Fortune Towers
VIDHATRI HOMES LLP · Sangareddy · RERA P01100010672
FORTUNE TOWERS is a residential apartment project in Kazipally- ORRGC, Jinnaram Mandal, Sangareddy District. The registered promoter is VIDHATRI HOMES LLP, and the registered site extent is 19,479.18 sq.m. The project comprises five residential blocks, A–E, each described as 1 Stilt + 5 upper floors, and the TG-RERA filing lists 245 2BHK and 185 3BHK homes. It is registered under TG-RERA number P01100010672, with proposed completion listed as 23/01/2032.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project | FORTUNE TOWERS |
| Project type | Residential apartment project RERA record |
| Registered phase / portion | No separate phase name or phase-wise registration scope is disclosed. The registration record covers the project under the number below. RERA record |
| TG-RERA registration | P01100010672 |
| Registration validity | 23/09/2025 to 23/09/2031 (six years); no extension is recorded in the supplied certificate. This is registration validity, not the completion deadline. |
| Registered promoter | VIDHATRI HOMES LLP, an LLP RERA record Corporate record |
| RERA status | Registered under section 5; certificate issued 17/03/2026. The certificate requires quarterly updates and records other registration conditions. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Kazipally- ORRGC RERA record RERA filing |
| Revenue villages named in project records | Kazipally-ORRGC / Kazipally, Khajipally, and Mallampet. The RERA filing identity uses Kazipally-ORRGC; the filed approval records also identify Khajipally and Mallampet. RERA record |
| Mandal / district / PIN | Jinnaram Mandal, Sangareddy District, PIN 502309 in the project header and RERA certificate. Approval records also name Dundigal Gandimaisamma Mandal and Medchal-Malkajgiri District for part of the land. RERA record |
| All survey numbers and subdivisions in the RERA certificate | 264, 265, 267, 268; 207/EE2, 207E/4, 207/A, 207/AA, 207/EE, 207/E/1, 207/E3, 207/EE1/3, 207/EE1/1, 207/A/1, 209/AA1, 209/EE2. |
| Additional survey numbers and subdivisions printed in the HMDA technical approval | 207/EE2, 207E/4, 207/A, 207/AA, 207/EE, 207/E/1, 207E3, 207/EE1/3, 207/EE1/1, 207/A/1, 209/AA1, 209/EE2, 209/AA3/1/1, 209/E/1/2, 209/E/4, 209/AA3/1/2, 209/AA4, 209/EE1, 209/A, 209/AA2, 209/A/1, 209E/1/1, 210/A2/1, 210/E, 234, 234/1, 234/2, 264, 265, 267, 268. |
| Registered site extent | 19,479.18 sq.m.; the RERA land record gives total and net area as 19,479.18 sq.m. RERA record Land records |
| Approval-document area by village | HMDA technical plan states 14654.15 sq.mts in Khajipally Village and 4820.03 sq.mts in Mallampet Village. |
| Boundaries | North: land in Sy.Nos. 209 part and 210 part; South: road width 18; East: Sy.No. 206 and 15 MTS wide road; West: land in Sy.Nos. 231, 232, 233, 235 and 236. RERA record |
Development identity
| Item | Project record |
|---|---|
| Sanctioning / technical authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval was forwarded for final sanction to the local authority. The supplied building permit is issued by Gaddapotharam Municipality. |
| Principal approval reference | 061358/ZOC/R1/U6/HMDA/23062023. HMDA technical approval dated 28-07-2025; a further HMDA technical approval letter is dated 23/09/2025. Approvals record |
| Local building permit | Gaddapotharam Municipality Building Permit Order, approval no. G1/131 /GPM/23062023, dated 12.12.2025. Approvals record |
| Approved built-up area figures as stated in filed approvals | HMDA technical approval letter states total built-up area 49,208.3 Sq.mts and proposed built-up area 62,928.87; the technical plan separately states proposed net BUA area 49,552.47 and total proposed net BUA area 49,933.97. These are the approval document’s distinct labels and are not interchangeable. |
| Building organization | Five residential blocks, A–E, plus AMENITIES (ALL). |
| Sanctioned floor configuration | Each listed block is described as 1 Stilt + 5 upper floors. The supplied approval extracts do not identify a basement or podium. |
| Parking levels | Stilt floors are designated for parking in the approval conditions. A total parking-space count is not established in the supplied records. |
| Unit counts | HMDA technical plan: 430.00 dwelling units. TG-RERA filing: 435 total units in its unit table, comprising 245 2BHK and 185 3BHK homes plus 5 AMENITIES SPACE entries not classified as homes for sale. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed home types and saleable area | 2BHK: 245 units, 35.05 sq.m. each as filed. 3BHK: 185 units, 75.66 sq.m. each as filed. RERA unit table RERA unit details |
| Booked / available | Portal-derived figures show 2BHK 3 booked / 242 available and 3BHK 3 booked / 182 available. The record has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | No independently verified site-progress measurement is supplied. The project is registered as a new project; no completed or occupancy-certified block is evidenced in the supplied records. RERA record Document index |
| Completion dates | RERA Form B declares completion by 23/09/2031; the project header separately lists proposed completion 23/01/2032. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied. The approval letter requires the developer to approach HMDA for an occupancy certificate after completion. |
2. The project story
FORTUNE TOWERS is registered with TG-RERA as a residential apartment project on a site identified in the filing as Kazipally-ORRGC, Jinnaram Mandal, Sangareddy District. The filed approval documents describe land in Khajipally and Mallampet as well as Kazipally-ORRGC, with the corresponding survey schedules set out above. RERA record
The approved building arrangement comprises five residential blocks—A through E—and a separate block labelled “AMENITIES (ALL).” The blocks are described as Stilt + 5 upper floors. The TG-RERA unit schedule lists 2BHK and 3BHK homes; its five “AMENITIES SPACE” entries are not counted here as homes. RERA unit table
The registration certificate and the filed approvals establish the project’s registration and approval records, but they do not establish construction completion. No site-verified progress percentage or occupancy certificate is included in the supplied material. The Form B completion undertaking is 23/09/2031; the project header also records 23/01/2032 as the proposed completion date. RERA record
3. Master plan, architecture & building design
The HMDA technical plan describes a 19,479.18 sq.m. site, with proposed coverage area 11,826.00 and six listed blocks: five residential blocks and the amenities block. The plan records residential net BUA 47,732.75, commercial net BUA 1,475.52, proposed net BUA area 49,552.47, and total proposed net BUA area 49,933.97. A separate HMDA technical approval letter states total built-up area 49,208.3 Sq.mts and proposed built-up area 62,928.87; these labels are reproduced as given in the filed approval records, not reconciled into a single area figure.
All six blocks are shown as 1 Stilt + 5 upper floors. The supplied approval extracts do not state a basement or podium level, tower-by-tower homes-per-floor, lift or stair counts, building footprints, or detailed internal circulation dimensions. The HMDA technical plan records an AccessoryUse Area 45.00 and Vacant Plot Area 7608.18; units are not specified for those two entries in the extract.
The approval conditions require the stilt floor to be used for parking, prohibit parking or construction in setback areas, and require the approved internal circulation pattern and earmarked open space to be maintained. The supplied extracts do not provide a complete, legible approved layout sheet from which to describe the block arrangement, roads, or landscaping in detail.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 245 | 3 | 242 | 35.05 sq.m. | Not measured in supplied drawing review | Not supplied |
| 3BHK | 185 | 3 | 182 | 75.66 sq.m. | Not measured in supplied drawing review | Not supplied |
Unit counts, booking figures and saleable areas are from the TG-RERA filing; booked/available counts have no stated portal as-of date and are indicative. The drawing review reports seven drawings in total, with four scans pending and 0 measured. Accordingly, no software-measured carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans
The filed “saleable area” should not be treated as carpet area: the supplied drawing-review note explains that carpet area is measured from drawing geometry and is smaller than saleable area, which includes the home’s share of common areas. No measured carpet, balcony, utility, or loading figures are available here. Floor plans RERA unit details
5. Parking & vehicle circulation
The approvals designate the stilt floors for parking and state that parking areas must not be converted to another use. The supplied records do not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible parking, a parking allocation for any specific unit, or mechanical/basement/podium parking.
The approved plan conditions also protect the approved internal circulation pattern and require that setbacks remain free of parking and construction. Detailed ramp, driveway, entry/exit, pedestrian-separation, and EV-charging arrangements are not established by the supplied approval extracts.
6. Amenities, recreation & open spaces
The TG-RERA amenities schedule lists 14 project infrastructure/facility categories. Each listed progress figure is 0%; this is the filed progress information, not independent verification of whether work has started or been completed. RERA amenities
| Description / size | Approval identifies AMENITIES (ALL); no detailed facility schedule or size is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities schedule: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no size is stated there. Approval plan separately records Vacant Plot Area 7608.18 (unit not specified in the extract). |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no dimensions or quantities supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no capacity or source detail in that schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; approval conditions refer to STP provision. No capacity is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no capacity or detailed design supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; approval conditions require a waste-management system and identify a garbage house. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; approval letters require rainwater-harvesting structures. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
The promoter’s website lists additional recreational and clubhouse features, including a swimming pool, gym, indoor games, landscaped gardens, jogging/walking track, children’s play area, and courts. These are promoter-marketed claims, not established here as RERA-declared or delivered facilities. Promoter website
7. Utilities, building services & safety
The RERA amenities schedule lists water supply, sewerage and sewage treatment, storm-water drains, energy management, fire protection, an electrical meter room/sub-station/receiving station, and rainwater harvesting. It gives 0% progress for the listed items; no independent completion evidence or capacities are supplied. RERA amenities
The approval records require provision for an STP, transformer, garbage house, sump, septic tank and underground drainage. HMDA conditions specify separate underground and terrace water storage tanks of 25,000 Lits. capacity each for residential buildings, and call for water disinfection to maintain 0.3 to 0.4 p.m. residual chlorine. These are approval conditions, not evidence that the systems have been installed or commissioned.
The HMDA approval conditions also specify fire extinguishers, manual alarm arrangements, hose reels and down-comers; automatic sprinklers if basement area exceeds 200 Sq. Mtrs; and fire-resistant transformer construction. The approvals require compliance with fire-safety and structural-safety requirements. The supplied records do not establish installed systems, lift numbers or capacities, backup-power capacity, CCTV/access-control installation, EV charging equipment, or accessible circulation.
8. Location, access & connectivity
The project’s RERA location is Kazipally- ORRGC, Jinnaram Mandal, Sangareddy District, PIN 502309. The filed approvals identify land across Kazipally-ORRGC/Kazipally, Khajipally and Mallampet, and show abutting road widths of 18.00 and 15.00 MTS in the HMDA technical plan. RERA record
A cadastral parcel centroid is recorded at 17.41528, 78.35459. The supplied location record lists Financial District (Nanakramguda) at 1.2 km as an anchor distance; no other independently measured access distances or public-transport details are supplied. Location record
9. Developer & development status
The registered promoter is VIDHATRI HOMES LLP, an LLP, with GSTIN 36AAVFV4823H1ZM. The project record names KROSURI RAMA KOTESWARA RAO as authorized signatory. The supplied promoter address is D.NO. 10-5, Jinnaram, Kazipally- ORRGC, Sangareddy, Telangana, PIN 502309. Corporate record Parties record RERA filing
The promoter’s website is https://fortunetowers.co.in/. Website descriptions and facilities are promoter-marketed information; they are not treated here as approval or completion evidence. Parties record Promoter website
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA certificate, P01100010672 | FORM C registration under section 5 for FORTUNE TOWERS; valid 23/09/2025–23/09/2031; certificate issue date 17/03/2026. |
| HMDA technical approval plan, 061358/ZOC/R1/U6/HMDA/23062023 | Technical approval plan dated 28-07-2025, recording site and area data, five residential blocks plus an amenities block, 430 dwelling units, and approval conditions; includes referral to the local authority for final sanction. |
| HMDA technical approval letter, 061358/ZOC/R1/U6/HMDA/23062023 | Technical approval dated 23/09/2025; forwards plans for final sanction and records conditions, including the requirement to obtain an occupancy certificate after completion. |
| Gaddapotharam Municipality Building Permit Order, G1/131 /GPM/23062023 | Building permit dated 12.12.2025 for Blocks A–E and the amenities block, described as Stilt + 5, subject to listed conditions. |
| Floor-plan and layout records | Some uploaded records are drawing sheets, while other layout-document entries contain only interface text or OCR that does not establish approval particulars. The drawing review records seven drawings, four scans pending and no measured plans. Floor plans |
| Promoter Form B declaration | Form B affidavit dated 19-12-2025, with a declared completion undertaking of 23/09/2031 and project-fund and compliance declarations. |
No occupancy or completion certificate is included in the supplied project documents.
1. Project at a glance
Project identity
Registered project: FORTUNE TOWERS
Project type: Residential apartment project
Registered phase / portion: No separate phase name or phase-wise registration scope is disclosed. The registration record covers the project under the number below.
TG-RERA registration: P01100010672
Registration validity: 23/09/2025 to 23/09/2031 (six years); no extension is recorded in the supplied certificate. This is registration validity, not the completion deadline.
Registered promoter: VIDHATRI HOMES LLP, an LLP
RERA status: Registered under section 5; certificate issued 17/03/2026. The certificate requires quarterly updates and records other registration conditions.
Land and geographic identity
Locality: Kazipally- ORRGC
Revenue villages named in project records: Kazipally-ORRGC / Kazipally, Khajipally, and Mallampet. The RERA filing identity uses Kazipally-ORRGC; the filed approval records also identify Khajipally and Mallampet.
Mandal / district / PIN: Jinnaram Mandal, Sangareddy District, PIN 502309 in the project header and RERA certificate. Approval records also name Dundigal Gandimaisamma Mandal and Medchal-Malkajgiri District for part of the land.
All survey numbers and subdivisions in the RERA certificate: 264, 265, 267, 268; 207/EE2, 207E/4, 207/A, 207/AA, 207/EE, 207/E/1, 207/E3, 207/EE1/3, 207/EE1/1, 207/A/1, 209/AA1, 209/EE2.
Additional survey numbers and subdivisions printed in the HMDA technical approval: 207/EE2, 207E/4, 207/A, 207/AA, 207/EE, 207/E/1, 207E3, 207/EE1/3, 207/EE1/1, 207/A/1, 209/AA1, 209/EE2, 209/AA3/1/1, 209/E/1/2, 209/E/4, 209/AA3/1/2, 209/AA4, 209/EE1, 209/A, 209/AA2, 209/A/1, 209E/1/1, 210/A2/1, 210/E, 234, 234/1, 234/2, 264, 265, 267, 268.
Registered site extent: 19,479.18 sq.m.; the RERA land record gives total and net area as 19,479.18 sq.m.
Approval-document area by village: HMDA technical plan states 14654.15 sq.mts in Khajipally Village and 4820.03 sq.mts in Mallampet Village.
Boundaries: North: land in Sy.Nos. 209 part and 210 part; South: road width 18; East: Sy.No. 206 and 15 MTS wide road; West: land in Sy.Nos. 231, 232, 233, 235 and 236.
Development identity
Sanctioning / technical authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval was forwarded for final sanction to the local authority. The supplied building permit is issued by Gaddapotharam Municipality.
Principal approval reference: 061358/ZOC/R1/U6/HMDA/23062023. HMDA technical approval dated 28-07-2025; a further HMDA technical approval letter is dated 23/09/2025.
Local building permit: Gaddapotharam Municipality Building Permit Order, approval no. G1/131 /GPM/23062023, dated 12.12.2025.
Approved built-up area figures as stated in filed approvals: HMDA technical approval letter states total built-up area 49,208.3 Sq.mts and proposed built-up area 62,928.87; the technical plan separately states proposed net BUA area 49,552.47 and total proposed net BUA area 49,933.97. These are the approval document’s distinct labels and are not interchangeable.
Building organization: Five residential blocks, A–E, plus AMENITIES (ALL).
Sanctioned floor configuration: Each listed block is described as 1 Stilt + 5 upper floors. The supplied approval extracts do not identify a basement or podium.
Parking levels: Stilt floors are designated for parking in the approval conditions. A total parking-space count is not established in the supplied records.
Unit counts: HMDA technical plan: 430.00 dwelling units. TG-RERA filing: 435 total units in its unit table, comprising 245 2BHK and 185 3BHK homes plus 5 AMENITIES SPACE entries not classified as homes for sale.
Offering and status
RERA-filed home types and saleable area: 2BHK: 245 units, 35.05 sq.m. each as filed. 3BHK: 185 units, 75.66 sq.m. each as filed.
Booked / available: Portal-derived figures show 2BHK 3 booked / 242 available and 3BHK 3 booked / 182 available. The record has no as-of date, so these counts are indicative.
Construction stage: No independently verified site-progress measurement is supplied. The project is registered as a new project; no completed or occupancy-certified block is evidenced in the supplied records.
Completion dates: RERA Form B declares completion by 23/09/2031; the project header separately lists proposed completion 23/01/2032.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied. The approval letter requires the developer to approach HMDA for an occupancy certificate after completion.
2. The project story
FORTUNE TOWERS is registered with TG-RERA as a residential apartment project on a site identified in the filing as Kazipally-ORRGC, Jinnaram Mandal, Sangareddy District. The filed approval documents describe land in Khajipally and Mallampet as well as Kazipally-ORRGC, with the corresponding survey schedules set out above.
The approved building arrangement comprises five residential blocks—A through E—and a separate block labelled “AMENITIES (ALL).” The blocks are described as Stilt + 5 upper floors. The TG-RERA unit schedule lists 2BHK and 3BHK homes; its five “AMENITIES SPACE” entries are not counted here as homes.
The registration certificate and the filed approvals establish the project’s registration and approval records, but they do not establish construction completion. No site-verified progress percentage or occupancy certificate is included in the supplied material. The Form B completion undertaking is 23/09/2031; the project header also records 23/01/2032 as the proposed completion date.
3. Master plan, architecture & building design
The HMDA technical plan describes a 19,479.18 sq.m. site, with proposed coverage area 11,826.00 and six listed blocks: five residential blocks and the amenities block. The plan records residential net BUA 47,732.75, commercial net BUA 1,475.52, proposed net BUA area 49,552.47, and total proposed net BUA area 49,933.97. A separate HMDA technical approval letter states total built-up area 49,208.3 Sq.mts and proposed built-up area 62,928.87; these labels are reproduced as given in the filed approval records, not reconciled into a single area figure.
All six blocks are shown as 1 Stilt + 5 upper floors. The supplied approval extracts do not state a basement or podium level, tower-by-tower homes-per-floor, lift or stair counts, building footprints, or detailed internal circulation dimensions. The HMDA technical plan records an AccessoryUse Area 45.00 and Vacant Plot Area 7608.18; units are not specified for those two entries in the extract.
The approval conditions require the stilt floor to be used for parking, prohibit parking or construction in setback areas, and require the approved internal circulation pattern and earmarked open space to be maintained. The supplied extracts do not provide a complete, legible approved layout sheet from which to describe the block arrangement, roads, or landscaping in detail.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 245 | 3 | 242 | 35.05 sq.m. | Not measured in supplied drawing review | Not supplied |
| 3BHK | 185 | 3 | 182 | 75.66 sq.m. | Not measured in supplied drawing review | Not supplied |
Unit counts, booking figures and saleable areas are from the TG-RERA filing; booked/available counts have no stated portal as-of date and are indicative. The drawing review reports seven drawings in total, with four scans pending and 0 measured. Accordingly, no software-measured carpet area or room dimensions can be reported.
The filed “saleable area” should not be treated as carpet area: the supplied drawing-review note explains that carpet area is measured from drawing geometry and is smaller than saleable area, which includes the home’s share of common areas. No measured carpet, balcony, utility, or loading figures are available here.
5. Parking & vehicle circulation
The approvals designate the stilt floors for parking and state that parking areas must not be converted to another use. The supplied records do not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible parking, a parking allocation for any specific unit, or mechanical/basement/podium parking.
The approved plan conditions also protect the approved internal circulation pattern and require that setbacks remain free of parking and construction. Detailed ramp, driveway, entry/exit, pedestrian-separation, and EV-charging arrangements are not established by the supplied approval extracts.
6. Amenities, recreation & open spaces
The TG-RERA amenities schedule lists 14 project infrastructure/facility categories. Each listed progress figure is 0%; this is the filed progress information, not independent verification of whether work has started or been completed.
| Description / size | Approval identifies AMENITIES (ALL); no detailed facility schedule or size is supplied. |
|---|---|
| Declared progress / verified status | RERA amenities schedule: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no size is stated there. Approval plan separately records Vacant Plot Area 7608.18 (unit not specified in the extract). |
|---|---|
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no dimensions or quantities supplied. |
|---|---|
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no capacity or source detail in that schedule. |
|---|---|
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; approval conditions refer to STP provision. No capacity is supplied. |
|---|---|
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; no capacity or detailed design supplied. |
|---|---|
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; approval conditions require a waste-management system and identify a garbage house. |
|---|---|
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities schedule; approval letters require rainwater-harvesting structures. |
|---|---|
| Declared progress / verified status | RERA progress: 0%; completion not independently verified. |
The promoter’s website lists additional recreational and clubhouse features, including a swimming pool, gym, indoor games, landscaped gardens, jogging/walking track, children’s play area, and courts. These are promoter-marketed claims, not established here as RERA-declared or delivered facilities.
7. Utilities, building services & safety
The RERA amenities schedule lists water supply, sewerage and sewage treatment, storm-water drains, energy management, fire protection, an electrical meter room/sub-station/receiving station, and rainwater harvesting. It gives 0% progress for the listed items; no independent completion evidence or capacities are supplied.
The approval records require provision for an STP, transformer, garbage house, sump, septic tank and underground drainage. HMDA conditions specify separate underground and terrace water storage tanks of 25,000 Lits. capacity each for residential buildings, and call for water disinfection to maintain 0.3 to 0.4 p.m. residual chlorine. These are approval conditions, not evidence that the systems have been installed or commissioned.
The HMDA approval conditions also specify fire extinguishers, manual alarm arrangements, hose reels and down-comers; automatic sprinklers if basement area exceeds 200 Sq. Mtrs; and fire-resistant transformer construction. The approvals require compliance with fire-safety and structural-safety requirements. The supplied records do not establish installed systems, lift numbers or capacities, backup-power capacity, CCTV/access-control installation, EV charging equipment, or accessible circulation.
8. Location, access & connectivity
The project’s RERA location is Kazipally- ORRGC, Jinnaram Mandal, Sangareddy District, PIN 502309. The filed approvals identify land across Kazipally-ORRGC/Kazipally, Khajipally and Mallampet, and show abutting road widths of 18.00 and 15.00 MTS in the HMDA technical plan.
A cadastral parcel centroid is recorded at 17.41528, 78.35459. The supplied location record lists Financial District (Nanakramguda) at 1.2 km as an anchor distance; no other independently measured access distances or public-transport details are supplied.
9. Developer & development status
The registered promoter is VIDHATRI HOMES LLP, an LLP, with GSTIN 36AAVFV4823H1ZM. The project record names KROSURI RAMA KOTESWARA RAO as authorized signatory. The supplied promoter address is D.NO. 10-5, Jinnaram, Kazipally- ORRGC, Sangareddy, Telangana, PIN 502309.
The promoter’s website is https://fortunetowers.co.in/. Website descriptions and facilities are promoter-marketed information; they are not treated here as approval or completion evidence.
10. Approvals, official records & documents
TG-RERA certificate, P01100010672: FORM C registration under section 5 for FORTUNE TOWERS; valid 23/09/2025–23/09/2031; certificate issue date 17/03/2026.
HMDA technical approval plan, 061358/ZOC/R1/U6/HMDA/23062023: Technical approval plan dated 28-07-2025, recording site and area data, five residential blocks plus an amenities block, 430 dwelling units, and approval conditions; includes referral to the local authority for final sanction.
HMDA technical approval letter, 061358/ZOC/R1/U6/HMDA/23062023: Technical approval dated 23/09/2025; forwards plans for final sanction and records conditions, including the requirement to obtain an occupancy certificate after completion.
Gaddapotharam Municipality Building Permit Order, G1/131 /GPM/23062023: Building permit dated 12.12.2025 for Blocks A–E and the amenities block, described as Stilt + 5, subject to listed conditions.
Floor-plan and layout records: Some uploaded records are drawing sheets, while other layout-document entries contain only interface text or OCR that does not establish approval particulars. The drawing review records seven drawings, four scans pending and no measured plans.
Promoter Form B declaration: Form B affidavit dated 19-12-2025, with a declared completion undertaking of 23/09/2031 and project-fund and compliance declarations.
No occupancy or completion certificate is included in the supplied project documents.
Frequently asked questions
Is FORTUNE TOWERS registered with Telangana RERA?
Yes. FORTUNE TOWERS is registered with the Telangana Real Estate Regulatory Authority as P01100010672; the registration status is New Project.
Who is the developer of FORTUNE TOWERS?
The promoter named in the RERA registration is VIDHATRI HOMES LLP.
Where is FORTUNE TOWERS located?
FORTUNE TOWERS is in KAZIPALLY- ORRGC, JINNARAM, Sangareddy, Telangana (502309).
When will FORTUNE TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 23/01/2032. This is the promoter's declaration, not a guarantee.
More projects in Jinnaram