transport details are supplied. Location record
9. Developer & development status
The registered promoter is RADHEY CONSTRUCTIONS INDIA PRIVATE LIMITED AND OTHERS. The corporate record identifies Radhey Constructions India Pvt. Ltd. as a private limited company, with CIN U45209TG2013PTC090893 and GSTIN 36AAGCR6638E2Z7. The promoter organization field records “Others” and “and Others.” Corporate record Parties record
The RERA certificate lists the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500032.” The project-address record separately gives Ground Floor, Jayabheri Pine Valley, Osman Nagar Village, Osman Nagar, RC PURAM, Sangareddy, PIN 502032. No official promoter website or contact details are provided in the supplied data. Parties record
The promoter’s Form B affidavit, dated “9 day of JULY 2026,” undertakes completion by 05.06.2031 and makes declarations about title, encumbrances, project accounts, audits and pending approvals. These are promoter declarations, not independent verification of title, financing, construction progress or compliance. A separate affidavit dated 13.07.2026 undertakes to submit supplementary development agreements for 5 Ac 5.4Gts** within 60 days.
10. Approvals, official records & documents
| Record | What the supplied record establishes |
|---|---|
| TG-RERA certificate | Form C registration for Skyverse Zenith, number P01100011166, dated 31/08/2026, valid 06/06/2026–05/06/2031. |
| Building permission / technical approval | HMDA approval 2197/HMDA/SWBP/2026, dated 06/06/2026, for three residential towers and a clubhouse; the permit order is issued by Cyberabad Municipal Corporation. |
| Building-plan/file reference | 009683/HMDA/02850/SWBP/SKP2/2025; plan extraction records site, building, area, parking and conditions. |
| Commencement / construction timing | Permit records construction to commence before 03/12/2026 and be completed before 06/06/2031. No commencement notice or independently verified construction progress is supplied. |
| Occupancy / completion | The supplied approval extractions state that completion is not certified; no occupancy or completion certificate is included. |
| Promoter declarations | Form B affidavit for Skyverse Zenith and supplementary-development-agreement undertaking. |
| Other approval documents cited in the permit | Structural drawings and designs clearance certificate letter JNTU/CEH/CIVIL/PC/ 11094/2025, dated 30.12.2025; environmental clearance letter SIA/TG/INFRA2/551957/2025, dated 21.02.2026. These identifiers are cited in the filed permit extraction. |
| Layout plan | A layout-plan upload is listed in the RERA document register, but the supplied record does not contain an extracted approved layout plan. Document index |
1. Project at a glance
Project identity
Registered project name: Skyverse Zenith
Project type and registered portion: Residential apartment project; the registration is for the project identified as 26 Part. No separate phase name or phase-wise registration scope is disclosed.
TG-RERA registration: P01100011166; Form C registration granted under section 5.
Registration validity: 06/06/2026 to 05/06/2031; stated duration: 4 Years, 11 Months, 30 Day. This is the registration period, not a statement that construction is complete.
Registered promoter: RADHEY CONSTRUCTIONS INDIA PRIVATE LIMITED AND OTHERS
RERA status: Registered. The certificate is dated 31/08/2026 and says the registration has not been extended.
Land and geographic identity
Locality: Osman Nagar / OSMANNAGAR
Revenue village: OSMANNAGAR (also rendered “Osman Nagar” in filed approval documents).
Mandal: RC PURAM in the RERA identity record; Ramachandrapuram in the filed approval documents.
District: Sangareddy
PIN: 502032 in the project header and RERA certificate.
Project survey number(s): 26 Part; the building-permission materials also state 26PART and SY.NOS. 26 (P). No more specific project subdivision is identified in the registered project identity.
Site area: Approval documents state plot area 32055.49 sq.m, road-affected area 2363.13 sq.m, and net plot area 29616.49 sq.m. The RERA land record separately reports total area 32055.49 sq.m, affected area 4207.9 sq.m, and net area 27847.59 sq.m. These are reproduced as recorded; no reconciliation is made here.
Boundaries in RERA filing: East: 40 feet WIde Road; West: Nebula; North: Survey 26 Part; South: 100 Feet Wide Road.
Development identity
Sanctioning authority / approval: HMDA building permission, approval number 2197/HMDA/SWBP/2026, dated 06/06/2026; the building permit order is issued by Cyberabad Municipal Corporation on the basis of HMDA technical approval.
Filed plan/file number: 009683/HMDA/02850/SWBP/SKP2/2025
Approved built-up area: The plan records Total Proposed BUA excluding Parking (sq.m) 294682.72 and Total Proposed BUA including Parking (sq.m) 399623.24. These are distinct approved-plan figures.
Buildings and sanctioned configuration: Three residential towers and one clubhouse. Tower 1: 5 Common Basements + 1 Stilt + 47 Floors; Towers 2 and 3: 4 Common Basements + 1 Stilt + 47 Floors; clubhouse: Ground Floor + 5 Floors.
Heights stated in the plan: Residential tower height from ground level: 150.35 m; clubhouse height: 23.4 m.
Parking: Building-permission documents state Car Parking Spaces 2073.00 and Total Parking Area (Sq. Mtrs) 104940.53. The plan also records visitor parking area of 6020.69 sq.m (10.13%).
Unit count: RERA-filed inventory: 470 3BHK units. The approved-plan extraction states 467 proposed dwelling units for Tower 3; a project-wide sanctioned unit total is not confirmed in the extracted approval text.
Offering and status
RERA-filed configuration: 3BHK, 470 units.
RERA-filed saleable area: 214.89 sq.m for the 3BHK configuration.
Booked / available: 0 booked / 470 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative.
Construction stage: No independently verified construction-progress or site-inspection record is supplied. The registration and approval documents describe a proposed project; the approval extraction says completion is not certified.
Completion timeline: Promoter’s Form B undertaking states completion by 05.06.2031; the building-permit order states construction to be completed before 06/06/2031.
Occupancy / completion certificate: No completion certificate or occupancy certificate is supplied; the approval extraction records completion_certified: false. This statement applies to the project record supplied, not a separately assessed tower or phase.
2. The project story
Skyverse Zenith is registered as a residential apartment development at Osman Nagar, in the revenue village of OSMANNAGAR, Sangareddy district. Its filed identity describes the project land as Survey No. 26 Part. The building-permission materials describe three high-rise residential towers and a separate clubhouse building, with residential towers configured up to 47 upper floors over basement and stilt levels.
The RERA inventory lists 470 3BHK homes. The supplied approval extraction, however, identifies 467 proposed dwelling units for Tower 3 and does not confirm a project-wide approved unit count in the extracted text. The available record therefore establishes the RERA-filed inventory, but not a reconciled approved total.
The promoter undertook to complete the project by 05.06.2031. The permit gives a construction-completion date before 06/06/2031. No independently verified construction-stage report or occupancy/completion certificate is provided, so progress and delivery should not be inferred from registration, approval, or inventory data.
3. Master plan, architecture & building design
The extracted building-permission plan describes a gross plot area of 32055.49 sq.m, road-affected area of 2363.13 sq.m, water-bodies area of 75.87 sq.m, total plot deductions of 2439.0 sq.m, and net plot area of 29616.49 sq.m. It records proposed coverage of 7928.13 sq.m (27%), vacant plot area of 21648.24 sq.m, total proposed BUA excluding parking of 294682.72 sq.m, and total proposed BUA including parking of 399623.24 sq.m. These are plan-recorded measures; no FSI or carpet-area calculation is derived here.
The approved building arrangement comprises three residential towers and one clubhouse. Tower 1 has 5 common basement levels, a stilt and 47 floors; Towers 2 and 3 each have 4 common basement levels, a stilt and 47 floors. The clubhouse is described as ground floor plus five floors. The tower height is recorded as 150.35 m from ground level, and the clubhouse height as 23.4 m. The drawing extraction also gives tower areas of 2254.93 sq.m (Tower 1), 2478.26 sq.m (Tower 2) and 2360.46 sq.m (Tower 3); the available extraction does not label these figures as total building BUA.
The approval records a clubhouse area of 834.48 sq.m in the plan extraction. The building-permission letter separately lists clubhouse areas of 821.36 sq.m on the ground floor and 4111.55 sq.m on upper floors.
The plan and permit also identify tot-lots, green strips, open-space/buffer areas, internal access and parking. The extracted plan lists tot-lots of 495.94 sq.m, 415.71 sq.m, 336.24 sq.m, 50.4 sq.m and 1720.49 sq.m, and green strips of 105.14 sq.m and 96.38 sq.m. The permit requires the designated open space, greenery and tot-lot to be maintained for those purposes. The supplied material does not provide enough drawing detail to describe flat-per-floor counts, lift quantities or the full internal circulation layout.
4. Homes, configurations & floor plans
The TG-RERA inventory records one sale configuration: 3BHK, with 470 units and a filed saleable area of 214.89 sq.m. Booked and available counts below are the portal values in the supplied record, which carries no as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 470 | 0 | 470 | 214.89 sq.m | 102.0–189.5 sq.m; median 117.5 sq.m (software-measured from drawings; needs review) | 45% (drawing-derived record) |
Software measurement from the approved floor-plan drawing set identified 130 3BHK flat designs. The measured carpet-area range is 102.0–189.5 sq.m (median 117.5 sq.m); the drawing-derived record marks all 130 designs as needing review. These are software-measured drawing figures, not RERA-filed carpet areas. Carpet area is distinct from the RERA-filed saleable area, which is not to be treated as carpet area; the supplied drawing record notes that saleable area includes a share of common areas. Confirm any unit-specific area against the relevant approved drawing and sale documents.
The RERA unit table also contains floor-label rows from “GROUND FLOOR” through “FIFTH FLOOR,” each with zero units; these are not additional homes for sale.
5. Parking & vehicle circulation
The building-permission extraction records 2073.00 car parking spaces and a total parking area of 104940.53 sq.m. It also records visitor parking area of 6020.69 sq.m (10.13%). The sanctioned configuration includes basement parking levels: five common basements for Tower 1 and four common basements for Towers 2 and 3, plus stilt levels.
The permission conditions state that approved cellar and stilt areas are to be used exclusively for vehicle parking and that visitor parking is to remain designated for visitors, not sold or misused. The permit also requires EV charging infrastructure in parking areas. The supplied records do not establish an individual buyer’s parking allotment, identify accessible or two-wheeler space counts, or provide a unit-specific exclusive parking right.
6. Amenities, recreation & open spaces
The following items appear in the supplied RERA and approval records. Their listing or approval does not establish that they have been built or are operational; the amenity progress fields supplied show 0%.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse | Clubhouse building; plan extraction states 834.48 sq.m. Permit lists 821.36 sq.m ground-floor and 4111.55 sq.m upper-floor areas. | Approved-plan record; progress not established | |
| Tot-lots / play areas | Five listed areas: 495.94 sq.m, 415.71 sq.m, 336.24 sq.m, 50.4 sq.m, 1720.49 sq.m; permit also records total tot-lot area 3018.79 sq.m. | Approved-plan record; RERA amenity progress 0% | |
| Green strips / open space | Green strips 105.14 sq.m and 96.38 sq.m; plan also identifies vacant plot area 21648.24 sq.m. | Plan-recorded; completion not verified | |
| Swimming pool | Listed in the plan-derived amenities/utility extraction; no size or capacity supplied. | Proposed/listed; completion not verified | |
| Community buildings | Listed in the RERA amenities schedule; no further description or size supplied. | RERA progress 0% | |
| Internal roads and footpaths | Listed as available in the RERA amenities schedule; plan conditions also refer to driveways and service/access arrangements. | RERA progress 0%; completion not verified | |
| Street lighting | Listed in the RERA amenities schedule. | RERA progress 0%; completion not verified |
7. Utilities, building services & safety
The RERA amenities schedule lists water supply, sewerage and treatment/disposal, storm-water drains, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities. The building-permission record specifies one rainwater-harvesting pit, a sewage treatment plant, a transformer space and a garbage house; it also requires dual piping for potable and non-potable water. These are recorded requirements or listed provisions, not evidence of completed or commissioned services.
For safety and building services, the permit requires fire-safety and means-of-escape provisions and an occupancy Fire NOC before issue of an occupancy certificate. It lists lifts, fire-escape stairs, refuge areas, a fire-control room, fire-water tank and related equipment in the plan-derived record. The supplied materials do not give lift counts or capacities, water-storage capacities, STP capacity, backup-power capacity, or a completed fire-safety inspection.
The permit also records provision for solar water heating and solar lighting, EV charging infrastructure, broadband/digital-connectivity infrastructure and a CTI/common-duct arrangement. The approval document states these as requirements/provisions; it does not establish installation or operating status.
8. Location, access & connectivity
The registered project location is OSMANNAGAR, RC PURAM, Sangareddy district, Telangana, PIN 502032. The building-permission record describes the site as Survey No. 26PART and notes a 30mts approach road; the RERA filing gives the site boundaries as 40 feet WIde Road to the east, Nebula to the west, Survey 26 Part to the north and 100 Feet Wide Road to the south.
The supplied location dataset lists the nearest sampled Outer Ring Road interchange at approximately 7.0 km, Little Bridge School at 0.3 km, an unnamed park at 0.6 km, and Centeral Grass Court at 2.6 km. These are dataset-reported distances; no travel times or public-transport details are supplied.
9. Developer & development status
The registered promoter is RADHEY CONSTRUCTIONS INDIA PRIVATE LIMITED AND OTHERS. The corporate record identifies Radhey Constructions India Pvt. Ltd. as a private limited company, with CIN U45209TG2013PTC090893 and GSTIN 36AAGCR6638E2Z7. The promoter organization field records “Others” and “and Others.”
The RERA certificate lists the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500032.” The project-address record separately gives Ground Floor, Jayabheri Pine Valley, Osman Nagar Village, Osman Nagar, RC PURAM, Sangareddy, PIN 502032. No official promoter website or contact details are provided in the supplied data.
The promoter’s Form B affidavit, dated “9 day of JULY 2026,” undertakes completion by 05.06.2031 and makes declarations about title, encumbrances, project accounts, audits and pending approvals. These are promoter declarations, not independent verification of title, financing, construction progress or compliance. A separate affidavit dated 13.07.2026 undertakes to submit supplementary development agreements for 5 Ac 5.4Gts** within 60 days.
10. Approvals, official records & documents
TG-RERA certificate: Form C registration for Skyverse Zenith, number P01100011166, dated 31/08/2026, valid 06/06/2026–05/06/2031.
Building permission / technical approval: HMDA approval 2197/HMDA/SWBP/2026, dated 06/06/2026, for three residential towers and a clubhouse; the permit order is issued by Cyberabad Municipal Corporation.
Building-plan/file reference: 009683/HMDA/02850/SWBP/SKP2/2025; plan extraction records site, building, area, parking and conditions.
Commencement / construction timing: Permit records construction to commence before 03/12/2026 and be completed before 06/06/2031. No commencement notice or independently verified construction progress is supplied.
Occupancy / completion: The supplied approval extractions state that completion is not certified; no occupancy or completion certificate is included.
Promoter declarations: Form B affidavit for Skyverse Zenith and supplementary-development-agreement undertaking.
Other approval documents cited in the permit: Structural drawings and designs clearance certificate letter JNTU/CEH/CIVIL/PC/ 11094/2025, dated 30.12.2025; environmental clearance letter SIA/TG/INFRA2/551957/2025, dated 21.02.2026. These identifiers are cited in the filed permit extraction.
Layout plan: A layout-plan upload is listed in the RERA document register, but the supplied record does not contain an extracted approved layout plan.
Frequently asked questions
Is Skyverse Zenith registered with Telangana RERA?
Yes. Skyverse Zenith is registered with the Telangana Real Estate Regulatory Authority as P01100011166; the registration status is New Project.
Who is the developer of Skyverse Zenith?
The promoter named in the RERA registration is Radhey Constructions India Private Limited and others.
Where is Skyverse Zenith located?
Skyverse Zenith is in Osman Nagar, OSMANNAGAR, RC PURAM, Sangareddy, Telangana (502032).
When will Skyverse Zenith be completed?
The promoter's proposed date of completion filed with RERA is 05/10/2031. This is the promoter's declaration, not a guarantee.
More projects in Osmannagar