Lotus Enclave
BIYYALA VENTURES LLP · Hanamkonda · RERA P00300008931
LOTUS ENCLAVE is a plotted residential layout in Rampur, Khazipet Mandal, Warangal Urban District, developed by registered promoter BIYYALA VENTURES LLP. The layout covers 6 Acer 7.94 Gts 30001 Sq. Yds and comprises 62 plots, with no apartment towers or building floors identified. Plot sizes range from 182.99 to 435.11 sq.m (218.9 to 520.4 sq.yd). Its TG-RERA registration number is P00300008931, and the promoter’s Form B undertaking states completion by 07-08-2026.
More from Biyyala Ventures LLP · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | LOTUS ENCLAVE RERA record |
| Project type | Plotted development / residential layout RERA filing |
| Phase / registered portion | New Project; the registration is for this layout. A separate phase designation is not disclosed. RERA filing |
| TG-RERA registration | P00300008931 Approvals record |
| Registration validity | 07/08/2024 to 07/08/2026, unless extended by the Authority Approvals record |
| Registered promoter | BIYYALA VENTURES LLP RERA filing |
| RERA project status | Recorded as “New Project”; registration certificate issued RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Rampur RERA record |
| Revenue village | Rampur / Rampur Revenue Village RERA record |
| Mandal | Khazipet RERA record |
| District | Warangal Urban RERA record |
| PIN | 506001 RERA record |
| Survey numbers and subdivisions | 599/A/1, 599/A/3, 600/A/1/2, 600/A1 Land records |
| Site extent stated in tentative layout approval | 6 Acer 7.94 Gts 30001 Sq. Yds |
| Area figures in layout drawing | Total Layout Area 25084.19 sq.mt; road-affected area 776.58; net area of plot 24307.61; total net layout 24307.40 |
| Boundaries | North: EXISTING LAYOUT; South: ROAD WIDTH 18 MT; East and West: NAIGHBOURS LAND RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning / approving record | Tentative layout approval issued by GWMC Municipality/Municipal Corporation; drawing identifies TS-DTCP and delegation to Greater Warangal Municipal Corporation |
| Principal approval | 0386/LO/3006/2024, dated 07 August, 2024 Approvals record |
| Layout plot count | 62 plots, as stated in the tentative layout approval and layout drawing |
| Approved built-up area | 0.00 total proposed built-up area, both excluding and including parking, in the layout-plan record; this is a plotted layout, not an apartment-building plan |
| Building / floor configuration | No apartment towers, building floors, or parking levels are identified in the supplied layout records. |
Offering and status
| Item | Record |
|---|---|
| Unit type | Plots RERA filing |
| Plot count and sizes | Drawing-derived schedule states 62 plots; software-measured plot sizes range from 182.99 to 435.11 sq.m (218.9 to 520.4 sq.yd). Layout record |
| Booked / available counts | Not disclosed in the supplied project evidence. |
| Construction stage | No independently verified site-progress status is supplied. The approval requires the developer to complete layout infrastructure and amenities within two years of 07 August, 2024. |
| Promoter-declared completion | Form B undertaking states completion by 07-08-2026. |
| Registration validity versus completion | Registration is valid through 07/08/2026 unless extended; the promoter’s Form B completion undertaking is 07-08-2026. These are separate recorded dates. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied records. The approval on file is for a tentative layout. |
2. The project story
LOTUS ENCLAVE is a 62-plot residential layout in Rampur Revenue Village, Khazipet Mandal, Warangal Urban District. Its registered land identity comprises survey subdivisions 599/A/1, 599/A/3, 600/A/1/2 and 600/A1. The tentative layout approval records plots, internal roads, park/open space, social-infrastructure land and utility land; it does not describe apartment buildings or residential floor plans. RERA record Land records
The approving record requires the owner/developer to complete infrastructure and amenities within two years from 07 August, 2024, and provides for a possible one-year extension on specific request and payment of 20% of the total fee paid at tentative approval. The promoter’s Form B separately undertakes completion by 07-08-2026. Neither the supplied material nor the RERA registration certificate establishes that the layout works have been completed or independently inspected.
3. Master plan, architecture & building design
This is a plotted layout, so the available design evidence concerns plot allocation and layout infrastructure rather than building architecture. The layout drawing’s area statement lists:
| Layout use | Area | Share |
|---|---|---|
| Plotted area | 15152.93 sq.mt | 62.34% |
| Road area | 6113.07 sq.mt | 25.15% |
| Organized open space / park area | 2188.79 sq.mt | 9.00% |
| Social infrastructure area | 608.72 sq.mt | 2.50% |
| Utility area | 243.89 sq.mt | 1.00% |
| Amenity area | 0.00 sq.mt | 0.00% |
| Total net layout | 24307.40 sq.mt | 100.00% |
These are figures transcribed from the layout-plan record; the listed site-area, net-area and component figures are reported as stated rather than reconciled here.
The drawing identifies 62 individual sub-plots and road labels including 12.19M, 10.06M and 9.14 MT roads, an existing road to be widened, and proposed roads. It also labels proposed master-plan roads and access roads; the supplied evidence does not establish that those proposed external roads have been constructed.
The tentative approval reserves 9% for open space, 2.5% for social infrastructure, 1% for utilities and 25.15% for roads, and requires specified land to be handed over to the Municipality/Municipal Corporation by registered gift deed before release of the tentative layout. No building footprint, floor configuration or residential/commercial built-up area is supplied.
4. Homes, configurations & floor plans
This development offers plots, not apartment configurations. The layout drawing’s plot schedule is reported as complete for 62 plots. Plot sizes below are software-measured from that drawing and should be verified against the drawing; they are not RERA-filed saleable-area figures. Layout record
| Plot-size band | Plot count |
|---|---|
| 200–250 sq.yd (167–209 sq.m) | 14 |
| 250–300 sq.yd (209–251 sq.m) | 23 |
| 300–400 sq.yd (251–334 sq.m) | 22 |
| 400–500 sq.yd (334–418 sq.m) | 2 |
| 500–1000 sq.yd (418–836 sq.m) | 1 |
The software-measured minimum is 182.99 sq.m (218.9 sq.yd), median 235.92 sq.m (282.2 sq.yd), and maximum 435.11 sq.m (520.4 sq.yd). The area statement reports a plotted area of 15152.93 sq.mt. No plot-wise booking or availability information is supplied. Layout record
No unit floor plans or room measurements are available for this plotted project. A plot’s area is not a building’s carpet area, saleable area or built-up area. The layout approval states that only detached dwelling houses designed for occupation by a single family may be built on a site, and that sites may not be altered, subdivided or used for more than one family. Floor plans
5. Parking & vehicle circulation
The supplied approval records do not state a common-parking area or provide a sanctioned parking-space count. The layout drawing lists common parking area as 0.00, and no individual plot parking allocation is supplied. A plot purchaser should not treat a drawn or inferred vehicle space as an exclusive parking right.
Internal circulation is represented through the layout’s road-area allocation and road-width labels. The tentative approval requires roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site. It does not establish completed road works, parking bays, ramps, pedestrian separation or EV-charging provision.
6. Amenities, recreation & open spaces
The project’s layout and approval records identify open space, social-infrastructure land, utility land and infrastructure obligations. The RERA amenity entries show availability marked “YES” for several infrastructure categories, but their reported progress percentages are 0; these entries are not evidence of completed facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2188.79 sq.mt; 9.00% in the layout drawing | Required in the tentative approval; reported progress is 0. Independent completion verification is not supplied. | |
| Social infrastructure | 608.72 sq.mt; 2.50% in the layout drawing | Land is reserved; no completed community facility is evidenced. | |
| Tot-lot | Identified as a layout amenity; no size supplied | No completion evidence supplied. | |
| Utility land | 243.89 sq.mt; 1.00% in the layout drawing | Land is reserved; infrastructure completion is not independently verified. | |
| Internal roads and footpaths | Road area 6113.07 sq.mt; layout drawing labels multiple internal road widths | RERA amenities | RERA entry marked “YES”; reported progress is 0. Completion is not verified. |
The tentative approval also requires development of the park, construction of infrastructure and gift-deed handover of designated areas. The supplied records do not establish delivery of indoor games, clubhouse facilities or other recreational features.
7. Utilities, building services & safety
The tentative layout approval lists infrastructure to be provided, including internal water-supply pipelines, a protected water supply system, overhead tank and/or sump, septic tank or sewerage treatment plant as applicable, underground drainage lines, storm-water drains, electrical supply lines, transformer, street lights, solid-waste management and rainwater-harvesting pits. These are approval requirements or proposed infrastructure; the evidence does not establish their construction, capacity or operation.
The RERA amenity register marks water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station as “YES”; each supplied progress field is 0. No system capacities, fire-clearance documents, installed backup, CCTV, accessibility details or independent commissioning evidence are provided. RERA amenities
8. Location, access & connectivity
The registered project location is Rampur, Khazipet Mandal, Warangal Urban District, Telangana, PIN 506001. The layout records identify road access labels, including a “60.00MT WIDE MAINROAD (Access Road),” a “12.19MT WIDE MAINROAD (Access Road),” and a “18.29 MT WIDE PROPOSED ROAD.” These are drawing labels; the supplied evidence does not verify the present condition or completion of those roads. RERA record
The supplied location data provides one sampled Outer Ring Road interchange distance of 113.1 km, labelled approximate. No verified public-transport details or other measured local distances are provided in the project evidence. Location record
9. Developer & development status
The registered promoter is BIYYALA VENTURES LLP, an LLP. The RERA record identifies Biyyala Dayakar Rao as an authorized signatory and Biyyala Venkata Papa Rao as a partner; the Form B declaration is made by Dayakar Rao Biyyala on behalf of the LLP. The project registration certificate lists the promoter address as Village Bachupally, Mandal Bachupally, District Medchal-Malkajgiri, PIN 500090. Corporate record Parties record
The project record supplies GSTIN 36AAWFB9931F1ZY. No official project contact details or promoter website are supplied in the evidence. Corporate record RERA filing
This is a single plotted-layout registration in the supplied record; no separate tower or phase-wise construction status is disclosed. The tentative approval sets an infrastructure-completion timeframe from 07 August, 2024, and the promoter’s Form B undertakes completion by 07-08-2026. No verified physical-progress report or occupancy/completion certificate is included in the supplied evidence.
10. Approvals, official records & documents
| Details | LOTUS ENCLAVE; registration P00300008931; validity 07/08/2024–07/08/2026 unless extended |
|---|---|
| Source | Approvals record |
| Details | 0386/LO/3006/2024, dated 07 August, 2024; issued by GWMC Municipality/Municipal Corporation; 62 plots |
|---|
| Details | Drawing records survey subdivisions 599/A/1, 599/A/3, 600/A/1/2 and 600/A1; identifies layout land uses and road labels |
|---|
| Details | Application No. 010243/LO/DTCP/3006/0344/2023; other references include LTP No. /LO/3006/2023, TLP No. 0262/LO/3006/2022, and DP Nos. 15/2019, 01/2021 and 22/2014 |
|---|
| Details | Form B affidavit includes the promoter’s completion undertaking of 07-08-2026 and project-account and other declarations |
|---|
| Details | Not identified in the supplied project documents; the available layout approval is tentative |
|---|
1. Project at a glance
Project identity
Registered project name: LOTUS ENCLAVE
Project type: Plotted development / residential layout
Phase / registered portion: New Project; the registration is for this layout. A separate phase designation is not disclosed.
TG-RERA registration: P00300008931
Registration validity: 07/08/2024 to 07/08/2026, unless extended by the Authority
Registered promoter: BIYYALA VENTURES LLP
RERA project status: Recorded as “New Project”; registration certificate issued
Land and geographic identity
Locality: Rampur
Revenue village: Rampur / Rampur Revenue Village
Mandal: Khazipet
District: Warangal Urban
PIN: 506001
Survey numbers and subdivisions: 599/A/1, 599/A/3, 600/A/1/2, 600/A1
Site extent stated in tentative layout approval: 6 Acer 7.94 Gts 30001 Sq. Yds
Area figures in layout drawing: Total Layout Area 25084.19 sq.mt; road-affected area 776.58; net area of plot 24307.61; total net layout 24307.40
Boundaries: North: EXISTING LAYOUT; South: ROAD WIDTH 18 MT; East and West: NAIGHBOURS LAND
Development identity
Sanctioning / approving record: Tentative layout approval issued by GWMC Municipality/Municipal Corporation; drawing identifies TS-DTCP and delegation to Greater Warangal Municipal Corporation
Principal approval: 0386/LO/3006/2024, dated 07 August, 2024
Layout plot count: 62 plots, as stated in the tentative layout approval and layout drawing
Approved built-up area: 0.00 total proposed built-up area, both excluding and including parking, in the layout-plan record; this is a plotted layout, not an apartment-building plan
Building / floor configuration: No apartment towers, building floors, or parking levels are identified in the supplied layout records.
Offering and status
Unit type: Plots
Plot count and sizes: Drawing-derived schedule states 62 plots; software-measured plot sizes range from 182.99 to 435.11 sq.m (218.9 to 520.4 sq.yd).
Booked / available counts: Not disclosed in the supplied project evidence.
Construction stage: No independently verified site-progress status is supplied. The approval requires the developer to complete layout infrastructure and amenities within two years of 07 August, 2024.
Promoter-declared completion: Form B undertaking states completion by 07-08-2026.
Registration validity versus completion: Registration is valid through 07/08/2026 unless extended; the promoter’s Form B completion undertaking is 07-08-2026. These are separate recorded dates.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied records. The approval on file is for a tentative layout.
2. The project story
LOTUS ENCLAVE is a 62-plot residential layout in Rampur Revenue Village, Khazipet Mandal, Warangal Urban District. Its registered land identity comprises survey subdivisions 599/A/1, 599/A/3, 600/A/1/2 and 600/A1. The tentative layout approval records plots, internal roads, park/open space, social-infrastructure land and utility land; it does not describe apartment buildings or residential floor plans.
The approving record requires the owner/developer to complete infrastructure and amenities within two years from 07 August, 2024, and provides for a possible one-year extension on specific request and payment of 20% of the total fee paid at tentative approval. The promoter’s Form B separately undertakes completion by 07-08-2026. Neither the supplied material nor the RERA registration certificate establishes that the layout works have been completed or independently inspected.
3. Master plan, architecture & building design
This is a plotted layout, so the available design evidence concerns plot allocation and layout infrastructure rather than building architecture. The layout drawing’s area statement lists:
| Layout use | Area | Share |
|---|---|---|
| Plotted area | 15152.93 sq.mt | 62.34% |
| Road area | 6113.07 sq.mt | 25.15% |
| Organized open space / park area | 2188.79 sq.mt | 9.00% |
| Social infrastructure area | 608.72 sq.mt | 2.50% |
| Utility area | 243.89 sq.mt | 1.00% |
| Amenity area | 0.00 sq.mt | 0.00% |
| Total net layout | 24307.40 sq.mt | 100.00% |
These are figures transcribed from the layout-plan record; the listed site-area, net-area and component figures are reported as stated rather than reconciled here.
The drawing identifies 62 individual sub-plots and road labels including 12.19M, 10.06M and 9.14 MT roads, an existing road to be widened, and proposed roads. It also labels proposed master-plan roads and access roads; the supplied evidence does not establish that those proposed external roads have been constructed.
The tentative approval reserves 9% for open space, 2.5% for social infrastructure, 1% for utilities and 25.15% for roads, and requires specified land to be handed over to the Municipality/Municipal Corporation by registered gift deed before release of the tentative layout. No building footprint, floor configuration or residential/commercial built-up area is supplied.
4. Homes, configurations & floor plans
This development offers plots, not apartment configurations. The layout drawing’s plot schedule is reported as complete for 62 plots. Plot sizes below are software-measured from that drawing and should be verified against the drawing; they are not RERA-filed saleable-area figures.
200–250 sq.yd (167–209 sq.m): 14
250–300 sq.yd (209–251 sq.m): 23
300–400 sq.yd (251–334 sq.m): 22
400–500 sq.yd (334–418 sq.m): 2
500–1000 sq.yd (418–836 sq.m): 1
The software-measured minimum is 182.99 sq.m (218.9 sq.yd), median 235.92 sq.m (282.2 sq.yd), and maximum 435.11 sq.m (520.4 sq.yd). The area statement reports a plotted area of 15152.93 sq.mt. No plot-wise booking or availability information is supplied.
No unit floor plans or room measurements are available for this plotted project. A plot’s area is not a building’s carpet area, saleable area or built-up area. The layout approval states that only detached dwelling houses designed for occupation by a single family may be built on a site, and that sites may not be altered, subdivided or used for more than one family.
5. Parking & vehicle circulation
The supplied approval records do not state a common-parking area or provide a sanctioned parking-space count. The layout drawing lists common parking area as 0.00, and no individual plot parking allocation is supplied. A plot purchaser should not treat a drawn or inferred vehicle space as an exclusive parking right.
Internal circulation is represented through the layout’s road-area allocation and road-width labels. The tentative approval requires roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site. It does not establish completed road works, parking bays, ramps, pedestrian separation or EV-charging provision.
6. Amenities, recreation & open spaces
The project’s layout and approval records identify open space, social-infrastructure land, utility land and infrastructure obligations. The RERA amenity entries show availability marked “YES” for several infrastructure categories, but their reported progress percentages are 0; these entries are not evidence of completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2188.79 sq.mt; 9.00% in the layout drawing | Required in the tentative approval; reported progress is 0. Independent completion verification is not supplied. | |
| Social infrastructure | 608.72 sq.mt; 2.50% in the layout drawing | Land is reserved; no completed community facility is evidenced. | |
| Tot-lot | Identified as a layout amenity; no size supplied | No completion evidence supplied. | |
| Utility land | 243.89 sq.mt; 1.00% in the layout drawing | Land is reserved; infrastructure completion is not independently verified. | |
| Internal roads and footpaths | Road area 6113.07 sq.mt; layout drawing labels multiple internal road widths | RERA entry marked “YES”; reported progress is 0. Completion is not verified. |
The tentative approval also requires development of the park, construction of infrastructure and gift-deed handover of designated areas. The supplied records do not establish delivery of indoor games, clubhouse facilities or other recreational features.
7. Utilities, building services & safety
The tentative layout approval lists infrastructure to be provided, including internal water-supply pipelines, a protected water supply system, overhead tank and/or sump, septic tank or sewerage treatment plant as applicable, underground drainage lines, storm-water drains, electrical supply lines, transformer, street lights, solid-waste management and rainwater-harvesting pits. These are approval requirements or proposed infrastructure; the evidence does not establish their construction, capacity or operation.
The RERA amenity register marks water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station as “YES”; each supplied progress field is 0. No system capacities, fire-clearance documents, installed backup, CCTV, accessibility details or independent commissioning evidence are provided.
8. Location, access & connectivity
The registered project location is Rampur, Khazipet Mandal, Warangal Urban District, Telangana, PIN 506001. The layout records identify road access labels, including a “60.00MT WIDE MAINROAD (Access Road),” a “12.19MT WIDE MAINROAD (Access Road),” and a “18.29 MT WIDE PROPOSED ROAD.” These are drawing labels; the supplied evidence does not verify the present condition or completion of those roads.
The supplied location data provides one sampled Outer Ring Road interchange distance of 113.1 km, labelled approximate. No verified public-transport details or other measured local distances are provided in the project evidence.
9. Developer & development status
The registered promoter is BIYYALA VENTURES LLP, an LLP. The RERA record identifies Biyyala Dayakar Rao as an authorized signatory and Biyyala Venkata Papa Rao as a partner; the Form B declaration is made by Dayakar Rao Biyyala on behalf of the LLP. The project registration certificate lists the promoter address as Village Bachupally, Mandal Bachupally, District Medchal-Malkajgiri, PIN 500090.
The project record supplies GSTIN 36AAWFB9931F1ZY. No official project contact details or promoter website are supplied in the evidence.
This is a single plotted-layout registration in the supplied record; no separate tower or phase-wise construction status is disclosed. The tentative approval sets an infrastructure-completion timeframe from 07 August, 2024, and the promoter’s Form B undertakes completion by 07-08-2026. No verified physical-progress report or occupancy/completion certificate is included in the supplied evidence.
10. Approvals, official records & documents
| Details | LOTUS ENCLAVE; registration P00300008931; validity 07/08/2024–07/08/2026 unless extended |
|---|
| Details | 0386/LO/3006/2024, dated 07 August, 2024; issued by GWMC Municipality/Municipal Corporation; 62 plots |
|---|
| Details | Drawing records survey subdivisions 599/A/1, 599/A/3, 600/A/1/2 and 600/A1; identifies layout land uses and road labels |
|---|
| Details | Application No. 010243/LO/DTCP/3006/0344/2023; other references include LTP No. /LO/3006/2023, TLP No. 0262/LO/3006/2022, and DP Nos. 15/2019, 01/2021 and 22/2014 |
|---|
| Details | Form B affidavit includes the promoter’s completion undertaking of 07-08-2026 and project-account and other declarations |
|---|
| Details | Not identified in the supplied project documents; the available layout approval is tentative |
|---|
Other registrations of Lotus Enclave
Frequently asked questions
Is LOTUS ENCLAVE registered with Telangana RERA?
Yes. LOTUS ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00300008931; the registration status is New Project.
Who is the developer of LOTUS ENCLAVE?
The promoter named in the RERA registration is BIYYALA VENTURES LLP.
Where is LOTUS ENCLAVE located?
LOTUS ENCLAVE is in RAMPUR, Khazipet, Hanamkonda, Telangana (506001).
When will LOTUS ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 07/12/2026. This is the promoter's declaration, not a guarantee.
More projects in Rampur