Maharaja Kosmopolis Tower A

SAMVIR ESTATES LLP AND OTHERS · Sangareddy · RERA P01100011169

MAHARAJA KOSMOPOLIS TOWER A is a residential apartment project in Kollur(TM), RC PURAM, Sangareddy. It is being developed by SAMVIR ESTATES LLP AND OTHERS on a site extent of 42393.27 sqmts, with five residential blocks and a clubhouse; Blocks A–D have 3 Cellars + 1 Stilt + 40 upper floors each, and Block E has 3 Cellars + 1 Stilt + 38 upper floors. The RERA-filed home configuration is 394 3BHK units. Its TG-RERA registration is P01100011169, and the proposed completion date is 30/11/2031.

More from Samvir Estates LLP · 2 projects →

01What we found

RegisteredTG-RERA - valid till 30 Jul 2031
52documents on file - each fact links to its page
6court cases on this project's land (survey 275, 278, Kollur)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameMAHARAJA KOSMOPOLIS TOWER A RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionTG-RERA identifies the project as “TOWER A”; the registration certificate and available records do not establish a separate phase scope. A phased-wise development plan is on file, but its phase allocation is not specified in the extracted text. RERA record
TG-RERA registrationP01100011169; certificate issued 31/08/2026; valid 30/07/2026–30/07/2031. This is registration validity, not the completion deadline. Approvals record
Registered promoterSAMVIR ESTATES LLP AND OTHERS RERA record RERA filing
RERA statusRegistration certificate on file; not shown as extended.

Land and geographic identity

FieldRecord
Locality / revenue villageKollur(TM) / KOLLUR RERA record Land records
Mandal / district / PINRC PURAM, Sangareddy, 502300 RERA record RERA filing
Project survey numbers and subdivisions275/PART AND 278/PART RERA record Land records
Site extentTotal area 42393.27 sqmts; area affected in road widening/FTL/Nala widening 2828.07 sqmts; net area 39565.20 sqmts in the RERA project fields. RERA filing
HMDA plan area figuresPlot area 42393.27; road-affected area 2828.07; net plot area 39557.44; balance plot area 34377.76. These are figures recorded in the filed plan material.
Boundaries (RERA filing)East: Neighbours Land; West: Neighbours Land; North: Future Construction of Ranjitha Singh and others; South: 15Mts wide Existing 30Mts wide Proposed Road. RERA filing

Development identity

FieldRecord
Sanctioning authority / principal permissionHyderabad Metropolitan Development Authority (HMDA); building-permission file 000640/BP/HMDA/0160/SKP/2025. The filed approval document gives the approval date as “.07.2026” (day not legible in the extracted record). Approvals record
Approved built-up area349244.08 excluding parking; 449942.06 including parking, as recorded in the plan extraction.
Buildings in the HMDA permissionFive residential blocks—A, B, C, D and E—and a clubhouse.
Sanctioned floor configurationBlocks A–D: 3 Cellars + 1 Stilt + 40 upper floors each. Block E: 3 Cellars + 1 Stilt + 38 upper floors. Clubhouse: 3 Cellars + 1 Ground + 3 upper floors.
Heights / floor counts in filed plan extractionBlocks A–D: 41 floors and 119.20 MT building height each; Block E: 39 floors and 119.70 MT; clubhouse: 4 floors and 15.10 MT.
ParkingFiled plan extraction states No of Cars Proposed 1986. The plan material also records cellar/stilt use for parking; no verified unit-wise allocation is available here.
Unit countsThe RERA unit record lists 398 total units, including 394 3BHK homes and four rows recorded as floor labels rather than homes. The RERA fields state 2 total/proposed building units; the building-permission document lists five residential blocks plus a clubhouse. RERA unit table RERA filing

Offering and status

FieldRecord
RERA-filed home configuration3BHK, 394 units; saleable area 198.21 sqm per unit. RERA unit table RERA unit details
Booked / availableRERA portal-derived unit record shows 0 booked / 394 available for 3BHK; the record has no as-of date, so counts are indicative. RERA unit table
Construction stageNo verified construction-progress percentage or independently verified site status is supplied. RERA registration is active for the stated validity period; registration alone does not establish construction progress. Approvals record Document index
Completion datesPromoter’s Form B undertaking states 30/07/2031; the project header records proposed completion 30/11/2031. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied for the project or any tower. Document index

2. The project story

MAHARAJA KOSMOPOLIS TOWER A is registered as a residential apartment project on land in Kollur revenue village, RC PURAM mandal, Sangareddy district, in survey subdivisions 275/PART and 278/PART. Its HMDA building-permission record describes a high-rise scheme with residential Blocks A–E and a separate clubhouse. RERA record Land records

The RERA unit information identifies 394 three-bedroom homes. The project’s declared unit table also contains four entries labelled “First Floor,” “Ground Floor,” “Second Floor” and “Third Floor”; these are not counted as sale homes in the normalized unit record. The available evidence does not establish tower-by-tower unit distribution or a verified construction stage. RERA unit table RERA unit details

The promoter’s completion undertaking is 30/07/2031, while the project header gives a proposed completion date of 30/11/2031. No tower-specific completion schedule or occupancy/completion certificate is supplied. RERA record Document index

3. Master plan, architecture & building design

The filed HMDA permission describes five residential blocks and a clubhouse. Blocks A–D are each specified as three cellars, one stilt and 40 upper floors; Block E as three cellars, one stilt and 38 upper floors; and the clubhouse as three cellars, one ground floor and three upper floors. The plan extraction records respective heights of 119.20 MT for Blocks A–D, 119.70 MT for Block E and 15.10 MT for the clubhouse.

The filed plan reports 349244.08 total proposed built-up area excluding parking and 449942.06 including parking. These figures are not identified as carpet area or saleable area. The same plan record gives a minimum plot area of 42393.27, road-affected area of 2828.07, net plot area of 39557.44 and balance plot area of 34377.76.

A phased-wise development plan names the clubhouse and five towers, but the extracted record does not specify which towers belong to each phase. The public HMDA DPMS approved-layout lookup is reported unavailable from the public internet; no independent layout lookup result is supplied. HMDA

The RERA portal’s project fields list two proposed building units, while the HMDA permission and filed plan material describe five residential blocks plus a clubhouse. The Overview records both supplied descriptions without treating the two-building field as a building-by-building plan. RERA filing

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK3940394198.21 sqmNot measured in supplied drawing reviewNot supplied

RERA unit table RERA unit details Floor plans

The four additional unit-table rows are floor labels, not homes for sale, and are excluded from the home count. RERA unit table RERA unit details

The filed RERA figure is saleable area, not carpet area. Drawing-based carpet measurement is not available: of 17 drawing records, 16 are pending scan review, one has no flats, and none has a completed software measurement. Accordingly, no room dimensions, balcony/utility measurements or carpet-area figures can be stated from the supplied drawing review. Floor plans

5. Parking & vehicle circulation

The filed plan extraction records 1986 proposed car spaces and specifies that cellar/stilt floors are for parking. It also states that no parking or construction is to be placed in setback areas. The supplied records do not establish visitor or accessible-space counts, two-wheeler provision, parking allocation to individual homes, or a verified parking-space ownership arrangement.

The HMDA permission conditions require one entry and one exit to the premises, each with minimum width 4.5 mtrs and height clearance 5 mtrs. The plan extraction also identifies road widths of 12.00M, 15.00 MT, 30.00 MT and 200'0"; the available text does not map each width to a particular internal or external road segment.

6. Amenities, recreation & open spaces

Clubhouse
Description / sizeSeparate clubhouse building; 3 Cellars + 1 Ground + 3 upper floors
Evidence sourceHMDA building-permission record; phased-wise plan
Declared progress / verified statusApproved in the filed permission; completion not verified
Green strip / tot-lot / park
Description / sizeListed as a project facility; no size or capacity supplied
Evidence sourceRERA amenity record RERA amenities; filed plan extraction
Declared progress / verified statusRERA-listed; progress recorded as 0%; not independently verified
Internal roads and footpaths
Description / sizeListed; no dimensions or progress detail supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Community buildings
Description / sizeListed in RERA amenity record; no further description supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified

The RERA amenity record also lists water supply, sewerage and sewage treatment, storm-water drains, street lighting, solid-waste management, rainwater harvesting, energy management, fire protection, electrical meter room/sub-station/receiving station and aggregate recreational open space. These are recorded as proposed/available items in the filing; the supplied record gives no completed-status verification, and several entries have no further size or design detail. RERA amenities

7. Utilities, building services & safety

The filed HMDA permission requires rainwater-harvesting structures and pits, storm-water drainage, an STP, treated sewage reuse for gardening, garbage house and refuse chute, and provisions for a transformer. It records underground and terrace water tanks of 25,000 litres each for the specified residential buildings, and requires the applicant to approach HMWS&SB for bulk water supply or provide a water-treatment plant. These are permission requirements or filed facility provisions, not evidence that the systems are installed or operational.

Fire and life-safety conditions in the permission include hose reels/down-comers, manual alarm systems, emergency lighting in corridors/common passages and staircases, fire extinguishers, and automatic sprinklers where basement area exceeds 200 Sq.mtrs. The permission also requires clearance from T.S. Fire Services before application for an occupancy certificate and requires construction to follow the approved plans. The supplied material does not include a fire clearance or verified completion of these systems.

The permission calls for generator backup, electrical installation certification, fire-resistant transformer protection and construction of services under competent technical supervision. No lift count, lift capacity, accessible-circulation details, security-system specification or verified utility connection status is supplied.

8. Location, access & connectivity

The registered project location is Kollur(TM), Kollur revenue village, RC PURAM mandal, Sangareddy district, PIN 502300. The project boundary information identifies neighbouring land to the east and west, “Future Construction of Ranjitha Singh and others” to the north, and a “15Mts wide Existing 30Mts wide Proposed Road” to the south. RERA record RERA filing

The RERA-filed location record does not provide named approach roads, transit services or landmark distances. A separate location dataset lists nearby points and measured distances, including Preeti Urology & Kidney Hospital, BHEL, Lingampally (0.1 km), Lingampalli railway station (1.4 km), Keerthi Mahal Bus Stop (2.1 km) and Miyapur Metro (5.9 km); these are location-data measurements, not RERA-filed travel-time claims. Location record

9. Developer & development status

The registered promoter is SAMVIR ESTATES LLP AND OTHERS, an LLP, with GSTIN 36AEMFS1662J1ZM. The RERA promoter address on file is 4th Floor, Flat No.401, Road No.36, Kollur (TM), RC PURAM, Sangareddy, 502300. The registration certificate separately prints the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” No official website or contact details are supplied. RERA record Corporate record RERA filing

The promoter’s Form B declaration, signed by authorized signatory SRI. VIVEK NAIDU G, states a completion undertaking of 30/07/2031 and refers to registered Development Agreement cum General Power of Attorney Nos. 24745/2023 and 30738/2025. A separate affidavit dated 01.08.2026 identifies the landowners and joint promoters and undertakes that units will not be booked or offered for sale until a supplementary allocation agreement is executed; the affidavit says that agreement was pending at that date. These are promoter declarations, not independent verification of progress or allocation.

No construction-progress percentage, verified site inspection, tower-wise completion schedule or occupancy certificate is supplied. The RERA registration is valid through 30/07/2031; that validity date is distinct from the promoter’s completion undertaking and the header’s proposed completion date. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / scopeP01100011169; MAHARAJA KOSMOPOLIS TOWER A; validity 30/07/2026–30/07/2031
HMDA building permission
Identifier / scope000640/BP/HMDA/0160/SKP/2025; multistoried residential development on Sy. Nos. 275/PART and 278/PART; approval date appears as “.07.2026” in the extracted permission
Filed plan material
Identifier / scopeHMDA plan record lists Blocks A–E and clubhouse, floor configurations, area figures and proposed car parking
Phased-wise development plan
Identifier / scopeClubhouse and Towers A–E; phase allocation not specified in the extracted text
Commencement/local-body clarification
Identifier / scopePromoter clarification says the local-body proceedings were digitally signed by the Commissioner of Cyberabad Municipal Corporation; the supplied extraction does not provide the proceedings identifier or the certificate itself
Structural clearance cited in permission
Identifier / scopeJNTU/CEH/CIVIL/PC/10510/2025, dated 04.11.2025
Environmental clearance cited in permission
Identifier / scopeSEIAAEC No. EC24B3812TG5107564N, dated 11.02.2025
Road gift-deed references in permission
Identifier / scope19443 of 2024, 3175 of 2026, and 3176 of 2026
Registration-stage documents
Identifier / scopeForm B declaration and supplementary-allocation affidavit

No occupancy or completion certificate is supplied. The public HMDA DPMS approved-layout lookup is reported as unavailable from the public internet; this is an access limitation, not a determination about the approval record. Document index HMDA

Other registrations of Maharaja Kosmopolis

Frequently asked questions

Is MAHARAJA KOSMOPOLIS TOWER A registered with Telangana RERA?

Yes. MAHARAJA KOSMOPOLIS TOWER A is registered with the Telangana Real Estate Regulatory Authority as P01100011169; the registration status is New Project.

Who is the developer of MAHARAJA KOSMOPOLIS TOWER A?

The promoter named in the RERA registration is SAMVIR ESTATES LLP AND OTHERS.

Where is MAHARAJA KOSMOPOLIS TOWER A located?

MAHARAJA KOSMOPOLIS TOWER A is in Kollur(TM), KOLLUR, RC PURAM, Sangareddy, Telangana (502300).

When will MAHARAJA KOSMOPOLIS TOWER A be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2031. This is the promoter's declaration, not a guarantee.